HomeMy WebLinkAboutCapital Improvements 01/27/1994CAPITAL IMPROVEMENTS COMMITTEE
MINUTES
JANUARY 27, 1994
PRESENT: David McCarter, Dianne
Marydee Flynn, Michael
Ralph Penney
1�
f
Royle, Lawrence Carpenter, �SfijJ
McClanahan, Philip Smith, S
William F. Williams, Town Manager
Shaun P. Burke, Director of Planning and Development
Robert Swanson, Town Engineer
David Archard, Assistant Town Engineer
Paul Howard, Tata and Howard
Greg Roy, Camp, Dresser and McKee
James Small, Camp, Dresser and McKee
1. Meeting called to order at 7:15 P.M.
2. Water Projects - Ash Property
Bob Swanson explained the Ash Property was purchased by
debt exclusion in 1989. Prolonged pump tests show it has
outstanding capacity and could be the town's biggest
producing well.
Mr. Swanson went on to say that tests also show it has a
high level of iron, which will require a filtration
system. A green sand filter would be needed and would
cost $1.2 million. $750,000 had already been approved at
Town Meeting, which would cover the design and
construction of the well, but not the filter. Mr.
Swanson requested the CIP think about supporting the
filter system and the logical outgrowth of a Town Meeting
vote to acquire and develop the Ash Property. Mr.
Swanson said the need to develop the well now is very
clear as a result of very high water demand last summer.
Paul Howard explained the current pumping capacity,
results of increased water demand and safe daily yield of
the existing wells. Mr. Howard said the maximum daily
demand was 5.06 million gallons last summer. Mr. Howard
also cited a recent report that make the assumption 25%
of all water used is lost/not accounted for. Mr. Howard
stated the increased demand resulted in 24-hour per day
pumping at town wells during the past summer, and
resulted in a dramatic draw down of the well and
deteriorating water quality.
Mr. Howard said future water quality regulations
governing effect of pumping at the Ash Property on the
surface water, specifically Wading River, is unknown at
the time. The result is a potential future need for a
disinfection chamber and cost to design and construct
same.
Mr. Swanson explained the prolonged pump test for the Ash
site has been conducted at a cost of $115,000 and is good
for five years.
Mr. Howard estimated there will be 40-50 wells in this
well field, which could produce up to 1.5 million gallons
of water per day.
Mrs. Royle said it appears there is no alternative at
this point other than bringing the Ash Property on line,
since there are no other readily available sites.
Mr. McClanahan asked about the Dustin wells. Mr. Archard
explained they are only used in emergency situations, and
Mr. Howard added that the cost of filtration for the
Dustin wells would be about $1.5 million.
Mr. Williams asked what the maximum safe yield of the Ash
Property would be. Mr. Howard responded it would be
approximately 1,030 million gallons per day.
Mr. McClanahan asked if pumping at the Witch Pond wells
would effect the Ash Property and was told by Mr. Howard
it wouldn't.
Mrs. Flynn asked if money was being requested for Dustin
and what the total cost of the Ash Property would be.
Mr. Swanson responded that it would be $2.075 million,
including funds already allocated, and would take two
years to bring on line. No money is being requested for
Dustin Well at this time.
Mr. McCarter asked when Mansfield would reach maximum
capacity with the wells currently on line. Mr. Howard
said the town is very close to that now, with 2.49
million gallons per day; The town possesses DEP permits
for pumping up to 2.52 million gallons per day.
Mr. Smith asked if DEP acts only on information given to
it by the town when evaluating emergency situations. Mr.
Howard said DEP requires extensive documentation.
Mrs. Flynn asked how long the Dustin wells were on line
during the past summer. Mr. Archard explained it was
about two months, from the beginning of July to the
beginning of September.
Mr. Williams told the committee that with a change to a
water enterprise account. The Water Department could
build up reserve capital, a rate increase could be
avoided when making improvements to the system.
Mr. Smith said there are ways to eliminate a spike in
water rates and ways to front end load the cost of
capital improvements that result in progressively lower
cost.
Mr. Swanson estimated that this request will result in
about a $200,000 per year debt, the rate increase would
be 15% from the current rate.
Mr. Penney asked if anyone had ever calculated the actual
cost of a cubic foot of water and if the green sand
filtration was the best available technology. Mr.
Swanson explained the water cost is based on the budget
and billing units. Mr. Swanson also stated the filter
appears to be best available technology for this
application.
Mr. Penney asked if all the town's wells will need to be
filtered at the same point. Mr. Howard said that all
things being equal, not all wells will need filters.
Some, like Cate Spring, produce very high quality water.
Mr. Archard estimated the useful life of a well to be 25-
30 years.
Mrs. Royle asked if any other wells, such as Dustin,
i, would be abandoned after the Ash property is brought on
line. Mr. Howard told her that Dustin's safe yield is
.86 million gallons per day and he would not recommend
abandoning a well with a pumping supply of that
magnitude.
Mr. Penney inquired about the Zone II of the Ash Property
overlapping the City of Attleboro water supply and about
the type of pump to be used. Mr. Howard said the well
would be on a manifold system with just one pump. The
wells are shallow, approximately 12 to 15 feet deep. Mr.
Swanson added that Attleboro has not conducted a Zone II
at the Balcom Street site.
Fluoridation
Mr. Swanson explained that the state has designated a
fluoride injection system, with 100% state grant funding
available. Mrs. Flynn expressed concern that the
fluoride program may require close scrutiny and extensive
maintenance of the injection system and asked if the
state grant would cover that as well. Mr. Howard said if
the town goes ahead with the fluoridation before the
grant is available, there will be no reimbursement, and
maintenance cost would be the responsibility of the Town.
3. Sewer Department
Two consultants from Camp, Dresser and McKee, Greg Roy
and James Small, joined the meeting.
Mr. Swanson explained that an extensive study of
inflow/infiltration had been done, which found ground
water and illegally pumped water entering into the sewer
system. CDM has provided the town with a list of
projects that demonstrate locations that need to be
repaired, at a cost of $267,000. That cost would
represent an approximately 7% increase in rates. A bond
could be stretched over 5 years at $70,000 per year or
over 10 years at $40,000 per year.
Mr. Swanson added that the two questions to be decided
are whether to expand the waste water treatment plant or
to reduce the inflow/infiltration level.
Mr. Carpenter asked if a large number of illegal tie-ins
had been found. Mr. Small responded that approximately
60 illegal tie-ins had been found.
Mr. Swanson said Norton and Foxboro are charged for their
total flow infiltration, and thus pay for ground water
that infiltrates the system, but Mansfield bears the cost
of treating groundwater from Inflow and Norton and
Mansfield to conduct their own.
Mr. Williams questioned the town's ability to require
Inflow and Infiltration studies and projects. Mr. Small
said it could be dealt with through an amendment to the
intermunicipal agreement.
Mr. Carpenter asked how long it would be before the plant
needs expansion. Mr. Swanson explained the plant has a
capacity for 3.5 million gallons per day, and is
currently operating at 2 million gallons per day so
expansion is not a need at this time.
Mr. Smith asked if this capital expenditure would reduce
the sewer budget. Mr. Swanson said some -savings may be
realized, but until everything is on line and working, he
couldn't say how much the savings would be. Mr. Small
added if the flow is decreased, the cost will be also,
because the cost of purchasing chemicals and similar
items will decrease to some extent.
Mr. Swanson requested $125,000 within the budget for KOH
conversion for the Prescott Wells, which would not
require an increase in rates.
4. Adjournment
Adjournment at 8:55 P.M.
Date of next meeting: February 3, 1994 7:00 P.M.