Loading...
HomeMy WebLinkAboutCapital Improvements 01/20/2011t! r Capital Improvements Committee Minutes January 20, 2011 Present: Charlene Lavin, Chair; Michael Trowbridge and Jean Miller, School Committee, Shawn MacDonald, Planning Board, Tommy Ratliff, Finance Committee, Alan Clapp, MBC William Ross, Town Manager, Shaun P. Burke, Director of Planning and Development Lee Azinheira, DPW Director, Michael Ahern, DPW Special Projects Manager, Mark Cook, DPW Highway Manager, Ken Hackett, Wastewater Operations Manager 5. The meeting was called to order at 6:00 p.m. 2. Correspondence 3. January 6, 2011 Minutes Motion: To approve (Trowbridge -Miller) All in favor. PASSES 3.Department of Public Works Requests Parking Enterprise Mr. Azinheira explained the $100,000 request includes three electronic pay boxes at $25,000 each and the $25,000 for installation. Each box has a life span of approximately seven to ten years. He explained this would be a service to commuters and will provide better security and accounting practices. He said the parking areas are operating at about 65% capacity. The committee discussed some commuters' requests for a phone app to pay for parking, which would not affect CIP. Wastewater Mr. Azinheira explained the sludge pump replacement ($171,000) will come out of the Wastewater Enterprise Account. He said the pump needs to be replaced now and cannot wait until the next phase of plant improvements. One-third of the cost will be reimbursed by Foxboro and Norton. Public Buildings a. The back wall of the salt shed is bowing and needs to be braced. Mr. Clapp asked if this would be a permanent fix; the answer was yes. b. There is a draft of the building study, which is being done for planning purposes with an eye toward a long-term maintenance plan. The study will include only municipal buildings, no school buildings (except Memorial Hall). Memorial Hall needs quite a bit of work, but is on the National Register of Historic Places, so a specialty firm will be needed. c. The Highway Building design, approximately $600,000. They would like to use $40,000 for the preliminary design. The former compost facility site on Fruit Street may be used for the highway building; the existing building is 15,000 square feet. This site was not part of the original DPW/Fire Station planning process. Highway Division a. Roadway/bridge maintenance — West Street bridge in front of the Police Station b. Roadway Maintenance Index - $800,000 request is to maintain the current conditions by preventing further deterioration. Chapter 90 funds plus $800,000 per year will keep a PCI of 80.. Equipment Sidewalk plow has been moved from 2014 up to 2012. Replace V -plow with snow blower. Priorities: #I — bridge/roadway maintenance #2 - 10 -wheel dump truck #3 — sidewalk plow/ -snow blower Mr. Ratliff asked what the ideal number of trucks and sanders would be. Mr. Cook said he would like to buy one and retrofit one. They have five sanders, but ideally they would have six or seven. He said they should be replacing one truck every three years. Mr. Cook said a 20 -year life cycle is realistic, and noted a 1989 truck just came off the road, and a 1991 truck will be coming off the road this year. The committee discussed outsourcing. Mr. Cook explained the sander trucks double as plow trucks, and must be able to respond to emergency sand calls. Motion: To adjourn at 7:25 p.m. Date of next meeting: February 3, 2011 i( Gt 443L26) l Signat re of Chair Date of Approval