Loading...
HomeMy WebLinkAboutMinutes - 12/16/2013MINUTES IMA Study Group Meeting Mansfield - Foxborough- Norton December 16, 2013 6:OOPM (At Mansfield Town Hall)'_ Members: l (r Mansfield: Lee Azinheira j .5 Foxborough: Richard Pacella Roger Hill Norton Diane McElligott Luke Grant Also in Attendance: Bill Ross, Mansfield Town Manager Jay Barrows, State Representative David Young, CDM Smith Fran Yanuskiewicz, WSE Bernie Marshall, Norton W&S Superintendent Bob Swanson, Foxborough Town Engineer Discussions: The following is a brief summary of discussions: 1. Approve Previous Meeting Minutes Minutes from: 9-9-13 Approved Unanimously (5-0) 2. Effluent Recharge Site and Site Permitting CDM Smith conducted a field infiltration test after installing some wells at the former Reilly property. Test was conducted for about a two week period. Results still being analyzed but initially look very good. Survey work and geophysical work has also been completed. Surface water quality sampling and testing has also been done. David Young thanked Bernie Marshall for all his assistance during this work. Wetland flag lines are in process of being approved by the Norton Conservation Commission. 3. Community Updates • Norton • Diane McElligott indicated their negotiations with Wheaton College are very close to wrapping up which would allow the college to tie into the Norton sewer system in 2017. Draft MOUS are being reviewed by both parties. c-1 • Foxborough a. MINUTES Richard Pacella indicated a recent special town meeting approved a sewer district map for the town. This will allow them to create rules and regulations specific to that area. They are also updating their sewer rate model. He indicated discussions are ongoing with a potential developer for Foxfield Plaza. • Mansfield • Lee Azinheira they recently met with representatives from Easton to review where best for them to connect into the Mansfield sewer system. Easton is moving forward with their program and intends to purchase capacity via Mansfield in the treatment plant. • Lee will distribute to each community a copy of the Draft FYI wastewater budget for review and planning. • Lee recently met with the Mansfield Capital Improvement Committee to review the wastewater program and they fully support moving forward with the design of the treatment plant expansion and upgrades. • Mansfield representatives met with MEPA representatives on 9-13-13 to review the status of the project and discuss what needs to be done going forward since the Mansfield MEPA Certificate dates back to 2004. Result is Mansfield just needs to describe all the work that has been done in the interim and then address in an EIR the remaining comments raised in 2004. 4. Discuss updated Draft Regional District Agreement (9-6-13) A. Comments on Working Draft • David Young reviewed the most recent Draft Agreement dated 11-26-13 which also includes the Exhibits. • Bill Ross indicated a meeting between the finance people from each of the three towns had been arranged so they can determine how to fund the District on day one. Mansfield may need to interim finance the process. • Bill Ross also indicated that the three town managers recently met to discuss the District and all agreed the Agreement should be finalized quickly to move the District implementation forward. • Norton representatives indicated they still had some comments: o Section 18.9 — Concerned with the use of the word "Current' when referring to drinking water standards as they will likely change over time. All agreed to revise to "impact federal and state drinking water standards" as this will reflect those in place at a given time. Section 19.1 — Concerned that wording does not include payment of existing taxes in future on WWTP, Kok and Reilly land. Wording had been revised to specifically include that these taxes would be paid and the phrase "allowable statutory assessments currently paid on existing District facilities land" covered that item. Section 19.2 — Concerned that new wording moved payment of the first APN back to FY 16 and that they want it paid in FY 15. Bill Ross w MINUTES indicated that would be problematic as the FYI budget was being reviewed in Mansfield now and would look like Mansfield was paying Norton. David Young indicated that the FYI APN payment had been shown in the budget/ payment spreadsheets for some time now. Mansfield and Foxborough representatives were reluctant to revise but no resolution at this meeting. o Exhibit D — Verify math equation. o Distribute I/I memo to all indicating estimated I/I in District Interceptor. 5. Schedule to Finalize Agreement for Signatures • Legal reviews are ongoing. Hope to have that completed in January 6. Other • Mansfield Town Meeting will likely be May 6, 2014 7. Next Meeting • Next meeting tentatively scheduled for January 13, 2014. Adjourn 7:30 pm Minutes Approved 2-18-14