HomeMy WebLinkAboutConservation Comm. 10/23/2017t
Town of Mansfield RECEIVED
Conservation Minutes TOWN CLERKS OFFICE
October 23, 2017
1818 JAN Ib A002
Present: Michael Healey, Chair; Matthew Rieth; Aaron Roth; Ryan Maxwell; Katelyn Gonyer, Conservation and
Environmental Planner.
1. Meeting called to order at 7:00 pm.
f-tANSRIELD
MASSACHUSETTS
2. Sean Burke, Eagle Scout Project at Marie Streese Property: Mr. Burke explained he will be rebuilding the bridge on
the Marie Streese property, which is a woodland nature preserve located on Ware Street. He said the current bridge
is undersized, rotting, and unsteady and looks temporary; the new bridge will be wider and sturdier. Mr. Burke said he
has obtained full approval for the project and will be recruiting family, friends and other troop members to help with
this project; he said the materials will cost approximately $150.00.
Ms. Gonyer said Mr. Burke has spoken with Colin Cauldwell about the bridge design. she noted the current walkway is
old and no longer safe and the new boardwalk will be more permanent. She said Mr. Burke has done a great job with
the project and she will continue to work with him.
Mr. Roth asked if cedar or pressure -treated lumber would be used for the bridge. Mr. Burke said he will use pressure -
treated lumber. Mr. Roth said he was unable to walk out to the river because of the condition of the boardwalk; he
noted the area was very overgrown. He said signage should be added to the Conservation trails.
3. Request for Determination of Applicability: Yuriy Onyskiv, 2 Dario Way, Map 4, Parcel 116.
The RDA was filed for the construction of a second floor on an existing single-family house within 100 feet of Inland
Bank of Greenwood Lake.
Ms. Gonyer said she helped the applicant prepare the filing, which is for a second -floor on an existing single-family
home. She said she wants to be sure there is a limit of work on the back side of the property to delineate the work
area; she said silt fencing would be sufficient. She recommended with the new roof line that all roof runoff be
directed to drywells or stone trenches to prevent erosion to the lake from sheet flow off the roof. All disturbed areas
should be re -seeded as soon as possible.
Mr. Rieth asked about the deck, a portion of which is within the 25 -foot area. Ms. Gonyer said this is an existing deck
and no new footings would be allowed; she said her understanding was there would be no expansion of the existing
footprint. Mr. Healey said the scope of work mentions there will be some internal foundation work. Ms. Gonyer said
she will check on the footings and the reinforcement of the foundation.
Mr. Rieth made the motion to issue a Negative Determination for Reason #3, work will not alter the resource area, to
Yuriy Onyskiv, 2 Dario Way, Map 4, Parcel 116, for the construction of a second floor on existing single-family house
within 100 feet of Inland Bank of Greenwood Lake, plan, "Conservation Plan 2 Dario Way" dated June 21, 2017,
revised October 2, 2017, prepared by Hutchins -Trowbridge Associates, Inc., with the following Special Conditions:
• The Agent is to inspect the siltation control (per plan) prior to the start of work;
• All roof runoff must be directed to drywells or stone trenches to prevent erosion to the lake from sheet flow
from the new roof line;
• All disturbed areas are to be seeded as soon as possible;
• Erosion Control must remain until areas have been stabilized.
Mr. Roth seconded the motion. Motion passed 4-0-0.
Hearing ended at 7:23 pm.
4. Request to Amend an Order of Conditions: Paul Donovan, 17 Goose Lane.
Amend the Order of Conditions under DEP SE 211-0911 to include installation of an in -ground pool
Homeowner Paul Donovan was present
Ms. Gonyer said Mr. Donovan has been working with the Commission for almost five years. A Notice of Intent was
filed for regrading in the back portion of the lawn area with follow up plantings for mitigation without an Order of
Conditions. Two growing seasons have passed and all plantings are doing well. All conditions of the Order under DEP
SE 211-0911 were satisfied. Mr. Donovan requested an extension of the Order of Conditions in 2016 (extended to
November 20, 2019) because he wanted to do amendments to his property, including an in -ground pool with
associated apron and patio, regrading and a retaining wall, which would run up to the 25 -foot area. The pool will be
located on the right side of the yard.
Mr. Healey asked about the proposed retaining wall. Mr. Donovan said he would like approval for the future wall,
which would be 2-3 feet high and should be parallel to the 25 -foot zone. Ms. Gonyer said the retaining wall will
replace a large boulder wall and recommended the wall be added to the plan.
Mr. Roth made the motion to accept the amended plan, "DEP SE 211-0911 Amendment to Existing Order of
Conditions at Hse. No. 1 Goose Lane" dated October 16, 2017, prepared by RIM Engineering Co., Inc., with the
condition that the area to the south of the pool be left to re -naturalize along with a two -foot buffer strip at the limit of
Bordering Vegetated Wetland; the quantity and location of additional plantings will be determined in the field by the
Agent.
Mr. Rieth seconded the motion. Motion passed 3-1-0 (Mr. Maxwell voted no)
5. Notice of Intent: Joseph Lynch, 44 Cabot Boulevard, Map 44, Parcel 321. DEP SE 211-0970
The Notice of Intent was filed for the construction of a 60,000 square -foot warehouse with associated parking, utilities
and drainage within 100 feet of Bordering Vegetated Wetland, Isolated Vegetated Wetland and Inland Bank of pond.
Hearing was continued at the September 18, 2017 meeting.
Ms. Gonyer said she met in the field with John Rockwood, Eco -Tech, Inc., to review the wetland delineation and the
proposed plantings. Because there is a point where the entrance and some of the grading for the driveway would be
closest to the wetland, but still outside the 50 -foot buffer, a significant buffer strip was proposed with similar saplings
and under -story plantings for mitigation.
Ms. Gonyer met with Town Engineer Richard Alves and staff to review the project. A memorandum from Richard
Alves dated September 28, 2017 stated he had reviewed the Site Plan for "44 Cabot Boulevard" and Drainage Analysis
and the drawings and revisions (revision date September 27, 2017) have satisfied his outstanding comments.
Mr. Buckley presented the project to the Planning Board and the Zoning Board of Appeals and any changes have been
included in the most recent draft. Mr. Lynch noted the project received approval from the Planning Board and the
Zoning Board of Appeals.
Mr. Maxwell made the motion to issue an Order of Conditions to Joseph Lynch, 44 Cabot Boulevard, Map 44, Parcel
321, DEP SE 211-0970, with the following Special Conditions:
1. No work can be started until the Order of Conditions has been recorded with the Bristol County Registry of Deeds
and the receipt of the Order is returned to the Commission filled in by the Registry.
2. All work must conform to the plans dated August 8, 2017, referenced as "the plan of record" in this Order.
3. All limits of work and erosion controls shall be installed prior to any construction, clearing, or excavation. The
erosion controls shall consist of a 8" diameter biodegradable mulch -filled silt sock with wooden stakes every 10 feet
on each sides of sock or equivalent (do not pierce silt sock with stakes). In addition to the silt sock, trenched -in silt
fence may be required depending on the specific site conditions. See the Conservation Agent (Agent) for specific
erosion control design standards. The Applicant shall notify the Agent when any such devices or measures are
installed so that a site visit can be conducted prior to the commencement of work.
4. The Commission reserves the right to require additional mitigation or erosion control devices or measures if
mitigation or erosion control devices are not adequately installed or maintained on site.
5. The Applicant shall ensure that all demarcation (i.e. limits of work) and erosion control devices will remain in place
and be maintained throughout the construction process and until all disturbed areas are stabilized. Stabilization shall
be achieved once a complete vegetative cover is reached. Seeded areas shall be covered with a suitable protective
cover to allow the seed to germinated and become established. All side slopes greater than 3:1 (but less than 2:1) are
to be covered with jute mesh and seeded. At no point shall erosion occur resulting in sediment entering the wetland
areas. If erosion occurs, the Agent is to be contacted to review the extent of the erosion and determine follow-up
actions.
6. All roof runoff is to be directed in drywells or equivalent drainage components approved by the Commission. The
Commission or its agent shall review the locations of the drywells.
7. A construction sequence is to be submitted to the Commission prior to the start of work.
8. The Conservation Commission or its agent is to be notified of the starting date of the work prior to its
commencement.
9. Prior to the commencement of work, a pre -construction meet shall be held with the Agent, the Engineer and/or
Representative, and the General Contractor to review the Order of Conditions, scope of work and construction
sequencing.
10. The Applicant shall be responsible to ensure that all contractors on site during the construction have received and
reviewed the Order of Conditions and all plans of record.
11. Wetland flagging must remain in place until the project has been completed and the Certificate of Compliance
issued.
12. The Certificate of Compliance shall be requested in writing upon completion of the project. At the same time, the
applicant or any successor shall, upon completion of the project; submit an as -built plan and letter signed by a
professional engineer, certifying that the work has been done in accordance with the approved plan.
13. Any modifications or revisions to the plan(s) referenced in this Order must be submitted to the Commission for
review. For single family lots, this Order is for the structures shown on the plan of record only. Any additional
structures including, but not limited to, decks, patios, sheds, pools, walkways and/or any hardscape features must be
reviewed by the Commission. If, after their review, the Commission finds that the changes are not significant enough
(minor modifications) to warrant an Amended Order or new Notice of Intent, then the revised plans shall be
considered the new plan of record. If the changes are significant enough to warrant an Amended Order or new Notice
of Intent, then the applicant is required to file accordingly.
14. Signage for industrial, commercial or any large scale project:
Prior to receiving a Certificate of Compliance, the Applicant must install permanent "Environmentally Sensitive Area"
signs on the subject lot. The Applicant must install 12" x 18" metal signs on a permanent metal post. The quantity and
location of the sign are to be designated by Commission or the Agent on a case by case basis. Contact the
Conservation Department for signage details, sign vendors, and method of installation.
15. No synthetic fertilizer, herbicides, pesticides or fungicides can be used; only organic products may be used.
16. The replication area plantings shall be 75% successful within the first two growing seasons. If that is not the case
then recommendations for additional plantings shall be proposed to the Mansfield Conservation Commission. A Full
Certificate of Compliance cannot be issued until the two growing seasons have passed AND 75% survival rate has been
achieved.
17. All the terms and conditions set forth in the Stormwater Management Plan for (project title) prepared by
(Engineer), submitted on (date) are to be included with this Order of Conditions. All on-going O&M plan activities are
to be recorded as noted. All reports and checklist are to be submitted to the Commission as noted.
Mr. Roth seconded the motion. Motion passed 4-0-0.
Hearing ended at 9:05.
A]
6. New Business:
• Reorganization of Board: Will wait until there is a full board.
• Appointment of Open Space and Recreation Committee Members: Ms. Gonyer said the Selectmen have
established the five -member Open Space Committee, which will consist of two citizens at large and one
member each from the Planning, Conservation and Recreation Departments. Mr. Roth volunteered to serve
on the committee.
Mr. Rieth made the motion to appoint Mr. Roth to the Open Space Committee. Mr. Maxwell seconded the
motion. Motion passed 4-0-0.
7. Old Business:
• Eagle Scout -Sweets Pond Project update: Eagle Scout Nick DeLuca's project was to remove the fort that was
constructed along the bank of Sweet's Pond, north of the Otis Street ball fields. He also re -marked the red
trail with all new diamond markers. Ms. Gonyer said he did a fantastic job, doing more than was expected.
• Airport VMP Update: Ms. Gonyer said there has been a lot of activity with the airport vegetation
management. She has been on site for most of the work, working with Steve Riberdy, GZA
GeoEnvironmental, Inc. and GALE Associates. Phase I — Fruit Street is done and pictures were taken in the
Tracy Circle area, which was cut 3 years ago. She will now work with the Airport for several years to make
sure these areas do not become colonized with invasive species. Ms. Gonyer said work has now been started
in the area behind the animal shelter.
• Minutes: Mr. Rieth made the motion to approve the minutes of September 18, 2017. Mr. Roth seconded the
motion. Motion passed 3-0-1(Mr. Maxwell abstained).
• Update of town -wide active projects: Mr. Maxwell asked about Jewell Street; there has been no new activity.
Ms. Gonyer will follow up with all active sites to make sure they are stabilized for the winter months and will
update the board in November.
8. Adjournment:
Motion to adjourn at 9:24 pm. (Rieth/Maxwell) Motion passed 4-0.
Next meeting will November 20, 2017 at 7:00 pm in meeting room 3 A/B.
#mom s I
Michael Healey, Chair
J'L -18- 12
Date
il