Loading...
HomeMy WebLinkAboutCapital Improvements 11/08/2011i Capital Improvements Committee Minutest?, RECEIVED r` 4 . November 8, 2011 ('LERKS OFFICE Present: Charlene Lavin and Tommy Ratliff, Finance Committee, Kevin Mgy�pJr, Board of Selectmen, Mike Trowbridge and Jean Miller, School Committee, Tom Fren�Y%rP it@aBprdl. 3 Bob Barry, Municipal Building Committee r �sFIE�o William Ross, Town Manager, Shaun P. Burke, Director of Planning and Dev� o rizeriY{ ETTS Lee Azinheira, DPW Director, Mark Cook, DPW Highway, Mike Ahern, DPW Public Buildings 11 The meeting was called to order at 6:00 p.m. 1. October 25, 2011 Minutes Motion: To approve as submitted (Trowbridge -Moran) All in favor. PASSES Mr. Azinheira explained the request for $24,000 for a 4x4 pickup truck. He said the existing truck is a 2001 model with 173,000 miles with significant rust on the body and will not pass inspection when it is due in December. A replacement has been on the CIP list for three years. Mr. Azinheira explained the $8 million request for the new DPW facility design and construction. The preliminary design was funded through CIP last year. Mr. Azinheira explained the building needs $600,000 worth of work. The proposed new facility is 30,000 square feet on Fruit Street near the salt shed. (The composting operation on Fruit Street has stopped.) The vehicles will be parked inside the building. The committee discussed the increase in traffic this facility would cause, since the site is currently vacant. Mr. Azinheira said heavy trucks have been using this site for years. The committee discussed freeing up the current DPW site for a combined public safety building. Mr. Azinheira said a public safety study will be done next year. Mr. Ross said this project may not be ready to go to the 2012 Annual Town Meeting. Mr. Ratliff said it does not make sense to ask for a separate debt exclusion vote for the DPW and public safety buildings. The committee discussed the fact that repairs to the existing Police, Fire and DPW facilities will be minimal and only made in emergencies. Mr. Azinheira explained his request for $754,000 in other building improvements and an estimated $300,000 in North Common improvements. 4 DPW Highway The committee discussed roadway maintenance and the merits and cost of chip sealing versus overlay. Mr. Azinheira said a two-inch overlay will be done on Forbes and West Streets, which should last 12 years. DPW Highway requests are as follows: 1. Roadway maintenance - $800,000 2. Tennis Courts - $60,000 (four courts at Memorial Park and two at Plymouth Street will be crack sealed, painted and refinished) 3. Brush Tractor - $109,000 (the existing brush truck is a 1972 model with a six-foot arm; the proposed unit would have an 18-21 foot arm. 4. One -on Flatbed Truck with plow to tow the hot box (replaces a 1995 six -wheel pickup) 5. One -ton 4x4 pickup with plow - $45,000 6. One -Ton 4x4 SRW utility truck - $55,000 7. Chauncy and Forbes signal upgrade - $20,000 8. Memorial Park basketball court - $19,500 5 DPW Water 771 Valve Exercise Machine - $53,000 3/< -Ton, 4x4 Extended Cab Pickup with plow - $42,000 6 DPW Parking Paving Improvements - $175,000 Upgrades to downtown parking lots - $225,000 Wastewater has no requests. Mr. Azinheira will provide the committee with copies of the spreadsheets showing the costs of the regional wastewater plant. Motion: To adjourn at 7:30 p.m. (Trowbridge- Miller) All in favor. PASSES Date of next meeting: November 22, 2011 at 6:00 p.m. Signature of Chair Date of Approval