HomeMy WebLinkAboutPlanning 03/14/2018Planning Board Minutes
March 14, 2018
Present: Tom French, Chair; Don Cleary, Clerk; Beth Ashman -Collins, Michael McClanahan,
Rich LeBlanc
Alternates Joe Cerretani and Sharon Friedman
Shaun P. Burke, Director of Planning and Development; Jennifer Davis, Administrative
Secretary
1. Minutes February 28, 2018
p. 2 4"' para — children will be 6 mos to 12 years
Motion: To approve as amended
(Cerretani-Cleary) Five in favor. McClanahan, Friedman abstained. PASSES
2. Public Hearing notices — Attleboro, Easton, Norton
3. The Beacon
Annual Town Meeting
Mr. Burke said town counsel has revised the drafts to the board's two recreational marijuana
articles; definitions of "canopy" and "marijuana" have been added. References to the Board of
Selectmen and Board of Health have been removed because counsel did not think the functions
of those boards have to be included in the Zoning By -Law, Mr. Burke explained state law has
changed and special permits are now good for three years rather than two. The setbacks have
been changed from 1,000 to 500 feet.
Mr. Burke said the Commonwealth's Cannabis Commission filed its final regulations last week;
they will be approved March 28 and the state expects the first licenses will be issued June 1,
Mr. McClanahan asked about cafes; Mr. Burke said the state has put that use off for a year. He
said the Board of Selectmen is reviewing the warrant tonight, including an article to ban the use,
an article to extend the moratorium and the Planning Board's articles. A ban would involve both
a zoning article and a ballot vote.
Ms. Ashman -Collins said when the board met with Chief Sellon, they discussed not allowing
cafes in any zone. Mr. Burke said if Town Meeting choses to limit the allowed uses, there will
also have to be a ballot vote.
None
hearing notice. Mr. French explained how the public hearing would be
conducted.
Attorney Edward Pare, Brown Rudnick and David Forte, AT&T Site Acquisitions
Planning Board 3/14/18
Attorney Pare explained the existing building is 42 feet high and the proposed antenna would be
nine feet tall. There will be one cylindrical antenna, 24.7" high and 10" in diameter, attached to
the roof by a mount along with the equipment, so there would be no need for a shelter. The
equipment will have low power. Attorney Pare explained the equipment needs to be close to the
roof edge; the by-law allows up to 12 feet. He said he thinks this will be low impact. Attorney
Pare said the photosimulations included in the application show the only place the antenna will
be visible is from the street in front of the building; it will not be visible from Route 106. The
antenna is mounted on a 2-3" pipe and will be ballast -mounted with weights to hold it in place;
the equipment will not penetrate the roof of the building.
Department Head Comments
The clerk read memos from the Conservation Agent and Mr. Burke.
Board Comment
Mr. French asked if the array could be moved to the elevator penthouse or back from the edge of
the roof to make it less visible. Attorney Pare said the equipment has been placed as far back on
the roof as possible; if it is closer to the edge, the building itself would cause interference. He
said the further back on the roof the equipment is placed, the taller it would have to be.
Ms. Friedman said the diagram appears to show some gaps remaining and asked if they will
share the antenna with other carriers. Attorney Pare said they do not share this type of antenna
equipment with other carriers. He said additional gaps may need to be filled in the future; this
type of small equipment has low power, which will suffice for their network needs at this time.
Ms. Friedman asked if another carrier could put another piece of equipment on the pole;
Attorney Pare said there would not be room for another carrier on this pole. He said another
carrier could apply to install their own equipment. Ms. Friedman asked what would prevent
them from coming back with another application for another site; Attorney Pare said nothing
would prevent that, but that this will take care of their need in Mansfield right now. He said it is
possible they may propose other structures in the future.
Mr. LeBlanc asked why the equipment cannot be lower than seven feet. Attorney Pare said the
top of the antenna is at nine feet, the top of box seven feet. He said the equipment box would not
be visible, only the top of the antenna. Attorney Pare said they have not run into any issues with
the small cells; he said the only other options would be to put the equipment directly on the roof.
Attorney Pare said the equipment would not be visible from the ground. Mr. Burke asked the
color. Attorney Pare said the equipment can be either brown or grey; he suggested grey because
it would blend into the skyline.
Mr. LeBlanc asked if this would have to be screened if it were mechanical equipment; Mr. Burke
said it would. He said if the equipment is installed below the parapet and the equipment is grey,
it would resemble a vent pipe. Attorney Pare said he doesn't think the equipment will be visible,
and only about half the antenna will be visible above the roofiine.
Mr. Cleary asked if the equipment is taxable; Attorney Pare said it is. Mr. Cleary asked if there
will be equipment run along the outside of the building; Attorney Pare said it there would not be.
Planning Board 3/14/18
Mr. Burke asked if the FCC requires a backup generator; Attorney Pare said they will connect to
power in the building and there is no requirement for a backup generator.
Mr. Burke said he thinks the applicant has answered the questions raised by staff, the board and
the public, the application meets the intention of the by-law to avoid towers when possible, and it
will be located on an existing building.
Public Comment
Kevin McNatt asked if the 42 feet is to the top of the parapet; Attorney Pare said that
measurement is to the top of the roof and the parapet is another four feet above that. The antenna
would be about six feet above the parapet.
Motion: Based on the information provided by the applicant, the Planning Board finds that a
gap in coverage exists. Information submitted in accordance with Zoning By -Law Section
3.6.7.2.6.1 demonstrates the gap in coverage would be eliminated after the installation of the
antennae, which were submitted with the special permit application and discussed during the
hearing. (McClanahan -LeBlanc) All in favor. PASSES
Motion: To grant the Special Permit under Section 3.6.7.2.6.lof the Mansfield Zoning By -Law
for the installation of one (1) 24.7" high, 10" diameter round antenna on top of a 32" high
equipment cabinet, both of which are attached to a metal post at a maximum height of nine feet
(9') above the roof of the existing 42 -foot (42') tall building, together with related cables, fiber
and other associated electronic equipment to be located upon the tripod antenna mount on the
roof of the building at 214 Rumford Avenue. This special permit is granted with the following
conditions:
1. Application for Special Permit and Plan Sheets Tl, C1, Al, A2 and A3, dated December 13,
2017, revised January 22, 2018 and further revised based on March 14, 2018 Planning Board
discussion and public comment, prepared by Hudson Design Group are incorporated into this
special permit decision by reference;
2. All above -referenced department head comments shall be fully and satisfactorily addressed
during the 20 -day appeal period;
3. The transmitting frequency shall not interfere, conflict with or interrupt any Town of
Mansfield radio or communications device or system;
Should an emergency generator be required by the FCC, the location shall be approved by
the Planning Board. The emergency generator shall have a noise suppression muffler and
cabinet enclosure to mitigate noise issues;
5. There shall be no signs placed upon the panels except as required by state or federal
regulations (eg:, FCC, FAA, OSHA);
5. If the structure upon which the antenna is to be located is torn down, falls down, or meets
some destructive fate brought about by a natural or manmade disaster, this permit shall not
Planning Board 3/14/18
allow a new interior or exterior wireless communication facility to be at that location without
a new special permit;
7. New Cingular Wireless PCS, LLC (AT&T) or its successor, owners or assigns shall
remove the antennas, panels, cable trays and covers at the equipment owner's
expense within one (1) year from the date of cessation of use;
8. Any equipment that may be exposed on the roof shall be painted grey.
(McClanahan -LeBlanc)
The board further discussed and found that the application as submitted meets all of the special
permit tests, as follows:
• There will be no negative impacts on the health, safety, convenience, general welfare and
amenities of the inhabitants of the Town;
• There will be no negative effects on adjoining premises, neighborhood character, and
social structure;
• There will be no negative impacts on vehicular and pedestrian traffic convenience, safety,
and adequacy, including an assessment of movement within the site and in relation to
adjacent streets, properties, or improvements;
• The Town has adequate municipal facilities and services, including, but not limited to,
fire and police protection, water provision, and wastewater disposal;
• There will be no negative effects on the natural environment; and
• There will be positive fiscal impacts, including effect on the tax and employment base,
municipal finances, and property values.
McClanahan - In favor. The impact will be minimal, and the benefits outweigh the detriments
Ashman -Collins - In favor. The impacts on health, safety and welfare will be positive, the
project will result in no traffic, noise or natural environmental impacts, and will have a positive
fiscal impact.
Cleary - In favor. The benefits outweigh the detriments, the project will have a positive impact
on convenience and fiscal impact.
LeBlanc - In favor. The benefits outweigh the detriments, this will provide service for local
residents and have no traffic impact.
Friedman — In favor. The benefits outweigh the detriments, there will be no adverse health
impacts, no traffic issues, maintenance will be minimal, and it will provide a service for
customers.
Cerretani — In favor. The benefits outweigh the detriments, the equipment will not be very
visible and will produce revenue.
4 Planning Board 3/14/18
French — In favor. This will have a positive impact on health, safety and general welfare with
increased cell service, not result in traffic problems, will not impact municipal services or the
natural environment, and will have a positive fiscal impact.
All in favor. PASSES
Motion: To close the public hearing (Cleary -LeBlanc) All in favor. PASSES
w
N;e`�tt�
The clerk read the public hearing notice.
Attorney Ricardo Sousa, Prince Lobel Tye, LLC; Ryan Monte de Ramos, TMobile RF Engineer;
Keenan Brinn, TMobile and Eco -Site Site Acquisition; Mark Correnti, realtor; Don Haes, health
physicist.
Attorney Sousa explained they met with the ZBA last week, which requested the Planning Board
work with it to hire an RF consultant to review the application materials.
Mr. French noted the applicant would also have to get an Amended Order of Conditions from the
Conservation Commission.
Mr. Monte de Ramos explained existing TMobile sites and the proposed location, along with T -
Mobile's in -building coverage and in -vehicle coverage.
Attorney Sousa said they have seven other wireless antenna locations in Mansfield, including
127 North Main, 241 Francis Ave, 230 Oxford Road and monopoles at 200 Gilbert Street, 615
School Street, 30 Reservoir Street and 520 West Street. He said they have tried to take care of
their gap in coverage using existing structures, but said the Branch Street area doesn't have a
building tall enough to fill the gap. He said an RF consultant would review TMobile's plots and
do a drive test to determine whether they agree or disagree about the gap. He said they are in the
I2 Zone, so need to prove they have a significant gap in coverage.
Mr. Monte de Ramos explained TMobile's existing coverage and said the proposed site is in the
middle of those existing areas. Mr. McClanahan asked the radius of the new coverage circle;
Mr. Monte de Ramos said it would be around half a mile. He said this tower is considered a low -
powered device with antennas on three sectors, and the signal dissipates as it moves through
structures. Mr. McClanahan asked how many customers would be in that radius; Mr. Monte de
Ramos said he does not know. Attorney Sousa said they would like to build their network to
gather more customers. Mr. Monte de Ramos said they use a lower band to overlay existing
network; most of their existing sites have already been upgraded.
Attorney Sousa said if the gap in coverage is overlaid with the zoning map, this site is in the
middle of their gap in coverage.
Mr. Brinn explained the alternative site analysis and why this site was selected — he said he
looked at where the search ring is drawn to pinpoint coverage needs. He noted this is a
Planning Board 3/14/18
brownfield site with solar panels. Mr. Brian said he extended the search to the south toward
airport and to the north toward East Street. The airport is restricted because of height, several
parcels are landlocked and would need access easements and they did not get a response from
some owners. He said they contacted owners of large Flint Farm and Mansfield Cable Access.
Mr. McClanahan asked if they looked at the back corner of the former dump site on East Street,
which the Police Department uses for a firing range; Mr. Brinn said they looked at the new
municipal complex and the former dump property across the street. Attorney Sousa said the
municipal complex is too close to one of their existing sites.
Attorney Sousa said the FAA would allow them to go as high as 137 feet on the Branch Street
site, but they are proposing 90 feet.
Attorney Sousa said he has been told the Board of Selectmen has authorized the Town Manager
to talk to them about town -owned sites; he said they would analyze any parcels the town is
interested in leasing.
Mr. Monte de Ramos said they looked at the Congregational Church on West Street but it is too
close to an existing TMobile site, which could cause interference.
Mr. Cleary asked about the airport tower; Mr. Burke said the existing tower is 70 feet high, not
in the glide path and could potentially be replaced with a taller tower. Mr. Burke asked about
Reservoir Street; Attorney Sousa said TMobile is on someone else's tower on Reservoir Street.
Attorney Sousa said they could check to see if the airport site would be too close to the Reservoir
Street site.
Don Haes, health physicist, explained his role is to come, up with a theoretical analysis of the
proposed facility and said he tends to be more conservative than the FCC. He said his exposure
calculations indicate the absolute maximum anyone would be exposed to, including assuming the
site is at 100% capacity, that the ground is completely reflective and that TMobile would be
mounting all their technologies. He said TMobile was a little behind in PCS technologies, so
they were not given large slices of the spectrum in which to operate, and are lower in power than
AT&T or Verizon.
Mr. Haes said with those assumptions, at six feet above the ground, he found much less than I%
of the allowable limit for public exposure at any distance from the structure. At 16 feet above
the ground, it would still less than I% of the allowable limit. Mr. Haes said he found this site
would be well within the limits for RF exposure.
Mr. Correnti explained his methodology for determining how towers would impact property
values. With towers, he said he looks at sales of similar homes. There are five cell towers in
town, but for an analysis to work, there have to have been sales. With no sales in Mansfield of
houses with views of towers, he said he looked at home sales in other towns, including Taunton,
Norfolk and Oxford. He said he talked to brokers about how a tower view impacted sales, and
was told there was not much impact. He noted The Village at the Pointe was built in 2003, after
the Reservoir Street tower. He said that is an example of a neighborhood being around an
6 Planning Board 3/14/18
existing tower and said he doesn't think the builder would put his money at risk if there was a
detrimental element. Mr. McClanahan said this is the opposite situation, with a tower being
proposed around an existing residential neighborhood.
Mr. Correnti said the qualitative approach is to look at sales around existing towers; he said
buyers have different perspectives and different needs, and if someone is willing to pay the
asking price, that is what will set market value.
Mr. Correnti said he does not think there is an impact from towers on real estate values.
Attorney Sousa said when the originally submitted the application, they proposed a monopole.
He said they also designed a "monopine" design option, which was submitted to the ZBA. He
said there are some other design options, like flagpoles, that will not support their equipment.
Department Head Comments
The clerk read memos from the Conservation Agent and Mr. Burke and a letter from the Zoning
Board of Appeals regarding hiring an independent consultant. The ZBA public hearing has been
continued to April 3, 2018.
Attorney Sousa said they have not filed with the Conservation Commission yet, but said they
plan to.
Attorney Sousa said the tower would have a fenced compound around it.
Attorney Sousa said they are not proposing an antenna farm, but one tower that could
accommodate up to two other carriers. Mr. LeBlanc asked if there would be different levels for
the carriers; Attorney Sousa said TMobile would be at the top, and there has to be 10' of vertical
separation between carriers. He said nothing below 65 feet would be viable.
Mr. Burke asked if the pads on the ground are future tower pads; Attorney Sousa said they are
not for future towers, they are for future equipment pads. He said an equipment cabinet is the
size of a small refrigerator.
Mr. LeBlanc asked if they are applying for all three now; Attorney Sousa said they are applying
for the tower and for TMobile's equipment on the tower; if another carrier were to come in to
collocate on this tower, they would have to apply for a new special permit.
Mr. Cerretani asked for specific dimensions on the plan; Attorney Sousa said they would add
that.
Mr. Burke said he is uncomfortable with a 90 -foot tower for one carrier now and possibly two
others later. Attorney Sousa said this is not a tower being built on spec; Eco -Site has a lease
agreement with TMobile, which is licensed to construct and operate a wireless network in
Mansfield, and is a co -applicant with Eco -Site.
7 Planning Board 3/14/18
Attorney Sousa said the transformer is outside the fenced area because the utility company
requires it for access.
Attorney Sousa said they will bring power and fiber to the site from Branch Street through a
five-foot utility easement, which he said is entirely on their property. He said they do not
anticipate needing an easement from the town for access through the bike path.
Mr. Burke suggested the applicant continue to pursue the landowners they have not heard from.
Attorney Sousa said they would do that.
Attorney Sousa said they would do an analysis to see if the Reservoir Street site is too close to a
potential tower at the airport.
Mr. Burke suggested looking at the town's former dump site, which is several thousand feet
closer to the Branch Street site than the municipal complex.
Public Comment
The clerk read a letter from Andrea and Vincent Lattuada, 31 Deer Path Lane.
James Farley, 18 Lincoln Road, said his house is the closest to the proposed tower. He said he
has TMobile and has no issues. He said he is concerned about safety and said when the solar
arrays were installed, all the trees were removed, eliminating the wind break and changing the
direction and magnitude of the wind. He said the soil near the wetlands is not the most stable
and the board should consider the safety of a 90 -foot tower and where it go if it fell over. He
said he doesn't think the alternative sites were pursued. He said the application doesn't read like
TMobile has a significant gap in coverage, but rather like the landowner was looking for a tower
for the site. He said he is concerned about property value and aesthetics, and has reached out to
the landowner about existing aesthetic concerns, with no response. Mr. French suggested
contacting the building inspector if there are building or zoning violations. Mr. Farley said he
would request the independent consultant verify the claim there is a gap in coverage.
Julia Camp, 14 Lincoln Road, submitted letters from neighboring residences. She said she
would not have moved to this neighborhood if there were a cell tower there and she thinks a
tower, even a monopine, would be out of place. She said the photosimulations do not take the
yards on the bike path side of the street into consideration. She said the applicant said the new
tower would cover one-half mile, which she said would not be a wide coverage area. She said
she thinks there are other site options that were not pursued and the applicant has not done due
diligence. She said she thinks they did not hear back from some owners because they had old
ownership information.
Sergio Martin, 10 Lincoln Road, said he thinks the application has inconsistencies. He said he
doesn't think there is a gap in coverage and noted the TMobile website claims there is no gap
and they have full coverage. He said the documents in the application do not have any
certification from TMobile, and the application should include complete documentation of each
site they looked at. He said he is concerned about the applicant's attorney working with the
consultant; Mr. French said the consultant will work for the town. Attorney Sousa said their data
Planning Board 3/14/18
will have to be submitted to the consultant; he said he would copy Mr. Burke on any
correspondence with the consultant. Mr. French suggested Attorney Sousa supply the
information to Mr. Burke, who would send it to the consultant.
Mr. Martin said the real estate analysis looked at towers in the distance, but this would not be in
the distance. He said he found a 2014 study from National Institute of Science about the impact
of a tower on property buyers, which said 94% of respondents said the existence of a tower
would impact whether they would buy and how much they would pay. Mr. Marin said he found
another study indicating buyers would pay up to 20% less for a property near a tower.
Robert Camp, 14 Lincoln Road, said the tower is 90', but the application says it could go to 110'.
He said he measured the balloon picture, which is slightly different from the antenna picture, to
see what it would look like from his house. He said he would see the tower from everyplace in
his house, his yard and his neighborhood. He said this would not be in the distance. Mr. Camp
said he would not have built his house if the tower were already there. He said the study Mr.
Martin cited included a market analysis, which showed a 21 % drop in price. He said if the tower
falls, it could land on his neighbor's property. He said since the trees were cut, there is a lot
more wind.
Amy Frazier, 23 Deer Path Lane, asked if TMobile is the coapplicant; Attorney Sousa said Eco -
Site and TMobile are coapplicants. Attorney Sousa said if the board would like, he would be
happy to amend the application and send but new notices. Attorney Sousa said Eco -Site has
signed a ground lease with the owner and TMobile has signed a site lease with Eco -Site.
Ms. Frazier said the affidavit in the application does not say there is a "significant gap in
coverage." Attorney Sousa said "gap in coverage" is not well-defined by the federal courts; it is
dependent on the board's determination and the court's review of that determination. He said
they can appeal under the Telecommunications Act.
Ms. Frazier said the impact of the previous application, for a rooftop wireless antenna at 214
Rumford Avenue, would be very small, but provide a lot of people around the train station with
coverage; but this proposal is for a small coverage area and would have a huge visual impact.
She said there are not many houses in the expanded area and there is a lot of undevelopable land
in that area. Attorney Sousa said the difference between their application and the previous
application is they are adding a small site within an existing coverage area that does not have
enough capacity.
Mr. French encouraged the abutters to send questions to the Planning Department to be passed
along to the consultant.
Bob Matthias, 288 Branch Street, asked how the tower will be erected and if the ground can be
dug because of the contamination; Attorney Sousa said the work area is outside the AUL area.
Mr. Matthias asked why TMobile has a coverage problem and asked if they could raise their
existing towers. He said he is concerned the tower could go to 110 feet. He said he saw the test
balloon go up over the summer and he will see the tower from his property. He said he thinks
his view will be compromised. He said an abutter said the panels reflect, which should not
Planning Board 3/14/18
happen if they were installed properly. He asked how the real estate appraisals were done and
said they were not very descriptive. He said he doesn't think the comparisons are good
analogies.
Board Comment
Mr. McClanahan asked about ZBA; Attorney Sousa said it was continued to April 3, but it may
need to be continued again to give the consultant time to review the materials. Mr. French said
he thinks the applicant needs the variance prior to the special permit.
Ms. Friedman said the lease agreement is between Eco -Site and Branch Street Development
Partners, not TMobile; she asked how much they are obligated to the site, and whether they are
proposing to litigate using FCC regulations if the ZBA doesn't grant a variance and the Planning
Board does not grant the special permit. Attorney Sousa said it is premature to talk about
litigation. He said to appeal, there would have to be a denial that would prohibit or have the
effect of prohibiting wireless communication. He said the lease is conditioned upon obtaining
approvals; they have the right to terminate the lease if they cannot obtain approvals. Ms.
Friedman asked about the potential for moving from this site to another one. Attorney Sousa
said they are trying to be respectful and go through the permitting process. He said without a
ground lease, they could not have filed the applications.
Mr. Cleary asked about screening along the bike path. Attorney Sousa said there has not been a
discussion at this point. Mr. Cleary said it would be nice for the landowner to replant the dead
trees. Mr. Cleary asked if they check for contaminated soil; Attorney Sousa said they would.
Mr. Cleary asked about talking to the town; Attorney Sousa suggested the board ask the Town
Manager to contact him to discuss what town properties might be made available.
Motion: To continue the public hearing to May 23, 2018 at 7:15 p.m.
(McClanahan -Cleary) All in favor. PASSES
Mr. Burke asked the board if it wants to move forward with both recreational marijuana by-laws.
Mr. French asked if the town would be covered if the board only goes forward with the
cultivation by-law. Mr. Burke said he doesn't think the board has to bring both, and said he is
concerned that bringing both would confuse Town Meeting. He asked if the board's intent is to
get revenue for the town, they should take the retail by-law to Town Meeting because that use
would come with a sales tax. Mr. French said the town may also gain revenue from cultivation
because it can tax the building and equipment. Mr. Burke said cultivation would probably be the
least impactful on town services. Mr. McClanahan asked if the town could have one and not the
other; Mr. Burke said he thinks it can. He said limiting the uses would require both a Town
Meeting and a ballot vote.
Mr. LeBlanc asked if the number of lots in the proposed cultivation zone would be too limited;
Mr. Burke said he doesn't think so, and said they are all under different ownership. He said
Attorney Ross from Town Counsel's office did not raise that as an issue. Mr. Burke said the lots
range in size from one to ten acres.
10 Planning Board 3/14/18
Mr. French suggested holding public hearings on both articles, and deciding whether to go with
one or the other, or both, after the public hearings. Mr. Burke said he has requested all the
recreational marijuana articles be grouped together on the warrant.
WIN — ME-- 10101-M-106=1
None
Mr. Burke said the DLTA grant submitted by the Planning Department for analysis and review
of the TOD zoning to work toward a unified policy was not funded.
Ms. Ashman -Collins said the Downtown Committee has been talking about signage for
municipal parking lots and would like to establish a uniform wayfinding program.
Ms. Friedman said the Open Space & Recreation Committee is meeting next week and will be
looking at what different parcels of land need and funding resources.
Mr. Cleary said the town has lost a number of parking spaces to piles of snow
: To adjourn at 10:45 p.m. (McClanahan- ) All in favor. PASSES
Next Planning Board Meeting: March 28, 2018 at 7:00 p.m.
7
Signature of Clerk
`r1 f2DI
Date of Approval
11 Planning Board 3/14/18