Loading...
HomeMy WebLinkAboutMinutes - 09/09/2013IMA Study Group Meeting Mansfield — Foxborough- Norton September 9, 2013 6:OOPM (At Mansfield Town Hall) Members: Mansfield: Lee Azinheira Foxborough: Richard Pacella Roger Hill Norton Diane McElligott Luke Grant Also in Attendance: Bill Ross, Mansfield Town Manager Jay Barrows, State Representative David Young, CDM Smith Fran Yanuskiewicz, WSE Mike Yunits, Norton Town Administrator Bob Bell, AECOM Bob Swanson, Foxborough Town Engineer Discussions: The following is a brief summary of discussions: 1. Approve Previous Meeting Minutes Minutes from: 6-24-13 Approved Unanimously (5-0) 2. Effluent Recharge Site and Site Permitting • Mansfield recently signed the CDM Smith contract for permitting and preliminary design of the former Reilly property site. Work will move forward even though MassDEP approval which has been requested since June 2013 has not been received in writing. Goal is to complete hydraulic testing before cold weather arrives. Survey work and geophysical work will also be conducted. 3. Status of new draft NPDES permit. • A copy of the comment latter prepared by Mansfield and CDM Smith on the proposed draft NPDES permit was distributed to Foxborough and Norton. Each of those towns is now listed as a co -permittees which requires them to prepare submittals annually going forward. • Fran Yanuskiewicz reviewed the comment letter to EPA and thought it was well done. He helped Norton submit draft a comment letter. Norton will forward copies of that letter to the other communities. 4. Community Updates • Norton • Diane McElligott indicated their negotiations with Wheaton College are very close to wrapping up which would allow the college to tie into the Norton sewer system. She expects the MOU to be approved at the October Wheaton Board meeting. • Foxborough • Richard Pacella indicated they are in process of developing a separate sewer district map in order to create rules and regulations specific to that area. • Mansfield • Lee Azinheira indicated they are waiting to schedule another meeting with Easton representatives but that Easton indicated they would like 75,000 gpd in Phase I and 90,000 gpd in Phase lI for a total of 165,000 gpd. 5. Discuss updated Draft Regional District Agreement (9-6-13) A. Comments on Working Draft • David Young indicated the recent Draft includes all changes discussed and agreed to on the 5-17-13 version. Also a section on dispute resolution has been incorporated as well as some other minor edits. • Remaining items to be added include 1. Land transfer figures; 2. Remaining examples to be appended; 3. Land transfer language (Foxborough attorney to draft and forward); 4. Language to transfer existing debt and to initially capitalize District; and 5. Final copies of attachments. • Once each community has conducted one last read through a working meeting with attorneys will be held with a smaller group to do a final pass. Rod Hoffman will coordinate this meeting once communities are ready. 6. Schedule to Finalize Agreement for Signatures • Goal is to have a final Agreement by end of year and then a public meeting will be held in each community to present the Agreement. 7. Other • Mansfield and CDM Smith are planning to meet with MEPA to discuss their next steps in that process. 8. Next Meeting • Next meeting to be scheduled after each community final reviews and meeting with attorneys has occurred. Adjourn 6:45 pm Minutes Approved 12-16-13