Loading...
HomeMy WebLinkAboutConservation Comm 04/26/1982MANSFIELD CONSERVATION COMMISSION MONDAY, APRIL 26, 1982 PA adYB Members Present: Chairwoman Dianne Royle, Coms. Ronald Bonvie`�` (arrived at 10:30 PM), Paul Boyden (arrived at 8:15 PM), Anthony Durbano, Keith Johnson, Stuart Sweet, Doris Webb (arrived at 8:00 PM) Due to a Downtown Advisory Committee reception, the meeting was convened in the Assessor's office. Town Manager Maurer - Willow Street Water Main Project: Town Manager Maurer explained that in order to follow correct decision making policy, he had not accepted delivery of the Commission's April 12, 1982 memo approving two changes requested by Allen Willis in the Willow Street portion of the Town's water main replacement program. Rather, Mr. Maurer requested that (1) Mr. Willis meet on site with Whitman & Howard to review his requests; (2) Mr. Willis submit a letter to the Town outlining his requests as discussed with Whitman & Howard; (3) Whitman & Howard discuss these changes with the contractor; (4) the contractor and Whitman & Howard submit their recommendations to the Town together with any costs anticipated in connection with these changes. After these steps had been completed, Town Manager Maurer presented the Conservation Commission with a packet of materials, including his letter recommending that the culvert iden- tified as Item No. 5 on Sheet 4 of the contract drawings be relocated a few feet westerly of the existing location and that the culvert identified as Item No. 8 on Sheet 4.of the contract drawings be lowered by a maximum of one (1) foot below the proposed elevation on the plan to an inflow grade of 119.5 and an outflow grade of 119.0. Mr. Maurer explained that his first recommendation will allow the contractor to install this culvert in the dry and his second recommendation of a one -foot lowering of the culvert, as suggested by Whitman & Howard despite Allen Willis' request for a lowering of 1.5 - two feet, should insure sufficient coverage for the water pipe. Robert Chavaree, who was present during the Town Manager's presentation, stated that the 122' elevation of Cabot Pond will be maintained, to his knowledge, by riprap rather than flash boards. Com. Webb arrived at this time. Salt Storage Shed: Town Manager Maurer assured the Commissioners that his office is vitally concerned with the possible hazard to the water supply posed by the salt storage shed adjacent to the Highway Garage. He pointed out that (1) the Town no longer purchases salt containing sodium ferrocyanide, despite the caking difficulties encountered; (2) the sand/salt mixing area has been paved; (3) attempts have been made to keep the salt covered; (4) plans to build a salt storage shed at the sewerage treatment/landfill site MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, APRIL 26, 1982 PACE TWO (not in an aquifer area) are being discussed --the timetable for such a facility to be tied to the construction of the sewerage treatment plant; (5) Samples taken by Health Agent Walsh indicate that while -all our wells are experiencing increased sodium levels, statistically both in amount of road salt used and amount of sodium present in our water, Mansfield is on the lower end of the State spectrum. The Town Manager stated that he feels that the salt storage shed does not require the approval of the Conservation Commission or a Wetlands Protection Act Hearing. Com. Boyden arrived at this time. Mrs. Jellinek quoted from Mass. DPW literature which states that (1) salt storage sheds should not be located within a public water supply water shed; (2) snow which has been treated with salt shall not be put into a sanitary landfill because it could enter the groundwater; and (3) DEQE should be notified if a town uses more that one ton of salt per year. West Mansfield Little League Complex: In attendance: Fred Rys, Commission's liaison for this project Richard Ryan, Chairman of Little League Construction Committee Jeffrey Long, Chairman, Recreation Commission Don Arduino, Little League Vice President Donna Soldoni, Little League Treasurer Dan Converse, Margaret Heckler's liaison with the Army Mr. Ryan assured the Commissioners that the specific damage about which the Commission was concerned (dirt pushed against a large pine tree and portions of a stone wall knocked down) will be repaired. The project schedule is a more difficult matter. Mr. Ryan explained that the Little League is committed to have the Army complete their portion of the entire project (grading and redistributing the loam) as originally planned because (1) the Army is providing $60-70,000 worth of services for free and (2) if the project is attacked in a piecemeal rather than a total fashion, the fear is that the Army will pull out after one portion is completed. As soon as the Army has completed its tasks, the area will be air raked and seeded. The most optimistic target for this would be next fall. Mr. Converse explained that dealings with the Army have been difficult since not only has the policy toward community service projectschanged but the personnel who made the initial commitment has also changed. This project, which the Army now claims is rather ambitious for a training exercise, is the only community service project the Army has underway in the State. Chairwoman Royle expressed the Commission's distress at the seemingly needless disturbance of areas not included in the MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, APRIL 26, 1982 PAGE THREE project. Mr. Converse suggested that the Army's commitment may not presently be a full commitment as far as equipment and personnel are concerned. MOTION: To send a letter to the Army (under cover with a similar letter from Congresswoman Heckler) expressing the Commission's concern with the duration and execution of this project. This letter will be sent when the Commission receives from Mr. Converse .the address and Con resswoman Heckler's letter (Sweet -Boyden; all in favor VOTED Shepard/Nelson Pond Development Project: Ralph Maloon presented the Commission with a Notice of Intent dated April 26, 1982 for this project. There was some discussion concerning the completeness of the filing (Mr. Maloon agreed to include the bottom and area of the pond in the plans brought to the hearing.) and the accuracy of the stated purpose of the project. MOTION: To accept the Notice of Intent as submitted by Messrs. Shepard and Nelson. (Webb - Johnson; in favor: Durbano) Johnson, Royle, Webb; opposed: Sweet; abstained: Boyden VOTED The hearing was set for Monday, May 10, 1982, at 8:00 PM. - 1�L, �11�VLP,vevelopment Corp • Mr. Bedrosian, repre- senting the corporation which represents the Sheraton Mansfield, shared with the Commission'' Incorp's concept for a lower priced hotel, also in the Cabot, Cabot & Forbes Industrial Park, visible from the relocated Route 140 and accessible from Forbes Boulevard. The proposed 130 -room, five -story hotel will include two small meeting rooms and a restaurant/lounge as well as a swimming pool. The hotel is to be built on two and one-half acres of a six -acre parcel situated in Mansfield and Foxboro. Excavation plans include digging down about three feet, filling to provide solid ground for the building and adding an additional two feet above the existing grade to have additional flow for town sewerage. Cabot, Cabot & Forbes has already had a Wetlands Protection Act Hearing for a retention area to serve this site. The Commissioners expressed grave concern with the filling of two and ore -half acres of wetland required by this project. Com. Bonvie joined the meeting at this time. Margaret Lewis - 432 Fruit Street: Chairwoman Royle read copies of Tetters from Town Manager Maurer to the Board of Health and from the Board of Health to the Town Manager concerning Mrs. Lewis' complaint. Mrs. Lewis contends that in 1977 Franklyn Allen broke down a 25 -foot length of her stone wall, dug 15 1/2 inches of loam off her land, and blocked her brook, thus flooding her land. *At this time, the meeting moved to the usual meeting room. MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, APRIL 26, 1982 PAGE FOUR An on-site inspection is scheduled for Thursday, May 29, 1982 at 6:00 PM. Correspondence: 1. April 26, 1982 memo from Town Manager Maurer regarding salt storage shed together with informational materials. Com. Sweet took this to study and report on at the next meeting. 2. April 26, 1982 memo from Town Manager Maurer regarding changes in Willow Street portion of water main replacement program and related material. MOTION: To send a letter to Town Manager Maurer approving the two adjustments in the Willow Street project as outlined in the Town Manager's memo of April 26, 1982 and approved by the Board of Selectmen on April 21, 1982. (Johnson - Webb; all in favor) VOTED (Both Town Manager Maurer, who had returned to the meeting at this time, and Allen Willis, who joined the meeting after it changed its location, commented briefly on these changes.) Adiournment: MOTION: To adjourn this meeting at 11:05 PM Accepted bQl'rAJ,�&L Date to Town Clerk i/-9'•' pem