HomeMy WebLinkAboutPlanning 10/23/2019Planning Board Minutes RECEIVED
October 23, 2019 il)``N CLERKS 0 FICE
Present: Donald Cleary, Chair; Richard LeBlanc, Clerk; Beth Ashman-CoWfT,,8glq�PeXj3) 00
Michael McClanahan, Joseph Cerretani; Sharon Friedman, Alternate
Shaun P. Burke, Director of Planning and Development; Jennifer Davis, Admire A� tiy'e 1 E L D
Secretaryc.S A,r-,GHUI E
i��t.,,..,r.�STTS
Motion: To appoint Ms. Ashman -Collins Acting Clerk
(McClanahan -Penney) All in favor. PASSES
Minutes October 9, 2019 p. 3, 2d para — to regulate "things"
Motion: To accept as amended
(Cerretani-McClanahan) Six in favor. Friedman abstained. PASSES
Public Hearing Notices — Easton, Plainville
The board discussed the October 19 Master Plan Open House; Mr. Burke said about 218
people signed in at the event. Ms. Friedman said she thought the format of the open house
was conducive to discussion. Mr. Burke said the goal was to get as much public participation
and comment as possible and he thinks it was very successful.
Mr. Cleary said the MBTA is offering a ride service called TransLoc from the commuter rail
station, which is currently free. Mr. Cleary asked when the platform work will be done; Mr.
Buke said that is supposed to be done in November.
Mr. Penney asked if there is anything new on the northern access to the commuter rail parking
lots; Mr. Burke said he thinks it will still happen, and the town is moving ahead with the
design for the roundabout and crossing. There are also land swaps and easements to be
worked out, and it would probably be four to five years before it will be completed.
Mr. Burke said Special Town Meeting will be November 5; the board's zoning article on
"5G" is Article 12. Mr. Penney said he has spoken with Lt. Archer, who he thinks would be a
good resource on that technology.
Mr. Cleary reminded the board of the October 30 Planning Board meeting at 6:30pm for the
public hearing for the citizens' petition billboard article, followed by the Master Plan
Committee meeting.
Minutes July 17, 2019
Motion: To accept as submitted
(Penney -Friedman) Four in favor. McClanahan, Cerretani, Cleary abstained. PASSES
The clerk read the public hearing notice. There was no applicant representative present.
Planning Board 1 10/23/2019
[Mr. LeBlanc arrived at 7:20 p.m.]
The public hearing was tabled until 7:30 p.m.
Mr. Burke said he hopes to have something from the consultant for the October 30 Master Plan
meeting. Mr. Cerretani said there were a lot of new faces at the open house; Ms. Friedman said
she thought there was a good cross-section of recent and veteran residents.
Mr. Burke said 44 Cabot Boulevard will be requesting an extension of their special permit.
Mr. Cerretani said APR on Central Street has recently sold; Mr. Burke said the new owners plan
to use the existing building and some outside storage.
Motion: To continue the 283 Gilbert Street scenic road to November 13, 2019 at 7:05 p.m.
(McClanahan -Penney) All in favor. PASSES
conducted.
Attorney Edward Valanzola explained the application for a recreational marijuana establishment
at 321 School Street, in the space formerly occupied by Orange Leaf frozen yogurt. He said the
site is over 500 feet from any school or day care center. They have looked at the issues the board
will consider under the special permit by-law and believe they have addressed all the issues.
Attorney Valanzola explained the applicant has already entered into a Host Community
Agreement with the town for a retail marijuana establishment at this location, which will include
payments to the town from gross revenues and donations to local charities.
Attorney Valanzola introduced reLeaf President Connor McLaughlin; Chief Security Officer
Michael Allen; Stephen Farr and Nijdeh Haven, Nitsche Engineering; Jason Sidman, real estate
consultant; Tom Pozerski, Merrill Engineering; Attorney Frank Sciacca, Counsel to reLeaf
Mr. McLaughlin, explained they are seeking a special permit to open an adult use retail
marijuana dispensary in an existing, approximately 3,000 square foot space at 321 School Street.
The vestibule will be expanded to accommodate people waiting to enter the business and to
avoid having people waiting outside the building. There are 201 existing parking spaces for the
plaza. Mr. McLaughlin said they plan to have a variety of products and services and said 50% of
consumers use non-traditional marijuana products.
Mr. McLaughlin said they plan to do community outreach meetings, will have educational
materials on site and staff will be trained to greet customers on the safest uses of the products.
Planning Board
10/23/2019
He said they are in a strong financial situation, have no outstanding debts and work with a credit
union that allows recreational marijuana business deposits. Their deposits will be carried by
courier services. Mr. McLaughlin said they have a guaranteed supply through Sanctuary
Medicinals, a 35,000 square foot cultivation facility in Littleton, MA. He said all their product is
delivered pre -packaged with bar codes to track the items.
The business plans to donate 100 volunteer service hours in the community and plans to offer
jobs to Mansfield residents first.
Mr. McClanahan asked if there will be any odor; Mr. McLaughlin said nothing is opened within
the store, and no consumption will be allowed in the store or the parking lot, so there will be no
odor. There will be security personnel to prevent consumption in the parking lot.
Mr. Penney asked if they can refuse service to customers; Mr. McLaughlin said they have
software to help control who comes and goes from the facility, and who is not allowed.
Security
Mr. Allen, a former police officer and police chief in Rochester, NH and reLeaf s chief of
security, explained he learned about this business when a cultivation facility opened in his
community and management worked with his department to develop their security plans. He
said he has met with the Chief Sellon, Deputy Chief Ellsworth and Lt. Bain to talk about the
security plan.
Mr. Allen explained customers will enter the expanded vestibule, their identification is checked
to ensure they are 21 years of age, the identification is verified through an electronic scanner,
which can detect if the id has been altered. He said the company wants to make sure the
products do not get into the hands of someone under 21. Mr. Allen explained no one will be
allowed into the facility if they are under the influence of alcohol or drugs, or if there is any
indication they intend to supply the product to people under 21. He said they intend to adhere to
the sale amount limits, and the technology will also track the identification. They will have the
ability to ban customers from the facility. All retailers have a "seed to sale" system to report to
the state. Mr. Allen said he has suggested to communities with more than one dispensary they
use the identification verification systems to link the stores to prevent people from buying more
than the allowed daily limit.
Mr. Allen said the facility will have an electronic access door, so people will not be able to walk
into the sales floor without being escorted. When people enter the facility, they will be guided
throughout to the sales area. "Level 3" places like the vault, where cash and product are kept,
will be very secure. He said he is certified in "crime prevention through building design," a
program designed to reduce the possibility of a crime occurring; those principals have been used
in the security plan and in the design of the facility.
Mr. Allen said the camera system is one of their biggest assets because it provides complete
camera coverage and gives the Police Department eyes on the facility at all times. Police
Officers could also have an app on their phones so they can view the cameras. Mr. Penney asked
about security in the parking lot; Mr. Allen said they will practice situational awareness inside
Planning Board 3 10/23/2019
and outside the facility. The Police Department will also be able to remotely view the cameras in
the parking lot. He said there will be signage at the door letting people know the area is under
video surveillance, and signage to prevent loitering and consumption in the parking lot. Mr.
Allen said there will be on -site security inside and outside the facility. Mr. Penney said he is
concerned about people using the products in the parking lot, then driving. Mr. Allen said he
thinks their security system will prevent that. He said he has been involved in 20 facilities
around the Commonwealth, and thinks they have learned from the mistakes of the first few that
opened. He said they have contingency plans in place to mitigate issues that might happen upon
initial opening, including requiring customers come by appointment only. He said stores that
opened using an appointment systems found they did not need them after two to four weeks. He
said one of Chief Sellon's concerns is traffic; Mr. Allen said the appointment system has been
successful in traffic mitigation in other communities.
Mr. Allen said they will always have an unarmed, uniformed officer on site during operating
hours and will have Mansfield Police Department officers on detail at the beginning. Chief
Sellon has also been concerned about officer availability, especially during Xfinity and Gillette
events. He said they will have a general idea of how to control traffic, but want to be flexible
about when to make changes. He said he plans to meet weekly with Chief Sellon to assess traffic
and crowds.
Mr.Allen said the proposed hours of operation are 10:00 a.m. to 10 p.m., seven days a week.
Mr. Cerretani asked if state law prohibitshours of operation; Mr. Allen said it does not.
Mr. Allen said the alarm system will include panic alarms, motion detectors and broken glass
detectors. He said the state requires the safety system, so this site will be very secure.
Mr. Allen explained transportation of product is important, and said they will probably have two
deliveries a week, which will come in a low -profile van with no advertising and no windows.
There will be two agents delivering the product, and the vehicle has gps, secure communications,
panic alarms and a secure vault. The delivery routes, days of the week and time of the day will
be randomized. Mr. Penney asked the value of a delivery; Mr. Allen said it would be significant.
He said there have been no attempted robberies since medical marijuana or recreational
marijuana became legal in the Commonwealth. Mr. Cleary asked if deliveries would be made
through the front or back of the building; Mr. Allen said deliveries would come to the back.
They will notify the Police Department of the deliveries so they can watch the delivery being
made on the camera; Mr. Allen said their security does a sweep of the area before the delivery
and has the ability to stop a delivery. Mr. Cleary asked if there is a fence behind this property;
Mr. Burke said there is fencing all along the train tracks.
Mr. Cerretani said they would have to work with the property owner about impacts on the
neighboring businesses; Mr. Allen said they plan to meet regularly with the business community
and have a staff member act as a contact person.
Mr. McClanahan asked if someone with a medical card can use this facility; Mr. Allen said they
could use their medical card to get discounted product at the store.
Planning Board 4 10/23/2019
Mr. McLaughlin showed the board the layout of the facility, including the vestibule with
reception desk. They plan to have 12 sales terminals and staff on the floor to assist customers.
Security will be inside the building, the exterior glass will be frosted per state code so people
cannot see inside, and the building exterior will have no advertising other than the reLeaf logo.
After they get through security, customers will be met by staff inside.
Mr. LeBlanc asked about people trying to enter at the same time as another customer; Mr.
McLaughlin said there will be security between the inside and outside doors, as well as panic
alarms. The vestibule can fit 35 people, but only 15-20 people can fit in the retail space. On
days they expect higher volume, they plan to require appointments. Mr. LeBlanc asked how
people are checked before they get inside; Mr. McLaughlin said the receptionist and id scanner
are in the vestibule to check ids before people are allowed inside. Mr. Cerretani asked if people
are buzzed out at the exit; Mr. Allen said there is a door into an exit vestibule, and a second exit
door to outside. He said the double exit doors are to prevent people from entering that way. He
said people trying to get that way in while others were leaving would not be able to access the
building because the door will have a "crash bar" that only opens from the inside.
Mr. Allen said the back area contains the vault for product and cash, office space and bathrooms.
Mr. Allen said there will be product on display in locked cabinets behind the cash registers,
which will be removed upon asale. There will be no product displayed on the retail floor.
Parking and Traffic
Steve Clark, Nitsch Engineering, explained the parking plan, based on the ITE manual. He said
the land use code for a retail marijuana store of this size would require 23 parking spaces. There
are 201 existing parking spaces in the plaza. He said they do not want to have staff take up those
spaces, so they plan to have staff park off site. Mr. Cleary asked if the number of parking spaces
required in the original special permit will be sufficient. Mr. Burke said he thinks it will be
because this is still a retail use.
Mr. Clark said they looked at four intersections around the plaza: School Street/Route 140;
School Street/Mansfield Crossing north (main, signalized) entrance; School Street/321 School
Street driveway; and School Street/Mansfield Crossing south (secondary, unsignalized) entrance.
They did traffic counts in April, looked at turning movements and existing traffic volumes, and
adjusted seasonally. They inflated the counts by 1 % per year for seven years and added in trips
from the proposed site using the ITE manual. Mr. Clark noted they are not adding a new store,
but are replacing a store that was already there. He said the proposed weekday trip estimate for
the marijuana store is slightly higher than the frozen yogurt store, at about 59 more trips. Mr.
Clark said the Levels of Service for the four intersections remain the same with the proposed use,
so new traffic signals are not warranted.
Mr. Cerretani asked about taking a left out of the parking lot onto School Street; Mr. Clark said
he understands that is a difficult turning movement, but said none of the intersections meet the
warrants for a new signal. He said the warrant for crashes is 5 or more crashes in any 12 month
period; one of those four intersections met the warrant in its first year with seven accidents, with
four or five a year since then. He said with the existing signalized intersection at Mansfield
Planning Board 5 10/23/2019
Crossing, adding another one could actually increase congestion and delay rather than help. Mr.
Penney said the board had been concerned about the intersection with the original plaza; Mr.
Burke said the updated traffic report from the original developer came to the same conclusion.
Mr. Penney asked how long a customer would stay in the store; Mr. McLaughlin said between
eight and ten minutes, but some customers pre -order through the website and some customers
could be done in five minutes. He said the online customers will have to go through the same
security process when they arrive.
Ms. Friedman said the traffic study indicates traffic at the unsignalized site driveway intersection
is a bit higher than the state average and this facility will generate more traffic than the ice cream
store. She asked why the intersection wouldn't be signalized to avoid crashes. Mr. Clark said
adding another light so close to the existing light may increase congestion. Ms. Friedman asked
if the traffic signals could be synchronized; Mr. Clark said that would not help the congestion,
and adding another red light could back traffic up further. Mr. Cleary said a new light could be
an "as -needed" light when someone is trying to turn left out of the site. Mr. Clark said that
might work during off-peak, but during peak hours, two lights could back traffic up more.
Mr. Burke said he shares the concerns about causing additional traffic backups and suggested
one of the things the town could consider is lowering the speed limit from 40 mph to 30 mph.
Mr. McLaughlin said they are considering donating a speed trailer with a digital display to the
Police Department, which could be moved around. Mr. Allen said those boards can also collect
traffic data and could have a message board.
Mr. Cerretani said during peak hours, there will be parking issues and asked about the off -site
parking proposal. Mr. McLaughlin said on key traffic days, they are thinking it would be best to
use an appointment system rather than having customers park off site. They will have a parking
lot security plan with parking lot attendants. There will always be someone at the front of the
building, and on event days, they will have three staff outside to direct traffic into the parking lot
to avoid backups on School Street. Mr. McClanahan asked if the traffic plan would impact the
customers of neighboring businesses; Mr. McLaughlin said attendants can direct traffic around
the building. He said their busiest times are between 7pm-1 Opm. He said they are working with
the plaza owner to identify parking spaces for this business. Mr. Cerretani asked if the plaza
owner owns both of the buildings and the parking lot; Mr. McLaughlin said he does. Mr. Burke
suggested adding signage directing people to reLeaf parking spaces.
Mr. Penney said he thinks one of the town's biggest concerns is about this business during
Xfinity events. Mr. McLaughlin said they would have appointment only on those days. Mr.
Valanzola suggested the Police Chief be able to review that issue. Mr. LeBlanc asked how
people would know it is an appointment only day; Mr. Valanzola said the website and app would
update that information. Mr. McLaughlin said they would check whether people coming into the
parking lot have appointments, and if they do not, staff can advise them when to return.
Ms. Friedman asked about the busiest times. Jason Sidman, CEO of retail at the Gardner store,
said his busiest day is Saturday and the busiest weekday time is in the evening. Mr. Penney
asked if there are regular customers for this type of store, then extra customers on event days.
Planning Board 6 10/23/2019
Mr. Sidman said they started with appointment only, but within a week they did not need that
system. He said they do about 55 online orders a day. He said he thinks it would be best to work
with the Police Department so any special permit conditions regarding appointment only days
can be reviewed over time, especially as more dispensaries open. Mr. Burke said there could be
a condition similar to one in the Mansfield Crossing special permit about extended hours on
Black Friday, which gives the Police Chief the authority to make the decision. Mr. Sidman said
there are some customers who do not want to make appointments because they do not want to be
in the database. He said he thinks the best thing to do is to work with the community and the
Police Department.
Mr. Cerretani asked if Mr. Sidman scans identification; Mr. Sidman said they use the same
system Mr. McLaughlin plans to use. He said the door into the dispensary has security, which
uses the system to scan the ids, then allows people into the door.
Mr. Valanzola suggested a special permit condition for days of Xfinity events may include the
fact that some events are aimed at younger people and would not impact this business, so those
days may not need to be appointment only. He suggested leaving it up to the Police Chief. Mr.
Allen said he has spoken with the Chief about this issue, who said he supports the appointment
only system, but is concerned about the logistics of off -site parking.
Department Head Comments
The clerk read memos from Conservation, MMED and Water.
Lt. Roy Bain, Mansfield Police Department, said his department has had a number of
conversations with the applicant, who has already addressed a lot of the issues they had. He said
they have discussed the practicality of shuttling customers; he said he thinks it will be easier to
manage traffic on the site and to use appointment only days. He said the Police Department is
seeking assurances that plans are in place to deal with pedestrians and vehicle traffic on opening
day and week. He said the facility cannot have any impact on the public way, so they may need
police officers there. Lt. Bain said the Police Department will require that anytime the store is
open, a representative of reLeaf at the store has to have the authority to act on behalf of the
company. He said reLeaf has proposed continued communication with the Police Department,
including weekly meetings, a Memorandum of Understanding to cover the department's
concerns and the need to stay flexible as the situation changes.
Lt. Bain said an example of the "perfect storm" of traffic will be shows at Gillette, at Xfinity and
Cape -bound traffic on Route 495, which could result in no officers being available for details at
this site. He said Xfinity has around 40 shows a summer and the lineup changes from year to
year, so an annual review is a reasonable idea. He said the town does not know if or when the
traffic at this business will taper off and said the Police Department has ways to alleviate the
concerns, but unexpected things will come up and he thinks the business and the department can
work through them with clear communication.
Lt. Bain said he thinks speed trailers with message boards would help with traffic inbound on
School Street. He suggested finding out what will happen at the site before planning for a traffic
Planning Board 7 10/23/2019
signal. Mr. LeBlanc asked if the message board can indicate "appointment only" days at reLeaf;
Lt. Bain said it could be programmed with any message.
Ms. Ashman -Collins asked if there are other high traffic days analogous to concert events. Lt.
Bain said Black Friday is a high traffic day; Mr. McClanahan asked if there is a detail at the LL
Bean driveway then. Lt. Bain said there is a detail there as needed.
Mr. Cleary asked if the Police Department has to have a warrant if they have an issue in the
schools with marijuana from this store; Mr. McLaughlin said they would not need a warrant.
Mr. Sidman said the bar code on the packaging is not specific to a person; Mr. Allen said they
would be able to investigate and identify the customer.
Mr. Cleary asked what happens if the store's server goes down, the internet is lost or the power
goes out. Mr. Sidman said they would have redundancies, battery backup, two on -site servers
and could use generator backup.
Mr. LeBlanc asked if the information about parking lot incidents or banned customers will be
shared with the Police Department; Mr. Allen said it would be. Mr. Cleary asked if that will be
tracked and if the board could be informed of the number of incidents; Lt. Bain said it could be.
The clerk read a memo from Mr. Burke. Mr. McLaughlin said the store will have between five
and 20 staff members. Mr. Burke said the applicant should provide a tabular summary of
conformance to the parking requirements. He said he had originally suggested a new traffic
signal, but now thinks at afternoon peak, another light could cause additional traffic backups. He
said he would rather lower the travel speed on the roadway. He said taking a left out of the site
will still be a difficult turning movement, but said a lower speed limit will help.
Ms. Friedman asked about the Women at the Well Foundation mentioned in the application
materials. Mr. McLaughlin said that is a Taunton organization that helps women who have
suffered domestic or drug abuse with job assistance. reLeaf will report annually to the state on its
involvement with that group. He said they have talked to the Select Board about how to disperse
the planned $70,000 annual donation to the town. Mr. LeBlanc asked if the recipients of those
donations would be anonymous. Mr. McLaughlin said the educational program he plans to
provide to the schools is for the faculty, not the students.
Mr. LeBlanc asked about staff training. Mr. McLaughlin explained that through their partnership
with Sanctuary, staff will go through a training process on the products and diversion methods.
Mr. LeBlanc asked if that is a certified program; Mr. Allen said the state hasn't quite
implemented its vendor training. He said he also conducts staff training for workplace violence
prevention and emergency preparedness training.
Mr. LeBlanc asked how the volunteer hours are tracked; Mr. McLaughlin said he plans to donate
100 volunteer hours annually, and he will come up with a metric to track the hours. He said with
the number of employees they will have, he hopes to donate more than 100 hours a year.
Planning Board 8 10/23/2019
Public Comment
Peter Wiggins, Honorary Mayor of Norton, said the TPC in Norton will host a large event next
summer, which will generate a lot of traffic. He said traffic on School Street is fast and he thinks
a signal is needed.
Scott Feely, 49 Fruit Street, said he was encouraged by the presentation and thinks giving the
Police Chief the ability to change the traffic and appointment situation plan as the changes is a
good idea. However, he said this location is unique and it is important to remain flexible.
Angelina Kerry, Williams Street, said traffic from coming West Mansfield is unbearable and this
will create a nightmare for drivers. She said there are too many cars going too fast, the
development is too congested and she thinks this is the worst location for this business.
Board Comment
Mr. Penney asked if anyone on the team has experience selling recreational marijuana; Mr.
McLaughlin said Sanctuary has significant experience, and he will be working at the facility.
Mr. Penney asked if Mansfield's residents should fear this business coming to town. Mr.
McLaughlin said he thinks his business will offer a positive financial impact, good j obs, will
draw people to town from other communities and will provide revenue to Mansfield.
Mr. Cleary asked about the host agreement versus the special permit. Mr. McLaughlin said the
financial terms are in the host agreement, which is good for five years. Mr. Burke said the
recreational marijuana special permit would be good for five years and is renewable.
Mr. Cleary asked about requiring the applicant to notify the town of a change in management.
Lt. Bain said the MOU includes emergency contacts and requires they be updated. He said the
Police Department will be meeting weekly with reLeaf management.
Mr. Cleary asked about employee salaries; Mr. McLaughlin said tellers will be paid $13-16/hour
and managers $50-70,000 annually. He said they are required to hire from areas of
disproportionate impact, which Mansfield is, so it will benefit reLeaf to prioritize hiring
Mansfield residents.
Mr. McLaughlin said because their products come prepackaged, there will be no product in the
trash or dumpster. He said they have to take inventories at the beginning and end of the day and
make sure they balance with sales. Mr. Allen said there will never be any product disposed of at
the site and anything that is returned or has to be disposed of will go back to the cultivation site.
Mr. Cleary asked if they will need a food permit from the Board of Health for the edible
products. Mr. Sidman said their edibles are not considered food, so do not need food permits.
Mr. McLaughlin said they will have a full fire suppression system.
Mr. Cleary asked about the challenges at this location. Mr. Allen said challenges include traffic,
the unique driveway intersection and special events in the summer stretching public safety
resources. He said he believes they have a good plan to address and mitigate those concerns. He
Planning Board 9 10/23/2019
said unexpected things will come up, but they plan to have good communication with the Police
Department so they will be able to address them quickly.
Mr. Burke said the original parking for the plaza was calculated at one space per 200 square feet,
so the parking should conform. However, he said he would like to see a parking table showing
conformance to zoning.
Tom Pozerski, Merrill Engineers, said the whole parcel is 2.91 acres. He said they analyzed the
site based on the present use and think they have to prove they have adequate parking for their
location. He said they have more than adequate parking and comply with the requirements for
parcel size, FAR, open space, dimensional, parking and loading and ADA accessibility. Mr.
Cleary said the original special permit was granted for both buildings on this site and asked to
see the same kind of calculation for the entire site. Mr. Valanzola said this special permit would
not amend the original special permit.
Lt. Bain said the town has pole -mounted speed signs that can be moved around and suggested
both a trailer with a speed/message board and a stationary speed measuring sign on the School
Street approach from West Mansfield would be good ideas. Mr. Allen said the trailer unit can
also collect traffic data.
Ms. Friedman asked about speed tables; Lt. Bain said traffic volume on School Street is very
high and there are other, safer ways to slow traffic. He said speed tables would also be an issue
for DPW with plowing.
Mr. Feely said CIP purchased a trailer a few years ago, and the applicant's offer to buy one for
the town would be a significant donation. Lt. Bain said that sign could do a lot of good for the
community at this location or somewhere else in town, and if the Police Department finds there
are no traffic issues in a few months, it should be movable.
Mr. Valanzola said the "appointment only" should be for the first year for Xfrnity events or
extraordinary traffic events and should be at the discretion of the Police Chief. Lt. Bain said
events might not only be "concert," so the special permit should not only refer to concerts.
[Mr. Penney left at 10:20 p.m.]
Motion: To direct Mr. Burke to draft a positive special permit decision with the conditions
discussed (Ashman -Collins -McClanahan)
Mr. LeBlanc asked if this meets all the special permit requirements; Mr. Burke said it does.
All in favor. PASSES
Motion: To continue the public hearing to November 13, 2019 at 7:00 p.m.
(LeBlanc -McClanahan) All in favor. PASSES
Planning Board 10 10/23/2019
Motion: To adjourn at 10:30p.m.
Next Planning Board Meeting: October 30, 2019 at 6:30 p.m. / Master Plan Meeting 7:00 p.m.
Special Town Meeting: November 5, 2019, 7:00 p.m. —Mansfield High School Auditorium
, 3, , a1 � - I-S -),Dl q
Signature of Clerk Date of Approval
Planning Board 11 10/23/2019