HomeMy WebLinkAboutCapital Improvements 11/20/2012Capital Improvements Committee Minutes
November 20, 2012 ; c�
OFF ICE
Present: Scott Feely and Michael O'Brien, Finance Committee; Kevin 19��n'�1}dl
George Dentino, Board of Selectmen; Mike Trowbridge and Jean Miller, e o'o S A I I 115
Committee, Beth Ashman -Collins and Michael Feek, Planning Board; Bob Bal ry,
Municipal Building Committee
William Ross, Town Manager; Lee Azinheira, DPW Director; Kurt Gaffney, Water
Operations Manager; Mark Cook, DPW Highway; Mike Ahern, DPW Public Buildings;
Ken Hackett, Wastewater Operations Manager, Dave Young, CDM
,was called to order at 6:00 p.m
6 =: Correspondence=
November 8, 2012 Minutes
Motion: To approve as submitted (Trowbridge -Miller) All in favor. PASSES
7 -77771
77
7-;'_ Departmenf'of Pubhrc Works Requests
Water
Mr. Azinheira explained the department is wrapping up the large water projects and will
spend $11.3 of the $12 million approved.
Mr. Azinheira said item #2 on his list, Prescott Wells 8 & 9 Engineering Design
Services, will come out of capital and $50,000 be put into the Engineering operating
budget. Construction on the Prescott wells is expected to begin in 2015.
Motion: To approve $50,000 out of the Engineering operating budget for engineering
design services for Prescott Wells 8 & 9 (Trowbridge -Moran) All in favor. PASSES
1. Water Main Improvements (Water Enterprise) $136,000 —Mr. Azinheira said he
plans to design and bid the water main replacements, with construction planned for
2016. He said the department's reserves are about $1.75 million, and he would like
to fund as much as possible out of the operating budget and to spread the costs out as
much as possible. The work should be done in one construction season. Mr.
Gaffney said there have been three water main breaks on Spring Street in the last
four years, and he is planning to replace the old line with a 12 -inch line. There have
been a lot of complaints about brown water from West Mansfield, and Mr. Gaffney
said part of the problem is an old cast iron main. He said he plans to disconnect
customers from that line and tie them into the existing, newer 12 -inch main. He is
also planning to loop the existing water main on West Street at Black Pond Road
because of dead ends. Mr. Azinheira said they plan to replace the West Street bridge
and culvert in 2015-16, along with the old cast iron main under it; he said
construction could happen sooner if conditions warrant. Mr. Gaffney said they have
submitted a Master Plan to the state, so the town is in a good position if funding
becomes available sooner. Mr. Azinheira said the town has attempted to loop as
many water lines as possible, which helps improve water quality. Mr. Gaffney said
with the treatment plans coming online, the town will no longer have to add iron and
manganese to the water.
Mr. Dentino asked how new hookups are funded. Mr. Azinheira said town work is
funded through the enterprise fund, and the town charges a connection fee for private
construction. The residential charge is based on bedrooms and commercial is based on
the size of the meter.
2. Prescott 8 & 9 Engineering (Water Enterprise) $72,000 — removing from capital
plan and moving into Engineering operating budget
Meter Reading Hardware (Water Enterprise) $45,000 — Mr. Gaffney said the
equipment is seven years old, but the manufacturer will no longer service it. He said
they are converting the whole system to monthly billing rather than quarterly, and
the new system will allow them to read the whole town in four days.
4. Meter Replacement (Water Enterprise) $80,000 — The existing equipment has a 15 -
year maximum life span, and this request would allow them to replace about 500
meters. He noted there are around 7,500 meters in town, so this will be an ongoing
program. The cost per household is about $150.
5. Vehicle Replacement (Water Enterprise) $27,000 — Mr. Azinheira said they try to
replace their trucks on a regular basis, and if there is any life left, they turn them
over to Highway. Mr. Gaffney said the truck has 80,000 miles on it.
Mr. Dentine asked how many meter readers there are; Mr. Gaffney said there is one
part-time meter reader, who is also a water technician, services the equipment and helps
digging crews.
Mr. Azinheira said most residences are now on quarterly billing, and the goal is to bill
monthly. He said it would be a benefit to the residents to receive bills more regularly.
Mr. Feely asked if the benefit of increased cash flow will outweigh additional staff time.
Mr. Azinheira said MMED is converting to similar remote readers; Mr. Ross said there
will be a retirement in that department that will not be filled. Mr. Trowbridge suggested
this issue may be beyond the committee's scope.
Public Buildings
Mr. Ross said a long-range plan was prepared last year for municipal building upkeep.
Mr. Azinheira said he has the report in electronic version and would send it to the
committee.
1. DPW Facility Design/Bid $900,000 — Mr. Azinheira said he is working with the
MBC on a preliminary design for the new facility and to evaluate alternatives. He
said he expects the final report soon. He said the report includes a list of
expenditures for the Highway Garage, Fire and Police Stations; he said the goal is to
move the Highway Garage to the former composting site on Fruit Street and build
new public safety facility at the existing DPW garage on East Street. To that end,
improvements to the DPW, Police and Fire buildings have been postponed.
2. Building Improvements — Library $117,000; Town Hall $216,000; Plymouth Street
$49,000
Mr. Azinheira said building maintenance has not been funded much in the past, and
not doing maintenance on things like boilers can cost more money in the long run.
Mr. Feely said the public works facility is an important item and asked if the town
could get any additional use out of the existing building; Mr. Azinheira said the
building wouldn't have room for more than vehicle storage. Mr. Ross said because
the existing highway garage and salt storage shed are in different locations, the salt
has to be loaded into trucks ahead of time, which corrodes the truck bodies. Mr.
Trowbridge said even though this is a large project, a lot of the town's debt service is
about the come off. Mr. Moran said the town has to start putting money into Fire,
Police and DPW buildings, either the existing buildings or new buildings. Mr. Feely
said a new DPW building would provide a cost benefit to the town in increased
efficiency and service.
Mr. Barry asked what will be done at the Library/COA building. Mr. Azinheira said
the bathrooms have been done, but there are still a number of issues like emergency
lighting, parking lot, carpeting, painting that must be completed. The fire alarm
work will be postponed, and the requests will total $525,000 over the next three
years. Mr. Ross said the roof will also have to be replaced, and the carpeting could
become a safety problem. Mr. Azinheira noted the building also houses the Council
on Aging. Mr. Ross said he has spoken with the School Department about
combining the school and public libraries.
Highway
1. Roadway/Bridge Maintenance $825,000 - Mr. Azinheira said this is the third year of
this program, and the town has to invest in roadway and bridge maintenance
annually. He said they have to be able to use the entire construction season to keep
up with the work. The three-year plan will be updated this winter and put on the
town's website so residents can see what is planned. Mr. Trowbridge said the
department has done a good job combining repaving with other roadwork.
2. Memorial Park Tennis Court Refinishing $30,000 — Mr. Trowbridge said the courts
were redone at the same time the high school track and field were done, around
2000. Mr. Cook said he has the courts inspected regularly and they are ready to be
redone.
3. Roadside Brush Tractor $125,000 - Mr. Azinheira said the town is behind on brush
clearing work, and they are evaluating type of tractor and may change model to a
less expensive one. Mr. Cook said the existing tractor is from 1974. Mr. Azinheira
said he will submit supplemental information in the next few weeks. Mr. Feely
noted the committee's final meeting is scheduled for December 18. Mr. Trowbridge
said there are safety issues developing because of overgrown brush, especially in
intersections. Mr. Feely suggested looking at combining the brush cutting with the
Light Department's tree trimming work.
4. 1 -Ton 4x4 SUV/Pickup $32,000 — The request is for a 3/4 ton to replace Mr. Cook's
10 -year old vehicle. He said Mr. Cook puts very low mileage on his vehicle, and his
truck is rotated into the Highway Department fleet to get more life out of it.
5. 1 -Ton 4x4 SRW Pickup with Plow $36,000 — The truck is used mainly for Parks
maintenance, towing trailers, trash pickup and plowing in the winter.
6. 1 -Ton DRW 4x4 Flatbed with Plow $55,000 — This truck is a flatbed with a lift gate
used at construction sites and to carry things like steel plates. It is also front line
snow equipment.
Parking
1. Parking Deck Study (Parking Enterprise) $150,000 — Mr. Azinheira explained Town
Meeting funded $125,000 in 2012 for repaving the Winthrop Street parking lot,
which has been repaired and crack sealed. He said the town has been working on a
long-term evaluation of parking in the train station area, town meeting has approved
some funding and there may be more available from the state. Mr. Barry asked
about the increase in parking; Mr. Ross said would be part of the study, along with
elevators and walkways to cross the tracks. Mr. Ross said the parking deck would
be necessary for the redevelopment of the area and one part of moving ahead with
that would be working with private developers to help fund the deck. He said the
state has been emphasizing this type of development as a priority. Mr. Trowbridge
said the town has been talking about revitalizing the downtown area for 15-20 years.
Mr. Ross said there is $200,000 in the state budget allocated for train station area
work in Mansfield, but it has not been released yet. Mr. Dentino said there is going
to be a traffic problem in the area until Route 106 is widened. He said the towns that
have done this type of development successfully have done it through Transit
Oriented Development. Mr. Feely said the town has to show the state it is serious
about the redevelopment; Mr. Azinheira said they have met with the state twice, and
the representatives were encouraging. Mr. Dentino asked if anyone is working on
grant funding; Mr. Azinheira said Mr. Burke has been working with SRPEDD. Mr.
Ross said he has been working with the Department of Transportation, which
recommends the town set its priorities. Mr. Dentino said the town has to work with
the private owners in the area to accomplish any changes.
Wastewater
1. Wastewater Treatment Plant Phase II Design/Bid (Wastewater Enterprise)
$3,250,000
Mr. Azinheira said he would like to have the flyover survey done in March. The
Comprehensive Wastewater Management Plan began in 2003, and 2007 Annual
Town Meeting approved the first phase of construction. Mr. Azinheira said they
have been working with Norton and Foxboro and are closer to purchasing the second
piece of property. He said the EPA has been looking at all plants discharging to the
Taunton River watershed, which will impact the level to which the water has to be
treated, which may in turn will change the plan. Costs were based on 1 million
gallons per day, which Mr. Azinheira said he recently found out did not include
120,000 gallons per day for Wheaton College. He said Wheaton has its own
treatment plant, but it would be very costly for them to upgrade. Mr. Young said
they have run a model based on including that in our plant expansion. Mr. Azinheira
said the original plan had been for 1.5 million gallons per day, but that has been
reduced to 1 million gallons per day. He explained Mansfield's wastewater
expansion is mostly for infill rather than new development; most of new plant use
will be redevelopment rather than new large residential development. Mr. Feely said
if Wheaton is included, Norton's share will increase; Mr. Azinheira said that is true,
but each town determines how to pass the cost on within the community.
Mr. Azinheira said this work has to start soon or a moratorium will have to be placed
on sewer connections at some point soon. He said that would be counter to the
town's goals for commercial development and redevelopment. Mr. Trowbridge said
the delay is partly due to the agreement with the other towns not being signed. He
asked if the other towns can be eliminated from the plant; Mr. Young said those
towns own capacity in the plant, so they cannot be eliminated. Mr. Ross said the
alternative to the intermunicipal agreement may be for Mansfield to use the
additional capacity if the other communities do not want to pay for it. Mr. Azinheira
said one of the reasons for pushing the effluent discharge permitting is because of
the slow progress with the other towns. He said the current intermunicipal
agreement guides how the towns are charged based on the percent allocation of flow.
Mr. Ross said revolving funds have been used for this work, but noted that at some
point, that money will no longer be available. He said federal budget cuts and
increasing EPA regulations will also impact towns. Mr. Young said there are
significant cuts proposed to the federal revolving loan program at this time. Mr.
Azinheira said the long-term goal is to collect costs from future connections, which
would stabilize the rates.
2. Inflow & Infiltration (Wastewater Enterprise) $100,000
4;Ad�onru�uent , ,
Motion: To adjourn at 7:45 p.m. (Miller -Trowbridge) All in favor. PASSES