Loading...
HomeMy WebLinkAboutConservation Comm 04/10/1985MANSFIELD CONSERVATION COMMI& WEDNESDAY, APRIL 109 1985 MINUTES PAGE ONE Members Present: Chairman Durbano; Commissioners Bonvie, Graham, O'Neill and Sweet The meeting was called to order at 7:35 p.m. Correspondence 1. Three memorandums from Joseph Mannarino, Planning Director to the Commission concerning review of subdivision plans for Mansfield Manor Estates, Chambers Court and Westview Woods. 2. National Wetland Assessment Symposium to be held June 17-20 in Portland, Maine. 3. Letter from the Metropolitan District Commission concerning the upcoming Commonwealth's Earth Day celebration at the Hatch Memorial Shell on May 4. 4. Statement of Expenditures for March 1985- 5. Cooperative Extension Service Workshop, "Woodland Dollars and Sense." 6. Massachusetts Housing Finance Agency newsletter for March. 7. Department of Environmental Quality Engineering Hazardous Waste Update. 8. Memo from Joseph Zeneski, DPW Director requesting a representative from the Conservation -Commission to serve on an Ad Hoc Advisory Committee for DPW Studies. 9. Voucher for Barbara Williams for 31)z hours from March 3 — April 10. MOTION: To pay. (O'Neill—Sweet; all in favor) VOTED 10. Notice of Intent from Ann Javitch for Tremont Street. A Wetland Hearing will be held on April 29, 1985• Elm Street Gravel Pit Chairman Durbano received a telephone call from Mr. St. Don stating a party is going across town property and operating's gravel pit. The gravel is being taken out. of the pit crossing wetlands on town land to remove. A Cease and Desist Order was issued by Bert Cook, Building Inspector to Mr. Bob Bernell. Members of the Commission will inspect the site Saturday, April 13. MANSFIELD CONSERVATION COMMISSION WEDNESDAY, APRIL 10, 1985 Articles for Town Meeting `}}I�CL�IJ�YIL MNr- AY 2;985 L985 ETTWO � ) An Article was submitted at Town Meeting sponsored by the Conservation Commission to raise and appropriate or transfer from available funds such sums of money as may be necessary to establish a fund for maintenance and rehabilitation of the Town's rivers and streams. Chairman Durbano mentioned that there is apparently not enough money in the budget for this project. Therefore, the following motion was made: MOTION: To withdraw the request for money for stream cleaning. VOTED (Bonvie-Sweet; all in favor) Determination of Applicability Ronald S Bonvie, Ware Street Mr. Bonnie proposes a dwelling, septic system and grading within 100 feet of a Bordering Vegetated Wetlands. The wetlands on this site are part of the Windchi.mes Subdivision. Proposed grading is 25 - 30 feet from the wetlands. Haybales shall be placed along the wetlands, and the ditch on site will not be touched. A Negative Determination No. 2 and No. 3 was made. The plan submitted, dated March 169 1985, shall be the basis for all work done in this area. NOTION: To make a Negative Determination No. 2 and No. 3. VOTED (Sweet -O'Neill; all in favor) Commissioner Bonvie did not participate in the meeting for a Determination. Order of Conditions - SE211-125 The lgoderick Cor oration - Riverside Drive 1. This Order of Conditions shall become null and void if the recorded receipt on this Order is not received by the Conservation Commission within (14) fourteen days after the appeal period has expired. If said receipt is not returned to the Conservation Commission, a new filing shall be required. row 2. shllced in a onoLothA atnortherly the existing 128 elevation. 3. No fertilizers, pesticides or hazardous materials shall be r utilized anywhere on lots under our jurisdiction. 4. Haybales shall be placed as depicted on plan at the end of the outfall. MANSFIELD CONSERVATION COMMISSION WEDNESDAY, APRIL 10, 1985 MOTION: To accept the as written. (Sweet-Bonvie; Review of Subdivision Plans Order of Conditions all in favor) MINUTES PAGE THREE VOTED Chambers Court and Westview Woods? as submitted, would not need a hearing. The Conserva ion Commission feels these two areas are in the well recharge area and concern should be exercised. Manor Estates - It appears apparent that construction will be within 100 Net of the Back Bay Brook. Some work may take place within the 100 -year flood plain. A Wetlands Hearing will be required. MOTION: To adjourn at 9:10 p.m. (Sweet -Graham; all in favor) VOTED The next meeting of the Conservation Commission is Monday, April 29, 1985. Approved by: Date to Town bjw