HomeMy WebLinkAboutConservation Comm 09/18/2017Town of Mansfield
Conservation Minutes t [ 'xl
September 18, 2017 iio-,; f `'iii' P 1) FICC
16i() f3
Present: Michael Healey, Chairman; Christopher Marcheselli; Matthew Rieth; JACK S✓r�ritODavid
Hobaica; Aaron Roth; Katelyn Gonyer, Conservation and Environmental PIaJlnel I I
K
1. Meeting called to order at 7:00 pm. 113
2. Discussion:
Trevor Humphrey explained he has lived at 124 Dean Street for seven years and came before the
Commission to discuss his concerns about impacts to the Rumford River and Kingman Pond as a result of
activities that occur from the annual Duck Race; he was concerned about the ducks that travel to
Kingman Pond, broken ducks, flooding from Fulton Pond when the boards are pulled, potential wildlife
impacts to the fish and turtles, debris and the visible oil field on the pond from the roadway. He said
each year he has had to clean up the ducks and debris flushed down stream and noted the situation is
getting worse. He suggested using a secondary net and using more environmentally -friendly ducks. Mr.
Humphrey said the Rumford River is not ideally suited for the race and said other towns he contacted
use waterways used for canoeing.
Ms. Gonyer said they do not want to do the event on waterways with less of a flow because this would
cause more issues. She explained 30 minutes prior to the start of the race, boards are pulled by DPW
staff; the number of boards pulled depends on the flow in the pond at the time of the race. She said the
entire event lasts approximately one hour and 10-12 Park and Recreation staff members and volunteers
as well as 4 DPW staff members are in attendance before, during and after the race. She noted DPW
periodically pulls the boards because the river is meant to be flushed and flooded. Mr. Healey said, as
management of the pond, the eco -system needs to be flushed, which could disrupt fish, turtle and other
aquatic life. He noted only a small amount of ducks get through the net, considering 5000 ducks are
released.
Ms. Gonyer said the Parks and Recreation Department, volunteers and DPW staff do a very thorough job
of cleaning up the area, leaving the area in better condition than prior to the event. She said she would
attend next year's race and urged Mr. Humphrey to participate in the event.
3. Request for Determination of Applicability: Charles H. Curtis, 26 Potash Road, Map 38, Parcel 170.
Application is for the installation of retaining wall to level off rear portion of existing lawn within 100
feet of Bordering Vegetated Wetlands.
Homeowner Charles Curtis was present.
Ms. Gonyer explained the southwest corner of this lot slopes down toward the wetlands located at the
back of the property. She said Mr. Curtis would like to install a four -foot retaining wall and regrade the
area to bring the area up to the grade of the existing yard. She noted a landscaping plan "Curtis
Residence 26 Potash Road Mansfield MA" dated May 15, 2017, revised in the field on August 2, 2017,
prepared by Guerrini Landscape Inc., was submitted on August 14, 2017.
Mr. Healey asked Mr. Curtis if he knew what caused the depression at the back of the house. Mr.
Hobaica said the area was probably a stump dump and suggested test pits be done, but said it might be
better for the area to remain as is.
Mr. Marcheselli made the motion to issue a Negative Determination for reason #3, work will not alter
the resource area, to Charles H. Curtis, 26 Potash Road, Map 38, Parcel 170, with the following Special
Conditions:
• The Agent is to inspect the siltation control (per plan) prior to the start of work; location of
erosion controls to be determined by agent;
• Silt sock must be mulch. Silt sock may be 8" diameter (min.);
• All disturbed areas are to be seeded as soon as possible;
• Erosion Control must remain until areas have been stabilized;
• Homeowner should contact Agent if there is any alteration in plan or scope of work.
Mr. Roth seconded the motion.
Motion passed 6-0-0.
Hearing ended at 7:40 pm.
4. Request for Determination of Applicability: Kevin & Annette Dion, 153 Brown Avenue, Map 4, Parcel
104.
Application is for Title 5 septic system and drainage upgrade for a residential dwelling within 100 feet of
Inland Bank of Greenwood Lake.
Homeowner Kevin Dion was present.
Ms. Gonyer explained this is a Title 5 upgrade for an existing single-family house located approximately
55 feet from Greenwood Lake. The leaching field will be located in the front of the house with the
septic tank on the left side of the house. Erosion controls will be installed as per the plan "Conservation
Plan Septic Up -Grade at Hse. No. 153 Brown Avenue in Mansfield, MA" dated August 25, 2017, prepared
by RIM Engineering Co., Inc.
Mr. Hobaica made the motion to issue a Negative Determination for reason #3, work will not alter the
resource area, to Kevin & Annette Dion, 153 Brown Avenue, Map 4, Parcel 104 for Title 5 septic system
and drainage upgrade for a residential dwelling within 100 feet of Inland Bank of Greenwood Lake with
the following Special Conditions:
• The Agent is to inspect the siltation control (per plan) prior to the start of work;
• Silt sock must be mulch. Silt sock may be 8" diameter (min.);
• All disturbed areas are to be seeded as soon as possible;
• Erosion Control must remain until areas have been stabilized.
Mr. Roth seconded the motion.
Motion passed 6-0-0.
Hearing ended at 7:47 pm.
5. Notice of Intent: Joseph Lynch, 44 Cabot Boulevard, Map 44, Parcel 321. DEP SE 211-0970
Application is for the construction of a 60,000 square -foot warehouse with associated parking, utilities
and drainage within 100 feet of Bordering Vegetated Wetland, Isolated Vegetated Wetland and Inland
Bank of pond.
William R. Buckley, Jr., Bay Colony Group, Inc., John P. Rockwood, Eco -Tech, Inc. and Mr. Russell, owner
of the property, were present.
Mr. Buckley explained this project is for a 60,000 square -foot warehouse/flex building on a partially
vacant, 10.2 +/- wooded property, located on the southeast corner of Cabot Boulevard and Hampshire
Street. He said the activities within the buffer zone will include a small portion of the proposed building,
parking area and the truck area on the right side of the property. Mr. Buckley discussed the stormwater
management system, to include underground filtration in front of the building near the west entrance
and an above -ground infiltration basin located behind the truck loading area. Mr. Buckley said a buffer
zone enhancement area has been developed by Mr. Rockwood.
Ms. Gonyer met on site several times and has spoken with Richard Alves, Town Engineer, about the
project and she will review the drainage and grade issues with him. She suggested the hearing be
continued.
Mr. Buckley said he will be going before the Zoning Board of Appeals on September 26, 2017 and the
Planning Board on September 27, 2017. He will then modify and re -file the plans and hopefully, receive
approval.
Mr. Rieth made the motion to continue the hearing for Joseph Lynch, 44 Cabot Boulevard, Map 44,
Parcel 321, DEP SE 211-0970, to October 23, 2017.
Mr. Marcheselli seconded the motion.
Motion passed 6-0-0.
Hearing ended at 8:17 pm.
6. Amended Order of Conditions: Ronald & Susan Quintiliani, 41 Lakeview Avenue, Map 4, Parcel 53.
Request to amend Order of Conditions under DEP SE 211-0954 to include various landscape changes to
Plan of Record.
Homeowners Mr. and Mrs. Quintiliani were present
Ms. Gonyer explained this is an active Order of Conditions issued on May 10, 2016 to Mr. and Mrs.
Quintiliani for the razing of an existing house and the construction of a new single-family house with
expanded patio and deck. She said the construction of the house is complete but they are now dealing
with final landscaping issues. She met on site at the end of June; minor changes were made in the field
with the patio area and the location of a shed, which she discussed with Mr. Healey.
Ms. Gonyer reminded the Commission the Order of Conditions stipulated the yard area on the north
side of the property was to be terraced to minimize the velocity of sheet runoff to prevent erosion and
3
scouring between 41 Lakeview Avenue and 37 Lakeview Avenue. She noted Mr. Quintiliani decided not
to replace the entire retaining wall, only the northerly portion.
Ms. Gonyer requested an Amended Order of Conditions be filed because of the side yard area and
retaining wall issues; Ms. Gonyer said if the area on the north side between the new house and 37
Lakeview Avenue is terraced, there will be no access to the propane tank and air conditioning unit. Ms.
Gonyer said this area is stabilize but is level and there are concerns there might be water issues. Instead
of terracing, a depression area will be added between the two houses at the driveway to catch run-off.
A knee wall with stone in front will be installed at the rear of the house; Ms. Gonyer believes this will be
sufficient. The south side of the wall will be resurfaced and the entire wall will be re -capped. The
concrete at the front of the wall will be cleaned up and any cracks in the wall will be repaired; the
damage to the wall was caused from trees and stumps and the owner would like to remove the trees to
alleviate further damage to the wall once the wall is repaired. She said the patio area will now be
cobblestone.
All work will be completed within a couple of days and Ms. Gonyer asked to be notified prior to the start
of work. Ms. Gonyer said the changes to the plan will not cause more of an impact and the work will be
no closer to the resource area.
Mr. Marcheselli made the motion to issue the Amended Order of Conditions under DEP SE 211-0954 to
Ronald & Susan Quintiliani, 41 Lakeview Avenue, Map 4, Parcel 53 to include the various landscape
changes shown on the site sketch "DEP SE 211-0954 Request for an Amended Order of Conditions for
Hse. No. 41 Lakeview Avenue in Mansfield, MA dated August 28, 2017, prepared by RIM Engineering
Co., Inc.; the landscape site sketch shall be included as part of the Plan of Record.
Mr. Hobaica seconded the motion.
Motion passed 6-0-0.
Hearing ended at 8:40 pm.
7. New Business:
• Land Maintenance
o Intern and NRT: New intern Elyse Tripp reviewed and listed by priority the issues with
open space areas presented to the Commission by Colin Cauldwell and Lou Andrews at a
previous meeting.
o Ms. Gonyer received confirmation from Natural Heritage & Endangered Species
Program that the 3 vernal pools Sarah Meadows surveyed have been certified.
o Mill Pond Canoe Launch: This is a project to provide easier access to the pond and
conservation land.
o Streese Property Boardwalk: A boy scout will come before the Board to talk about
adding a boardwalk in this area.
o Open Space Committee: The Selectmen have established a five -member open space
committee.
2
• Update Regulations: By -Law Updates/revisions were done in 2015 and now the Rules and
Regulations need to be revised to support the new By -Law.
• Reorganization of Board: Mr. Hobaica made the motion to have Mr. Healey continue as Chair.
Mr. Roth seconded the motion. Motion passed 6-0-0.
The position of Vice -Chair will be decided once there is a full board.
8. Old Business:
• Acceptance of Cabot Pond Parcel- Walsh: Mr. Roth made the motion to accept the Quitclaim
Deed for Mansfield Willowdale Estates, LLC, Parcel B, located off Willow Street. Mr. Smith
seconded the motion. Motion passed 6-0-0.
• Minutes: Mr. Rieth made the motion to approve the July 24, 2017 minutes as written. Mr.
Smith seconded the motion. Motion passed 4-0-2 (Marcheselli/Hobaica abstained).
9. Adjournment:
Motion to adjourn at 9:02 pm — (Hobaica/Roth). Motion passed 6-0-0.
Next meeting will be October 23, 2017 at 7:00 pm in Meeting Room 3 A/B.
Axw T nom,' /0 -23-12
Michael Healey, Chair Date
5