Loading...
HomeMy WebLinkAboutConservation Comm 11/04/19851,1ANSi:IELD COE; ;EVVATION COFII1I6 M011DAY, idOVEF13EIR 4, 1985 hINUTE:1 PAGE OT'<E Members Present: Chairman Durbano, Commissioners m ahoney, O'Neill and Ouellette The meeting was called to order at 1):32 p.m. Correspondence 1, Request made by Mary and Martin Cahill and Mrs.4alter Souza for an Adjudicatory Hearing on the Superseding Orders of Condition for wile No. 31" 11-121 (Douglas Titus, East Street). 2. October 23 letter from State Representative 14illiam Vernon concerninir t'_�e Norton Reservoir clean --up program. 3. October 30 letter from Attorney Geoffrey A. Domenico, representing Richard Curley of 13 'vdebster Street, iiansfield regarding the Day-Blandori Subdivision, Webster Street. 4. Supersedin? Jrder of Conditions for Douglas L. Titus, Last Street, File i'o. 8d211-129. 5. Site Plan 2eviesas. 6. Massachusetts Recreation and Park ;association State Conference information. 7. Planning 3oard Minutes of October 5, October 9 and October ! , 1985. 8. Request for a Determination of Applicability submitted by Dunn Engineering for Old South Plain Street. 9. Abbreviated :;otice of intent from Bert Cook, Gilbert Street. iVetland Protection Act Hearing - 3E211-145 William Eager, 'Test Street The 'Wetland Protection Act Hearing on the Notice of Intent dated October 2, 1985 opened at 8:00 p.m. Mr. Eajer proposes to remove materials wit't;in 100 feet of Greenwood Lake and clean up beach area. lie would like to remove stumps, debris and some muck up to and not beyond the water's edge and put down sand. !,ir. Eager stated .e would place haybales along edge of water, and would eventually be plantin? grass. Chairman i)urbano mentioned to Mr. Eager he would prefer to see him remove all the muck until the gravel is reached. Mr. 3a Ter felt the cr:jvel will be reached at about one foot. The ;t;airrian also mentioned that the material removed s',o?ald be storec a :ayfrom the ,r ter. MANSFIELD CONSERVATION COMMISSION 1,11NUTcS MONDAY, NOVEMBER 4, 1985 PAGE T'eVO The hearing closed at 8:10 p.m. The Order of Conditions will be written within 21 days, all fees have been paid. This hearing was continued from October 21, 1985. James Vadala Mr. James Vadala, 1264 East Street submitted an Abbreviated Notice of Intent to the Commission for his proposal to remove storage materials from an area subject to protection under the Wetland Protection Act. Mr. Vadala is to submit plans to the Commission at the time of the wetland hearing on November 18. Site Plan Reviews The Commission agreed no additional review would be required for plans of the proposed townhouses on Rumford Avenue and the proposed apartment building on Park .:street. Request for a Determination of Applicability Pasco Construction - Fruit .Street Air. Anthony Pasqualino, ?resident, Pasco Construction proposes to construct homes and grade within 100 feet of a Bordering Vegetated Wetland. Lot 32 will have a house with attached garage; Lot 31 will have a house only. Any poorly drained soil within 40 feet of proposed i:ouses is to be removed and replaced with suitable gravel. Plans are to dig out basements and grade only. Houses will be on town sewer. r. Pasqualino mentioned that about 20 years ago a 1 foot by 2 foot trench was built leading toward the river thus resulting in the wetland area today. Members of the Commission agreed Pasco Construction would not have to file a Notice of Intent for the p?oposed work. MOTION: To issue a Negative Determination No. 3 and stating haybales to be placed along Poorly Drained Soil Line. (Ouellette -O'Neill; all in favor) VOTED Order of Conditions - 13E211-142 Evelyn I. Allen - Fuller Estates 1, Lots 16 and 17 shall require an additional filing for any work within 100 feet of a wetland. 2. Appropriate siltation control shall be placed along the wetland line. i 3. Rip -rap shall extend 20 feet from the end of tie pipe and flared to a width of 10 feet across. MANSFIELD CONSERVATION COMMISSION MONDAY, NOVE14BE-R 4, 1985 MINUTES PAGE THREE 4. Developer shall maintain responsibility of the oil/water separator until such time the roadway has been accepted by the town. 5. Appropriate siltation control shall be placed at the outfall of the drainage pipe prior to, and maintained throughout construction. 6. The earth berm on Lot 36, Westhaver Farms Subdivision (File No. SE211-143), shall be constructed prior to work commencing on Fuller. Estates Subdivision. MOTION: To issue as written. (Mlaboney-O'Neill; all in favor) Order of Conditions - SE211-143 Evelyn I. Allen - Westhaver Farms 1. Lot 36 shall not be utilized as a house lot. 2. Any construction on Lot 34 shall be reviewed by the Conservation Commission. 3. Last 10 feet of stone rip -rap shall be flared out and flattened, and shall end at a width of 15 feet. VOTED 4. Appropriate siltation control shall be placed along edge of all wetlands per plan. 5. The earth berm on Lot 36 shall be constructed prior to work being done on Westhaver Farms per detail on Page 7 of Plan dated Revised August 7, 1985. 6. The excavation of the compensatory storage area shall be done prior to construction of subdivision. 7. Any work done on Lots 12, 13, 14, 15, 33, 34 and 35 within 100 feet of a wetland shall require an additional filing with the Conservation Commission. 8. The oil/water separator shall be maintained by the developer until such time the roadway is accepted by the town. 9. The notch and the berm shall be maintained by the developer until such time the town accepts the easement. MANSFIELD CONSERVATION COMMISSION MONDAY, NOVEMBER 41 1985 MINUTES PAGE FOUR MOTION: To issue as written. (O'Neill -Mahoney; all in favor) VOTED Mr. Paul Folkman Mr. Folkman came before the Commission to discuss plans Mr. William Haynes, Hatheway and Patterson proposes for plant expansion. Plans will be prepared for the Conservation Commission. At present, site plans are being prepared for the Planning Hoard, and Mr. Folkman wanted some input from the Commission. Chairman Durbano told Mr. Folkman that up to 5,000 sq. ft. of wetlands can be filled, with compensation for the amount filled. The only exemption is a roadway. Proposed plans do not involve a roadway. Proposal is to construct buildings and a storage area. Order of Conditions - SE211-144 The Bonwood Company - Austin Farms 1. Any work within 100 feet of a wetland on Lots 1, 2, 31 4, 5, 6, 7, 81 91 10, 11, 12, 13, 14, 15, 16, 1'%1 18, 21, 221 23, 24, 25, 26, 27), 28, 291 30, 31, 33, 35 and 36 shall require an additional filing with the Conservation Commission. 2. Drainage outfalls shall be constructed with 6 -inch stone to a length of 10 feet and shall end at a width of 10 feet. 3. The outfall of the box culvert shall be rip -rapped for a length of 10 feet with 10 -inch stone. 4. Any construction adjacent to a wetland shall have appropriate siltation control. 5. Maintenance of the oil/water separator shall be the responsi- bility of the developer until such time the roadway has been accepted by the town. 6. A detailed plan shall be submitted to the Conservation Commission for their approval for the stump dump on Lots 14 and 15. MOTION: To issue Orders as written. (Mahoney -O'Neill; all in favor) VOTED MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, NOVEMBER 41 1985 PAGE FIVE Cobb Street Chairman Durbano stated Town Manager Rande Wilson, Board of Selectmen Chairman Richard D'Onofrio, Town Counsel John Dwyer, Karl Clemmey and his attorney met recently to discuss the situation on Cobb Street and Mr. Clemmey's blocking of the Back Bay Brook. At that time, Mr. Clemmey was told to produce evidence that the town trespassed on his property. Town Counsel suggested the Conservation Commission issue a Cease and Desist Order, however, Chairman Durbano felt the Commission would be unable until ownership of the land has been clarified. MOTION: To issue a Cease and Desist Order once the ownership of the property has been clarified. (Ouellette -Mahoney; all in favor) VOTED As a result of this discussion, Commissioner Ouellette suggested on further inspections that photographs be taken. Members agreed this was a good idea. MOTION: To adjourn at 10:25 p.m. (Mahoney -Ouellette; all in favor) VOTED The next meeting of the Conservation Commission is November 18. Approved by: L4,: Date to Town Clerk: / �Z ` /% p' bjw