1. Meeting called to order at 7:10 pm
2. Request for Certificate of Compliance: Town of Mansfield, Willow Street Reconstruction.!`-bk iFELD
0934
?iASSACHUSETTS
Ms. Gonyer said the Notice of Intent was filed for the reconstruction of a portion of Willow Street under
DEP SE 211-0934. She said everything has been restored and has rebounded well and the side slopes are
holding.
Richard Alves, Town Engineering Division, explained, as part of the Willowdale residential subdivison, the
Applicant was to improve the radius and sight distance in this location. He said when the redesign of
School and Spring Streets is finished, the town will connect Willow Street with the new sight line, grading
and sidewalks. He said a plan was submitted by Bay Colony Group and everything is according to the
town's regulations.
Mr. Roth made the motion to issue a full Certificate of Compliance to the Town of Mansfield, Willow Street
Reconstruction, DEP SE 211-0934. Mr. Rieth seconded the motion.
Motion passed 5-0-0.
Hearing ended at 7:14 pm.
3. Request for Determination of Applicability: Town of Mansfield, 499 East Street, Map 33, Parcel 11.
The Request for Determination of Applicability was filed for the approval of the wetland line as shown on
the plan and the clearing of trees up to 50 -foot buffer of wetlands.
Richard Alves, Town of Mansfield Engineering Division, said he previously submitted a site plan showing
tree clearing within 50 feet of the Bordering Vegetated Wetland. He said the the wetland line was
delineated by Ms. Gonyer and field located by SMC. He said at the last meeting the Commission asked for
more information on what was being proposed and he has submitted a sketch showing the proposed
building and potential site grading. He said at this stage they are looking to clear trees between the 100 -
and 50 -foot line, which amounts to approximately 40,000 square feet of disturbance. He said if approved
they would clear the trees in conjunction with the Notice of Intent, which he will present tonight.
Mr. Roth said this project was presented for review by the Canoe River Aquifer Advisory Committee
(CRAAC); he said there were no Issues and the Advisory Committee voted unamimously to accept the
project.
Mr. Healey said he does not have any concerns with the proposed clearing because it is necessary for the
project, but said one thing that needs to be addressed is the Issue of lead contamination in the ground
water from the firing range. He mentioned there are EPA guidance documents regarding firing ranges,
which can be a resource for the designer of the project, as well as the Commission. Mr. Alves said the RDA
was filed for the clearing of the trees only.
There were no public comments.
Mr. Roth made the motion to issue a Negative Determination for reason number 3, work will not alter
resouce area, to the Town of Mansfield, 499 East Street, Map 33, Parcel 11, to approve the wetland line as
shown on the plan and the clearing of trees up to the 50 -foot buffer of wetlands, In accordance with the
plan "Sketch Plan of Regional Police Training Facility Project in Mansfield, Massachusetts" dated November
29, 2018, prepared by the Town of Mansfield Department of Public Works, with the special condition that
the Agent is to inspect the erosion control prior to the start of work. Mr. Gallagher seconded the motion
Motion passed 5-0-0.
Hearing ended at 7:21 pm.
4. Notice of Intent: Town of Mansfield, East Street within the Town Right -of -Way, Map 33, Lot 11. DEP SE
211-0981
Mr. Alves explained the Department of Public Works (DPW) is proposing vehicle and safety Improvements
at the intersection of Pratt and East Street, to include roadway reconstruction, drainage, utility and auxllary
work; he said all work is subject to the Conservation Commission jurisdiction and the Wetland Protection
Act. He said the limit of work is shown on the plan and the proposed project is to be funded by a road bond
under Chapter 90 and constructed by the Town of Mansfield DPW, Mr. Alves said a drainage study was
performed and the potential impacts of the proposed project were assessed, as portions of the activities
are located within 100 feet of Bordering Vegetated Wetland.
Mr. Alves said with the new Police and Fire Station at 500 East Street, the town is looking to realign the
existing Intersection and relocate the entrance to the Mansfield Green away from the intersection. He said
the increase in impervous area is approximately 20,000 square feet, silt sock is proposed and no adverse
impact to the wetlands will occur. He noted this is a continuation of the Safe Route to School on Route 106.
Mr. Alves said a new entrance to the Mansfield Green will be provided further south from the intersection,
with an entrance for the Mansfield Green and one for the firing range; both these entrances will be
separated by gates.
Ms. Gonyer reminded the Commission that some exemptions are maintenance, repair, replacement of
utility services, structures, and drainage facilities. She said within the 25 -foot zone there is also a very
specific exemption of any drainage outfalls and associated grading.
Mr. Healey said this will be an Improvement of the existing drainage system, not just for traffic issues.
Mr. Alves said most of the work can be done now, weather premitting, without interferring with the
existing intersection and traffic.
James Borrebach, 395 East Street, said his driveway is 220 feet from the proposed entrance. He said he
met with Mr. Alves several times, looked at the plans and expressed his concerns; he said Mr. Alves
addressed all his concerns. He said he supports the project because the intersection is a real safety issue,
primarily with the entrance to the Mansfield Green, and, even though the entrance will be closer to his
house, he believes it is a good project and asked the Commission to approve and issue an Order of
Conditions for this project.
Ms. Simms made the motion to Issue an Order of Conditions to the Town of Mansfield, East Street within
the Right of Way, Map 33, Lot 11, for vehicular and safety improvements at the Intersection of Pratt and
East Streets, to include roadway reconstruction, drainage and utility and other ancillary work, under DEP SE
211-0981, in accordance with the plan "Roadway Improvement Project East Street" dated November 20,
2018, prepared by the Town of Mansfield Department of Public Works", with the following Special
Conditions underthe Mansfield Wetland Protection By -Law Chapter 220:
1. No work can be started until the Order of Conditions has been recorded with the Bristol County
Registry of Deeds and the receipt of the Order is returned to the Commission filled in by the
Registry;
2, All work must conform to the plans, "Roadway Improvement Project East Street" dated November
20, 2018, prepared by the Town of Mansfield Department of Public Works", referenced as "the plan
of record" in this Order;
3. All limits of work and erosion controls shall be installed prior to any construction, clearing, or
excavation. The erosion controls shall consist of a 8" diameter biodegradable mulch -filled silt sock
with wooden stakes every 10 feet on each sides of sock or equivalent (do not pierce silt sock with
stakes), in addition to the silt sock, trenched -in silt fence may be required depending on the specific
site conditions. See the Conservation Agent (Agent) for specific erosion control design standards.
The Applicant shall notify the Agent when any such devices or measures are installed so that a site
visit can be conducted prior to the commencement of work;
4. The Commission reserves the right to require additional mitigation or erosion control devices or
measures if mitigation or erosion control devices are not adequately installed or maintained on
site;
S. The Applicant shall ensure that all demarcation (i.e. limits of work) and erosion control devices will
remain In place and be maintained throughout the construction process and until all disturbed
areas are stabilized. Stabilization shall be achieved once a complete vegetative cover is reached.
Seeded areas shall be covered with a suitable protective cover to allow the seed to germinated and
become established. All side slopes greater than 3:1 (but less than 2:1) are to be covered with jute
mesh and seeded. At no point shall erosion occur resulting in sediment entering the wetland areas.
If erosion occurs, the Agent is to be contacted to review the extent of the erosion and determine
follow-up actions;
6. All roof runoff is to be directed in drywells or equivalent drainage components approved by the
Commission. The Commission or its agent shall review the locations of the drywells;
7. A construction sequence is to be submitted to the Commission prior to the start of work;
8. The Conservation Commission or its agent Is to be notified of the starting date of the work prior to
its commencement;
9. Prior to the commencement of work, a pre -construction meet shall be held with the Agent, the
Engineer and/or Representative, and the General Contractor to review the Order of Conditions,
scope of work and construction sequencing;
10. The Applicant shall be responsible to ensure that all contractors on site during the construction
have received and reviewed the Order of Conditions and all plans of record;
11. Wetland flagging must remain In place until the project has been completed and the Certificate of
Compliance Issued;
12. The Certificate of Compliance shall be requested in writing upon completion of the project. At the
same time, the applicant or any successor shall, upon completion of the project; submit an as -built
plan and letter signed by a professional engineer, certifying that the work has been done in
accordance with the approved plan;
13. Any modifications or revisions to the plan(s) referenced In this Order must be submitted to the
Commission for review. For single family lots, this Order is for the structures shown on the plan of
record only. Any additional structures including, but not limited to, decks, patios, sheds, pools,
walkways and/or any hardscape features must be reviewed by the Commission. If, after their
review, the Commission finds that the changes are not significant enough (minor modifications) to
warrant an Amended Order or new Notice of Intent, then the revised plans shall be considered the
new plan of record. If the changes are significant enough to warrant an Amended Order or new
Notice of Intent, then the applicant is required to file accordingly;
14. No synthetic fertilizer, herbicides, pesticides or fungicides can be used; only organic products may
be used;
15. All the terms and conditions set forth in the Stormwater Management Plan for (project title)
prepared by (Engineer), submitted on (date) are to be included with this Order of Conditions. All
on-going 0&M plan activities are to be recorded as noted. All reports and checklist are to be
submitted to the Commission as noted.
Mr. Roth seconded the motion.
Motion passed 5-0-0.
Hearing ended at 7:34 pm.
• Agent is to inspect the erosion control prior to the start of work;
• The contractor is to stablize any disturbed areas immediately after closing the trench;
• All roof runoff generated by the additional roof shall be directed to drywells or stone trenches;
• The Commission has determined there is no need for additional sapling plantings.
Mr. Gallagher seconded the motion.
Motion passed 5-0-0.
Hearing ended at 8:07 pm.
7. Notice of Intent: Steve Ruzzo, 251 Branch Street, Map 34, Parcel 100.
The Notice of Intent was filed on behalf of the Applicant, Eco -Site, for the construction of a cell tower and
associated access road within 100 feet of Bordering Vegetated Wetland and a potential Vernal Pool.
Mr. Healey said the Applicant has requested the hearing be postponed until January to allow an internal
review by other town departments. He said the decision to postpone the project to the January meeting
was made today by email and asked if there is a time frame for requesting a continuation. Ms. Gonyer said
normally she would ask for at least two weeks notification if there is a postponement. Ms. Gonyer
recommended issuing the continuation.
There were no public comments.
Mr. Gallagher made the motion to continue the hearing for Steve Ruzzo, 251 Branch Street, Map 34, Parcel
100, for the construction of a cell tower and associated access road within 100 feet of Bordering Vegetated
Wetland and a potential Vernal Pool to January 14, 2019. Mr. Roth seconded the motion.
Motion passed 5-0-0.
Ms. Gonyer said the Order of Conditions under DEP SE 211-0948 for a previous filing submitted by Joseph
Lynch for the construction of on -grade solar panels with associated site Improvements at 271 Branch Street
needs to be closed out. She said she will contact Mr. Lynch.
Hearing ended at 8:14 pm.
8. Old Business:
• 1148 East Street,
Ms. Gonyer said the homeowner was unable to attend tonight's meeting. she said the disturbed areas at
this site have been left alone but she will meet with the homeowner to go over a wintering plan for these
areas. She said the homeowner will have to submit a planting plan in the spring. She said a split rail fence
is now being installed along the intermittent stream and the plantings will be put between the fence and
the Intermittent stream. She noted the Intermittent stream is flowing and there is no turbitity. She said
the branches stored on the back portion of the property will have to be removed; she said the homeowner
can access this portion of the property from the abutting property so the debris can be removed without
having to bring the branches over the intermittent stream again.
• 310 West Street:
Ms. Gonyer said nothing is happening at this site. She said the Order has been issued but she is waiting for
it to be recorded. She said the owners will have to submit an over -wintering plan. She noted everything
has grown back and the water level has receded. She said the electricity has been shut off because the
house is still open to the elements and the basement is filled with water. She will meet on site with the
wetland monitor in January.
• Audobon and Regulation Updates:
Ms. Gonyer said she will be working through the Mansfield Prepareness Grant and Ms. Simms has been
appointed as the citizen -at -large member. She said she has been working with Audobon; the Audobon
works with the Shaffer Community Program who offer services to help with regulations.
• MACC:
Ms. Gonyer said the Commission can go on the MACC web site for the updated commissioners hand book.
• Approval of November 19, 2018:
Mr. Rieth made the motion to accept the meeting minutes of November 19, 2018. Mr. Roth seconded the
motion. Motion passed 5-0-0.
Ms. Simms said she will replace Mr. Roth on the Open Space and Recreation Committee.
Mr. Roth made the motion to approve Ms. Simms to serve as the Conservation Commission representative
on the Open Space and Recreation Committee. Mr. Rieth seconded the motion.
Motion passed 5-0-0.
9. Adjournment:
Motion was made to adjourn at 8:42 pm (Rieth/Roth) Motion passed 5-0.