HomeMy WebLinkAboutHighland Ave. #22 - 10/2/1991(In
0�aqu
i� ETA ��inr.I;lzlfr;e�Il#h of �a tts��Ie1IIIwe#i�
DEPARTMENT OF LABOR AND INDUSTRIES
DIVISION OF -INDUSTRIAL SAFETY
1110TIFICATICN OF ASBESTOS WOpr
accordance with the provisions of M.C.L. C. 149, §6-6F and 453 C1?R 6.12)
A11 sections e this. form
the must be completed 'in order to comply wit: notification requirements of 453 CN.R 6.12
TEN DAY PRIOR NOTIFICATICN IS REQUIRED OF A1JY'ABATEMENT PRQ7ECT
GREATER THAN THREE (3) LINEAR OR SQUARE FEET
DLI FILE NUMBER
Contractor perfornirg project 1 g QU /iL I T 14 66P6RT4 License ,r
Do prevailing rates of wages apply to this project as required
under M.G.L r_. 149, §26, 27 or 27F? (circle or .. YES 7iC
Address of project
Building ,Yana (if any)
A 64eITE �/,SIaE
Street Address ,. I )../�
> /1
/"�p� /z G l/l s)'�J�� V C
Ci ty ✓ 5 C
5og 58g 5yya
Project type (circle one):
DEMOLITION ` R:'NOVATIONI p.EPAIR OTHER
' If •Other• selected,.please explain
Asbestos Activity: (circle one): EACAPSLZATIO.V
ASSOCIAT3D PROJECT
ENCLOSURE' REN.OV
Indicate amount of: asbestos surface on pipes or ducts
. OR LINEAR FEET
on
Pipes or ducts to be removed, enclosed orsbestos encapsulatedCe� ttuctures other than
Start (fate Z5 UP.RE FEET
an, J _ pm weekends?
Completion Date
Project Supervisor Name S.
n.�r^^ � Certificate p���
Asbestosb Analytical LaName �
lNA) eL Certificate y !n1
Namea 6 Address
of disposal site(s) fill k DEG/L
Xs asbestos contr.ic: written or•verbal2
C7ontsactcr's Workers' Conpcnsetlon lhsurer
Policy Number_
?agility owner
Address
City--
state
n Zip
Cescripc_'on, ..eof work practices to be followed: /{Q 12
Description of decentam�iration system(s) to be used
CC0\( CPI AA9)f(I
Description of hendlino/disposal Methods to comply with 453 CM4 6.I4(2) (q)
'a -me and address of transporters) if other than the asbestos contractor:
is undersigned hereby staCesI under the penalties of perjury, that he/she has
.ad and understood the Commonwealth of Massachusetts Regulations for the
moval, Containment or Encapsulation of Asbestos, 953.C;!H G:00, and that the
formation contained in this notification is true and correct to the best of
sjher knowledge and belief.
to (i, 16 ,�l
ose return
Ja/2
Signed: lli.S��� - � / jw
Title: /� � S.LE2 v
Company: 2 Q(I 4 L/ T 4 j o -- r.r- rr—
�✓ Q�/vT iuoa � A v r
this form to: So3v •7
Asbestos Control Technical Services 3 G�
D-Part�nent of Labor anal Industries"
Division of Industrial safety
100 Cambridge street, Room 1101
Poston, RA 02202
Massachusetts Departmenl of Environmental Protection
Bureau of Waste Prevention —Air Quality
BWP AQ 04 Asbestos Removal Notification
' BWP AQ 06 Notification Prior to Construction or Demolition
Permits for Asbestos
7. Describe the demolition/renovation procedures to be
used:
(Note: Demolition/Renovation Operations must comply
with 310 CMR 7.09 to control emissions to prevent a
condition of air pollution.)
Transmittari
Facility 10 (it kno
8. Emergency Demolilton/Renovation Asbestos Removal
Operations
State, or local official who evaluated the.emergency:.
AWW
TIN
Aura"
Qak WAVIhatitalien
(General Statement: It asbestos -containing material is unexpectedly found or damaged during a Demolilion/Renovalion
operation, all responsible parties must comply with 310 CMR 7.00, 7.09, 7.15 and Chap(er 21 E of the General Laws of the
Commonwealth. This would include but would not be limited to filing an asbestos removal notification with the Department
and/or a notice of a roleaselthreal of release of a hazardous substance to the Department 0 applicable.)
C81 twcatiol7
certify that I have examined the above and that to the
best of my knowledge it is true and complete. The
signature below subiects the sinner to the general statutes
regarding a false and misleading statemenl(s).
Cattlj ; 'rpl/�K.......l.�.o.»r.,Psa,�l....... C %I n ts�o �t�1��2�
T
PAnlN�me ••�
AutluvlreOSlpnNun .............. .. .. ............
............................................... .....n
PauhNrine IL.TS
Lute..........................�..:.. /..�.......�.(.....................................
r.
Rev, 1/91
Pa,
Afassochusefts Department of Environmental Protection
Bureau of Waste Prevention - Air ODality
BWP.AQ 04 Asbestos Removal Notification
r BWP AQ 06 Notification Prior to Construction or Demolition
Permits for Asbestos
11. Transporter of asbestos -containing waste material frolry.
.removalAemporary storage site to final disposal site
11ame
3 i UAIrvvaa n /<yE .
scrunaeass
Cly/Taan
relepAone
12. Refuse transfer station facility and owner (if applicable)
(Note.. Transfer Stations must comply with tho Solid
Waste Division regulations 310 CMR 18.00.)
13. Final Disposal Site
_4..... ........... ............
....qO..%�LPGIf/Erf..R...li/EGP.;.........
Adeless
Cly?awn . .•• ..
.......................
Wow
WnrrNmf .. �'
(Note. Disposal of ACM must comply vYilh'lf'Wsolid Wast
Divisions regulations 310 CMR 19.00,)•
14. Emergency Asbastoi Rem oval0pdrAtlans:.
DEP official who evaluated the emergency
General Dom olilion/Renovalion Description
1. Demolition/Renovation Contractor
Naar
- __.._...__.....----------- - - .._.....
Addecss
Clry/iown ---------
ieleOAone
2. On -Site Supervisor
.................................................
Narte
3. Identify the specific Worksile Localion(s)
4. Was the facility surveyed for the presence of asbestos
containing material (ACM)?
❑ Yes ❑ No
If yes, who Conducted the Survey?
.:................... ...............................................................................
.
Drjw&nenl al LaLne and Industries Cedlliallon /
5. If yes, who conducted the survey?
......................................................................................................
LkNebrirnla/LaMl asdlndutlers Ced!lioA'an/
6. Demolition/Renovation Asbestos Removal
fall Dare
Rev. MI
Pa;
massactiusetts Department of Environmental Nrolectlon
Bureau of Waste Prevention — Air Quality ................... - -
7ra&milCal
BWP AQ 04 Asbestos Removal Notification ---
' BWP AQ 06 Notification Prior to Construction or Demolition i..............................
Permits for Asbestos FacilityID (i! know-
2. On -Site Supervisor / 7. Description of techniques used for estimation
Nam
T(�Q /�501 TA P�E ._..
Ikpv6nenldLaGnr and lnduslnes Cedlliatlan '—'
3. Hygienist
.....F!_A ...�.L.E 4 A J.�.E._...�i �_A. �_S.'.. 5.......
Na re
4. Specific Workshe Locations(s) (i.e. Building name,
number, wing, floor, room, tunnel.)
5. is the job being conducted indoors or outdoors?
i N7op.rL.`
6. Estimated amount of Each type of ACM to be handled
boiler, breeching, duct,
tank surface coatings
thermal, solid core pipe insulation
corrugated or layered
paper pipe insulation
insulating cement
spray -on fireproofing
trowel/sprayer coatings
cloths, woven fabric
transhe board, wall board
other — please describe
Total in Linear Feet
Total In Square Feet
Linear / Square Feet
8. Asbestos Removal .
............... al ....................................... ...............
SbWale
....................... M.. _ ...'_ _..::.............:.:
EndDale ..........................................
urs of Operation W E
daytime ❑ evening O night
�ys of Operation
Mon. —Fri. C3 Sat. —Sun.
(Note: Any changes in these dates must be reported to the
appropriate regional office. If a removal is postponed for
more than thirty (30) calendar days separate notification wili
be required.)
9. Describe the asbestos removal procedures to be used.
...........�...:.1.5 ❑ glove bag ❑ enclosure JV full containment
❑ cleanup ❑ encapsulation ❑ disposal only
/ 0 other -please describe
...... / 10. Transporter of asbestos -containing waste material from site
to temporary storage site (if necessary) to final disposal siie
Rev. 1/gi
Page 2 of
2rn`i ;
`� OEPr•
'ewOfPV" t1r^-_
NMI
Recervsd Wh-,,,, m
NMI OAppt. oDWed
Dalebn Date,,,,,,
• ICassachusens vellartment of Environmental Protectloll
Bureau of Waste Proven[ion —Air Oualiry
L ,7!. �'
BWP AQ 04 Asbestos Removal Notification
BWP AQ 06 Notification Prior
Transmittals
to Construction or Demolition
Permits for Asbestos
facility to 01 know
' Applicability
Demolition/Renovation operations involving asbestos-
containing material (ACM) and general DemolhiorL/Renovation
renovation operations and demolition/renovation operations
involving ACM is required under310 CMR 7.09 (2) and 3.10.
operations are regulated by the Department of Environmental
Protection (DEP), Bureau of Waste Prevention—Alr Quality
CMR 7.15 (i) (b) twenty (20) days prior to any worktieing:
performed. The following information is required' ' " ' ' to
Division, under Regulations 31'0 CMR 7.00, 7.09 and 715..
310 CMR 7.15:
Notification to the REGIONAL OFFICE of general demolition/
General Project Description
1. Facility
nIA.:.1_6.R.:.1..
_,.
..................
_.,........... r N �I n� r
3. On -Site Manager ..
.. ..
Address.......... ........................
' A.4
ClygDwn
...a�.7....._........ u................_.._
_
................: SQ .....5 ....... yo
Telephone .............................:.
Size
d 0 0
.. Numberallkaa•._...........».__......_._..........
Was the Facility built prior to 19807 ®" Yes ❑ No
i ESI �C_NCe
_......_._ ��._ ..............._.._._......._�.
........
CumnfaPdorutt olfxlgry //.........__......_............
Is the Facility Occupied? . 0" Yes ❑ No
Is this Facility Owner -Occupied Re ' endai with 4 units or less?
P/Yes ❑ No
2. Facility
O0wn]erq�
.......1.�..`:!...�.`:._6........
Narar!.......!...,/...... .E..................
Address
Clyoo"
Telephone
LIA Asbestos Removal Description
1. Asbestos Contractor
Nf�.l....v r7y.ETs.....................
.. eF.—•. � WO6� � Vz
Addnss...............................................................
Rev.1/91
Address
Clynoa_---....... ... ....._.._...w._..____..................
_.... .......
..._...,....__...._......__...._...._ ._.. .r _ _.—.._._....
Telephone ....
4. General Contractor
Clly/rown
Telephone
Does this project involve the removal and/or alteration of
any Asbestos Containing Material (ACM) as defined and
applied In 310 CMR 7.00 and 7.1577
Kes O No
If Yes, complete Sections C and D.
If No, complete Sections D and E.
oyrrewn—�
Telephone --_.
�Coa6 i6�(/
LkDrrerunl olLaoorarW lnduslder Lrarae/ —`
Page 1 of e