HomeMy WebLinkAboutMBC 08/02/2018Municipal Building Committee Meeting Minutes (DECEIVED
August 2, 2018{ iirERS OFFICE
Town Hall Meeting Room 3A/B 1{11 SEP _1 A IQ: 22
Present:
Chris Paquin, Chairman
Bob Barry, Vice -Chairman (Mr. Barry left the meeting at 8:19 pm
Maureen Doherty, Member
Evan Epstein, Member
e for items 7 and 9 only)
Doug Annino, Member (Phon
Mark Cook, Associate Member
Ron Sellon, Associate Member
Neal Boldrighini, Associate Member
Also Present:
Mike Ahern, OPM/Public Buildings
Greg Joynt, KBA
Joe Milani, KBA
Lee Azinheira, DPW DirectorMr
Kevin Dumas, Town Manager
Dumas left the meeting at 8:19 pm)
AS I E L D
Minutes Clerk:
Christopher P. Walsh
Mr. Paquin noted a quorum present and started the meeting at 7:30 Pm -
Mr. Paquin requested that items 7 and 9 are being taken out of order so that Mr. Annino can
Baker hone on these 2 items; the walkway modification and the hardw
at ar55
participate via sp p the speaker call on his phone. Mr. Annino got off the phone
protest. Mr. Ahern set up
pm.
1. Committee Meeting Minutes for Approval: 2018.06.25
The committee went over and accepted the minutes for June 25, 2018.
Motion: Approve June 25, 2018 MBC minutes (Paquin/Doherty). Vote is 6-0.
2. OPM Report highlights for DPW and Public Safety.
Mr. Ahern went over the following July
DPW: Punch list is ongoing; update from KBA and WSE as of July 18th has
been provided. Landscaping is scheduled for fall 2018, currently in the process of
bidding with bids due August 3, 2018,
1 I P a g einutes A u g u s t 2, 2 0 1 8
MBC Mee tin 0 M
Public Safety: Structural Steel is complete except Apparatus Bay. Structural masonry complete
in Buildings A and B. Alternate #3 Storage Building rough electrical has started. Under slab
utilities in Buildings A and B have started. Concrete slab placehe FTP s ment of 2nd
f loon andd, tD living
quarters. Schedule Update from BBBC has been uploaded
schedule shows the project behind a few weeks but BBBC expects to have the schedule come
back into compliance in the next couple months.
Mr. Ahern then went over the following schedule highlights for August.
n Phase I is being completed as we speak and Phase I site work will be
DPW: Paving topcoat o
onth or so. Deficiencies: Mezzanine floor sealant failure will be
completed within next m
investigated by vendor for possible strip & re -apply.
Alternates # d f
start. Site
Public Safety: Under slab M -E -P to be completed. paving binder to t ve for Sept.
utilities to be completed. Interior masonry walls to start and p g
2018.
Mr. Ahern mentioned the following potential upgrade, PR attachedosts: Change order . Review
Plants for Phase I
updated Contingency Log in detail. Walkway
Landscaping - $12,987.00.
nd exterior signage work and specifics of mezzanine
The committee discussed the interior a
deficiencies.
3. Proposed or Upcoming Changes/Change Orders/Ce orders (change order #14), which
Mr. Ahern went over the costs for the pending Chang
ained this
amounted es making the adjustment for ar. Ahern lcalculat on errogr for bond and builders risk order is compiled of 5 by BBBC, in
includes
previous CO approvals, as discussed previously with the committee.
Motion: Approve change order #14 for $21,556 (Paquin/Epstein). Vote is 6-0.
4. Project Budget and Contingency Log Update
Mr. Ahern went over the budget in detail and answered a couple of questions from Mrs.
Doherty specific to change order and base column. Mr. Ahern statedh Mr. Stanbrook and working
with Mr. Stanbrook to have the budget always up
dated as happening previously. All invoices will be coded slightly
eliminate some duplicate work that w
different to fit into Mr. Stanbrook's updated spreadsheet and tracking system. Mr. Ahern then
went over the contingency countdown log specifically the open lr. Ahernstated he was
noted a ection
on the WatchGuard system accounting from the that last
meeting. believed it wasn't accounted for in the
mistaken when he stated at the last meeting carried in the MIS budget,
original soft costs scope but actually n was d was never to item that wase part of the project budget. The
through previous email correspondart of the project budget the infrastructure for the
only costs that should have been p
2 P a g e2 0 1 8
M e C Mee [ I n g M i u u t e s August 2,
stem. Mr. Ahern stated that due to timing, he
system and not the actual purchase of the
believes it will end up coming out of the project budget and not operating as originally agreed
to. He will continue to keep it in the contingency countdown allowance.
5. Monthly invoices w/Application for Payment Approved by KBA and OPM
Mr. Ahern went over the invoices for Allegra, BBC (change), Comcast, HAKS, KBA, Mansfield
Electric, McMaster -Carr, Pro Cut Concrete Cutting, Pro Scanning, Projectdog, and Weston and
Sampson, for a total cost of $923,549.12.
Motion: Approve invoices for total of $923,549.12 (Paquin/Cook). Vote is 6-0.
Both Mr. Barry and Mr. Dumas left the meeting at 8:19 PM.
6. Updated Punch List Progress on Phase I DPW are not complete across the board:
The majority of the items are complete, but the following
door cores /keying, room signage, exterior building signage. The following area or room names
have incomplete items: closet, corridor, reference, D203, D role ts1m' vehicle maintenance,
small Hance,
toilet, locker rooms, mechanical, public buildings / special P compressor room, welding bay,
equip punch list items can be found in the
equipment maintenance, exterior, interior, mechanics room,
small equipment bay, and janitor. The details of these the
MBC packet as uploaded to the FTP site.
7. Hardware Protest Update Position on the matter to the
Mr. Ahern provided both a copy of BBBC's position and KBA's
' position on the specifics relative to
regarding
committee. Mr. Ahern asked Mr. Milani to present KB s p scope) the added and
the plans and specifications on this hardware issue. Mr. Milani went over the letters reg g
rials to
the COP 024 titled Finish
w th ware Amendments (mate
BBBC. Mr. Milani mentioned 'what ethe manufacturer
mentioned his correspondenceutes the cost differential (they believe they own none
bought, in unit rates, but that BBBC eid $41,000). Mr. Milani's position is that hardware
of the set and that they
should be p aid a rox. $5,000
scheduling lists hardware sets for different doors, and thhe B ld in escrow an
instead.
be utilized
instead. Mr. Milani mentioned that the $41,000 is being
believes a settlement should be reached while applying
until a resolution is reached. He also
s of expediency.
that money to the project for reason
Mr. Ahern explained in detail the position that BBBC was taking and their understanding of the
specifications as explained to him from Mr. Penta, owner at BBBC. Mr. Barry lied
plans and sp flaws in the bidding documents and Mr. Joynt rep
specifically asked KBA if there were any specified. The
yes, there was a slight flaw that's why KBA felt it was fair to offer
from what believe
sp a
approx. 5K in difference or upcharge type of a resolution but feels that
reasonable resolution of the app proceed with talks with
committee as a who fob Sl�unreasonables that we sand to authorize Mr. Ahern to p
what BBBC is asking
Mr. Penta in trying to bring this item to resolution. o kn ck off the labor associated with this
discussions with Mr. Penta, BBBC would be willing
31PagaA u g u s 2018
MBC Meeting Minutes [ 2,
which would reduce the number to 30K from e a e iginal 41K in the COP Mr. Ahern stated he
would talk with Mr. Penta and have an update
8. Masonry Prism Testing Results Updateand the
Mr. Ahern went over the results for Masonry Prism Testing (for compressive strength),
g they're not at fault as suggested by the designer at a previous
letter from HAKS (statin
meeting). It was noted that some of the original site samples were damaged prior to arrival at
ut corrected. was noted that it
HAKS and an incorrect sample size was taken at one point bmaterialtitious in grout mix).
appeared a lot of sand was in the Boro mix ower than d Omix des design st ength of 3000# and 2500#
ack of cemen
The grout breaks were coming '
transporting prisms, observing removal of
specification strength. Mr. Ahern shared an email addressed to BBBC, who are anticipate o
reimburse Mansfield for scanning, saw-cprisms &reporting results, and replacing & repairing
prisms, compressive testing of p art of
masonry p All prism testing, which are now p
the prism sample areas that were extracted for testing• isco testing successfully. Mr. Ahern
an assembly test of all the materials as a unit, passed the p ass as an
made clear that the grout, by itself, didn't pass the tests but all the prism units did p
assembly.
9. Public Safety Walkway Modifications — PR Review COP 115 (Doug Annino was on the
speaker phone for this discussion) forwarded by BBBC to furnish the
tete alterations to the Public Safety Building Entry. Mr.
Mr. Ahern went over the total quotation cost (at $61,622
labor and materials necessary to comp expected and
Ahern explained that he and the design
ced for m felt the of effort were
ahsgher th He sated that KBA
some items weren't reasonably p phases,n 2 one being specific to the walkway
is requesting that the COP d broken he heated 'sect on of the walkway, which is the majority of the
redesign and the second adding4-5K to be reasonable based on our
cost. Mr. Ahern anticipated the cost being reduced by
evaluation. The committee discussed the specifics and merits of the walkway heating system.
Chief Boldrighini raisedthe
question
stormlue s. Thishncluded aleating l walks walksent nand lentrandC 5 t the FD
has a bare pavement policy g ower to make this happen
two facilities. Mr. Cook then discussed the difficulties with mane
ar
for the
consistently and
at a hazard will exist for them du'rinlg ice conditionslk is as well.e main . The heated sidewalk
public and dewalk would eliminate this problem. Chief Boldrighini t sand thehge edral clonsenlsus'wasility ges.
essentially the same reasoning behind the epoxy floor
Motion: Approve the proposal for additional entry way, including heat, not to exceed $61,622
(Barry/Epstein; Doherty opposes). Vote is 6-1
10. Schedule for Grand Opening for DPW Phase I requested by selectman, to
Mr. Ahern brought up the point that the Town Manager has asked, req phase 1. The
schedule a grand opening for the DPW portion of the building as completion , 1
committee discussed this request and and
decided
elandsid d schedules presenOctober
Saturdal
tlycMrAhern w181 checlk with
the best date based on paving
4Pa 6eMinutes August 2, 2018
M B C M e e t in g
Mr. Dumas about what type of event or grand opening he is anticipating or would like to see
happen and report back at the next meeting.
11. other Items for Discussion Related to Municipal
Complex which s for an additional request for
Mr. Paquin mentioned signing off on MSBA pap
funding based on the OPM assigned to the project. The committee sparingly mentioned the
highway intersection and asked Mr. Ahern for an update which was stated that it's still in
redesign and will have a better answer at next meeting.
12. old/New Business
None
13. AdjournVote is 6-0.
Motion: Adjourn the August 2, 2018 meeting at 8:58 pm (Paquin/Doherty).
Signature v r
5 1 P a g e 2018
MBC Meeting Minutes August 2,
9�—
Date