HomeMy WebLinkAboutConservation Comm 07/27/1981MANSFIELD CONSERVATION COMMISSION
MONDAY, JULY 27, 1981
' Members Present: Chairwoman Dianne Royle, Co
Jane Sheehan, Stuart Sweet
Minutes:
INUTESr
�
PGE 0 �1 2519'
Paul Boy
MOTION: To accept the Minutes of July 13, 1981 with corrections.
(Boyden - Sweet; all in favor) VOTED
Correspondence:
1. July 24, 1981 letter from De Leuw, Cather/Parsons enclosing
a check in the amount of $34.93 in payment of advertising
fees incurred in connection with the Wetlands Protection Act
Hearing for the Northeast Corridor Improvement Project of the
Federal Railroad Administration.
MOTION: To forward this check to the Mansfield Press and to
issue a one-year extension for work on the Northeast
Corridor Improvement Project (File No. SE211-64).
(Sheehan - Sweet; all in favor) VOTED
2. Copy of July 13, 1981 letter from the Mansfield Board of
Selectmen to Judith Pickett, Counsel for Conservation Law
Foundation, supporting the Conservation Commission's concern
regarding the presence of sodium ferrocyanide in the road salt
used throughout the State.
3. July 16, 1981 letter from Planning Director Folkman accepting
the Commission's invitation to discuss wetlands mapping with the
Commission.
4. Request for payment of annual dues to the Conservation Law
Foundation.
MOTION: To pay the $30 annual dues to the Conservation Law
Foundation.
(Sheehan - Sweet; all in favor) VOTED
Willis Pond: A Wetlands Protection Act Hearing was held for this
project (File No. SE211-77) at 8:00 PM. A summary of this hearing
is filed separately; a tape of the hearing is also on file with the
Town Clerk.
Paul Folkman - Wetlands Mapping: Planning Director Folkman showed
the Commission a 1" = 600' map of Mansfield to illustrate the scale
to be used in all the mapping being provided by Whitman & Howard for
the Water Resource study they are conducting for the Town. Since
wetlands mapping is not included in the contract with Whitman &
MANSFIELD CONSERVATION COMMISSION
MONDAY, JULY 27, 1981
MINUTES
PAGE TWO
Howard, Planning Director Folkman has sought professional advice
and estimates for such wetlands mapping. Mr. Folkman pointed out
that while this scale will not provide an indication of backyard
wetlands, it will give the Commission a generalized pattern of
wetlands in Town. Com. Boyden agreed and added that at a later
date the Commission could, perhaps, have more detailed mapping
of "problem" areas in Town. The Town Planner indicated that savings
could be realized on the job, which is estimated to cost between
$2,500 and $4,500, in the information gathering step (Mr. Folkman
suggested that he might be able to track down the needed maps in
Boston.) and the printing of the finished product (SRPEDD might
be able to provide this service.).
MOTION: To request Town Planner Folkman to go forward with his
investigation into (1) having wetlands mapping of Mansfield done
at a scale of 1" = 600' in the most economical fashion; and
(2) acquiring the cash to pay for such wetlands mapping and
to request Town Planner Folkman report back to the Commission
on his findings.
(Boyden - Sweet; all in favor) VOTED
Penn Central Real Estate: Chairwoman Royle reported that a newspaper
article had alerted her to the fact that a third parcel of land is
being offered to the Town by the Penn Central Railroad and that
the Board of Selectmen has indicated an interest in having the
Conservation Commission provide the funds for the purchase of this
land as a possible well site. Town Planner Folkman, speaking unof-
ficially, explained that while the two parcels in which the Commission
has already expressed an interest have not been officially
offered to the Town, this third parcel has been so offered and requires
an indication of interest by July 28. It was decided that since the
Commission had not been approached by the Selectmen concerning such
a purchase, nothing should be done short of indicating the Commission's
displeasure at receiving such information via the media.
MOTION: To schedule an on-site inspection of the remaining two
parcels of land which the Penn Central is interested in
selling for Thursday evening, August 13, 1981, at 6:15 PM.
(Sheehan - Sweet; all in favor) VOTED
Stearns Avenue - Tree Cutting:
MOTION: To send a letter to Edward Stivaletta informing him that
the trees felled in the swampy area between Erick Road,
Stearns Avenue, and the Fouracre property constitute a
wetlands violation and requesting him to remove these trees
and inform the Commission when the task has been accomplished.
(Boyden - Sweet; all in favor) VOTED
r�✓
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JULY 27, 1981 PAGE THREE
Bonney Lane: Com. Boyden reported that this was, indeed, an "as
built" plan for Bonney Lane.
MOTION: To send a memo to the Board of Health requesting a copy
of the as -built plan for Bonney Lane together with the
variance number granted by the Board of Health for this
work.
(Boyden - Sheehan; all in favor) VOTED
Highland Avenue - Tree Cutting: Chairwoman Royle reported that
Sandra Smith, Grossman Co., informed her that Thomas Withee has
agreed to clean up the debris left on this property in the wake of
his tree cutting and that she will contact the Commission upon
the completion of the clean-up in order that the Commission might
make an on-site inspection.
Kelton Potter - East Street: Chairwoman Royle reported that Town
Counsel Mulcahy suggested that since he has contacted Mr. Potter's
attorney regarding the scheduling of a meeting among the various
interested parties, it would be wise to await a response from the
lawyer.
Peter DeGirolamo - East Street:
MOTION: To send a letter to Mr. DeGirolamo reminding him that two
months have elapsed since he agreed to remove the brush
encroaching on the Canoe River wetlands and requesting
that he notify the Commission by August 17, 1981 regarding
the status of this project.
(Sheehan - Sweet; all in favor) VOTED
Leon Grant - Pond Development:
MOTION: To grant Leon Grant a 90 -day extension of this Order of
Conditions (File No. SE211-52) for the sole purpose of
restoring the buffer zone between the pond and the Goddard
property as indicated on the plan, stipulating that four
stakes shall placed to indicate that this buffer zone is at
an elevation of 117' and that no material shall leave the
property until the restoration has been accomplished to the
satisfaction of the Commission.
(Sheehan - Boyden; all in favor) VOTED
Mansfield Little League: Com. Sweet reported that in response to an
alert by Associate Commissioner Rys, he inspected the West Mansfield
Little League complex and found that things do not appear to be
going along as had been expected. Chairwoman Royle suggested that
she call Richard Ryan and request a written up -date on this project.
MANSFIELD CONSERVATION COMMISSION
MONDAY, JULY 27, 1981
MINUTES
PAGE FOUR
Adjournment:
MOTION: To adjourn this meeting at 10:53 PM and to schedule the
next Commission meeting for Monday, August 17, 1981.
(Sweet - Boyden; all in favor) VOTED
Accepted By I0lab"t, -6
J�—:
Date to Ton Clerk F, - - -V
WETLANDS PROTh JN ACT HEARING SUMMARY
FILE NO. SE211 /--WILLIS POND
APPLICANT: Allen L. Willis, Jr.
HEARING DATE: Monday, July 27, 1981 at 8:00
LOCATION OF PROJECT: South of Willow Street
PURPOSE OF PROJECT: To excavate a 4.57 -acre
�leewe%r/(
BN-LOMMI S S IOt
Fin
pond --Willis Pond
Allen Willis, who was accompanied by Chris Yarworth of RIM Engineering
made a brief presentation and then. opened the meeting up to questions.
Mr Willis noted that since the Commissioners had made an on-site
inspection of his proposed pond, they were familiar with the location
of the project. As a point of information, Mr. Willis explained that
despite the controversy regarding whether or not this is a pond
restoration, since he had filed a Form A Plan before the Bylaw
regarding pond development was voted in, he has every legal right to
dig this pond.
Size of Pond: 4.57 acres
Total Area of Land on which Pond
Flushing Rate: 280 times/year
Elevation of Bottom of Pond: 90'
Depth at Center of Pond: 26 feet
Volume of Pond: 74,534 cu. yds.
is to be Situated: 10.5 acres
or 15,093,135 gal.
The method of excavation proposed will be to pump the Rumford River
through a sedimentation basin, into a temporary channel, and then
back to the usual course of the River. Thus, the loaders and trucks
will be able to carry out the task in the dry. The brook that enters
the site from under Willow Street will be rerouted in a similar
fashion. When Chairwoman Royle observed that this project would
probably fall within the jurisdiction of the Army Corps of Engineers,
Mr. Willis stated that this project had already been filed with the
Corps. The berm of the temporary channel is designed to overflow
in case of a flooding situation. The work is to begin at the lower
end of the site and will progress up toward Willow Street.
In response to Com. Sheehan's concern regarding the possible
effects of this project on the Rumford River, Mr. Willis explained
that the only change will be an increase in flood storage. Mr.
Willis noted that he is adding the mitigation of providing more
wildlife habitat to the pond area by retaining the existing topography
at the north and south ends of the pond while on the east and west
sides, he will grade right into the 5:1 and 3:1 slopes as is usual.
There will be a 50 -foot buffer zone between the pond and the Andrews'
property. Only one access road is proposed --at the south end of the
property with traffic probably entering Willow Street via the gravel
pit exit.
Mr. Willis outlined his time schedule for this project as follows:
he will begin work as soon as his portion of Cabot Pond has been
completed and the project should take not more than one year to
complete. Mr. Willis mentioned that he will stop digging if and when
HEARING SUMMARY
FILE NO SE211-77
he hits ledge (no blasting to be employed) with a minimum depth
for the pond of 12 feet.
At this point, Chairwoman Royle opened the meeting to questions
from the audience. Mrs. Jellinek suggested that Com. Boyden
should excuse himself from this hearing because of a possible
conflict of interest because of his pond development project in
Norton. Mrs. Jellinek also observed that Mr. Willis had not
justified this project other than for economic reasons.
Chairwoman Royle pointed out that Mr. Willis had mentioned that
his prime motive was for aesthetics.
The hearing closed at 9:17 PM.