2. Request for Certificate of Compliance: Craig Cygawnoski, RIM Engineering Co., Inc., 39 Lantern Lane, Map
15, Parcel 146.
Craig Cygawnoski, RIM Engineering Co., Inc., and homeowner Michael O'Brien were present.
Ms. Gonyer explained the Order of Conditions under DEP SE 211-0949 was issued in September 2015 for the
construction of a full foundation, addition, garage and deck; as part of the conditions, an existing paved
basketball court, partially located on town -owned land and within the Riverfront of Hodges Brook, was to be
removed and the area stabilized and left to naturalize. An As -Built Plan, "SE 211-0949 Certified Plot Plan of
Land in Mansfield, MA" dated June 19, 2017, was submitted, showing the basketball court has been
removed.
Craig Cygawnoski said the fence and concrete posts surrounding the basketball court were left in place
because it was determined it would cause more damage to pull them out.
Ms. Gonyer recommended a full Certificate of Compliance be issued.
Mr. Maxwell made the motion to issue a full Certificate of Compliance to Michael O'Brien, 39 Lantern Lane,
DEP SE 211-0949. Mr. Rieth seconded the motion.
Motion passed 4-0-0.
Hearing ended at 7:12 pm.
3. Request for Determination of Applicability: Melanie Jacques, 325 Balcom Street, Map 2, Parcel 100.
Application was filed for septic system and roof drainage upgrade within 100 feet of Bordering Vegetated
Wetland.
Craig Cygawnoski, RIM Engineering Co., Inc., said the homeowner is trying to sell the house but failed a Title 5
inspection. He said the existing septic system is located behind the house within 25 feet of the wetland area;
the new system will be moved to the side of the house as close to the road as possible.
Ms. Gonyer said the limit of disturbance in the back yard is the 25 -foot No -Disturb Area and the leach pit will
be moved to the side yard within the existing lawn area. She noted erosion control is shown on the plan
"Upgrade Sewage Disposal Plan for No. 325 Balcom Street in Mansfield, MA" dated June 19, 2017. She said
the upgrade to the septic system is a benefit.
Mr. Cygawnoski said the existing cesspool located at the 25 -foot No -Disturb line will be removed or crushed
in place.
1
Mr. Rieth made the motion to issue a Negative Determination for reason #3, work will not alter Resource
Area, to Melanie Jacques, 325 Balcom Street, Map 2, Parcel 100, for septic system and roof drainage upgrade
within 100 feet of Bordering Vegetated Wetland, in accordance with the plan "Upgrade Sewage Disposal Plan
for NO. 325 Balcom Street in Mansfield, MA" dated June 19, 2017, with the following Special Conditions:
• The Agent is to inspect the siltation control (per plan) prior to the start of work. Silt sock must be
mulch. Silt sock may be 8" diameter (min.);
• All disturbed areas are to be seeded as soon as possible. Erosion Control must remain in place until
all areas have been stabilized.
Mr. Smith seconded the motion.
Motion passed 4-0-0.
Hearing ended at 7:16 pm.
4. Request for Determination of Applicability: Michael A. Trowbridge, 10 Ephriam Drive, Map 43, Parcel 124.
Application was filed for the construction of a front porch and stairs within 100 feet of Bordering Vegetated
Wetland.
Ms. Gonyer said this application was originally reviewed to see if it qualified for an Administrative Review
(AR), but the increase, 288 square feet, was over the 200 square -foot maximum outlined under the AR
procedure. Ms. Gonyer noted the covered porch will require new sono -tubes and all proposed work is
outside the 50 -foot area, on a previously developed lawn area. She said the plan shows erosion control, silt
socks, to be installed.
Mr. Healey asked that there be no stockpiling of materials on site.
Mr. Trowbridge said there is no real need for the silt socks because the area is flat and stable, but they will be
put in place for the purpose of defining the work area.
Mr. Maxwell made the motion to issue a Negative Determination for reason #3, work will not alter Resource
Area, to Michael A. Trowbridge, 10 Ephriam Drive, Map 43, Parcel 124, in accordance with plan
"Conservation Plan 10 Ephriam Drive" dated June 28, 2017, with the following Special Conditions:
• The Agent is to inspect the siltation control (per plan) prior to the start of work. Silt sock must be
mulch. Silt sock may be 8" diameter (min.); silt fence or snow fence may be used on the side limit of
work to delineate the work zone;
• All disturbed areas are to be seeded as soon as possible. Limit of work must remain until areas have
been stabilized.
Mr. Rieth seconded the motion.
Motion passed 4-0-0.
Hearing ended at 7:23 pm.
2
S. Notice of Intent: Kevin Dumas, City of Attleboro — Water Department, Blake's Pond Dam at 250 Balcom
Street, Map 3, Parcel 94. DEP SE 211-0968
Application is for the rehabilitation of Blake's Pond Dam within 100 feet of Inland Bank, Bordering Vegetated
Wetland, Land Under Water, Bordering Land Subject to Flooding and 200 -foot Riverfront Area. Hearing was
continued from June 19, 2017.
Derek Schipper, GZA GeoEnvironmental, Inc., representing the City of Attleboro, was present.
Ms. Gonyer said at the June hearing the Commission heard from Mr. Schipper regarding the repair and
rehabilitation of the Blake's Pond Dam. Mr. Schipper reviewed the scope of the work, the installation of
another sheet piling wall in front of the existing dam, as well as the methodology, and construction
sequence. Ms. Gonyer said at that time there were some questions as to how to set the elevation and if it
would be advantageous to raise the top of the dam elevation to the FEMA Flood Plain Zone; because this is a
flood prevention dam, the elevation will be kept at the existing 130.3'.
Ms. Gonyer said the Commission asked for a more detailed Water Control Plan, to be submitted after the
Orders have been issued, but prior to the start of the work. Mr. Schipper said the contractor will be required
to put together a Water Control Plan for the project and the plan will be reviewed by the Office of Dam
Safety. Ms. Gonyer will meet with the contractor for a pre -construction meeting.
Ms. Gonyer said Richard Alves, Town Engineer, reviewed the hydrology and calculations and was fine with
the FEMA Flood elevation, but he did question if the pumps for the dam would be silent because this is a
residential neighborhood; Ms. Gonyer noted this should be specified in the Water Control Plan. Mr. Schipper
said he would anticipate a minimal pumping area with 2 -inch pumps.
Ms. Gonyer questioned the two-month work time frame; she had discussed with Mr. Healey about having
the contractor or a wetland scientist on site to submit weekly updates to the Commission, how often they
would need to be submitted, as well as the number of site visits necessary. Mr. Schipper explained the time
frame includes the setting up of equipment, preparing the site and the installation of erosion controls, so the
actual rehabilitation work could be done in three weeks. Mr. Healey said because of the sensitive nature of
the site, reports should be submitted a minimum of once a week, with reports submitted twice a week and
possibly three times a week during certain phases of the work.
Ms. Gonyer asked that signage be installed for the trails coming from the residential portion of the property.
She said Mr. Schipper was given a draft of the Order for review.
Mr. Healey read into the record the Special Conditions for this project. He also read into the record an e-mail
from Sandy and Bob Hayes, 224 Balcom Street, who expressed their concerns about the wetlands on their
property and wanted to make sure there would be no changes to the flood plain. A letter was sent to Mr.
and Mrs. Hayes from Derek Schipper on behalf of GZA, addressing their concerns.
Ms. Gonyer questioned the erosion controls because the plan shows only the limit of work. Mr. Schipper said
the erosion controls, 12" silt socks, are shown on Sheet C1. Ms. Gonyer said 8" silt socks can be used, staked
outside the sock, as opposed to actually puncturing the silt sock. She asked if there would be any type of
demarcation along the limit of work or would the path just be cleared. Mr. Schipper said they are simply
pruning the brush and removing small saplings to provide access for vehicles.
3
Mr. Rieth made the motion to issue the Order of Conditions to Kevin Dumas of the City of Attleboro's Water
Department, for the rehabilitation of Blake's Pond Dam at 250 Balcom Street, DEP SE 211-0968, for the
rehabilitation of Blake's Pond Dam with the following Special Conditions under the Mansfield Wetland
Protection By -Law, Chapter 220:
1. No work can be started until the Order of Conditions has been recorded with the Bristol County Registry
of Deeds and the receipt of the Order is returned to the Commission filled in by the Registry.
2. All work must conform to the site plans titled "Proposed Blake's Pond Dam Rehabilitation', prepared by
GZA GeoEnvironmental, Inc., prepared for the City of Attleboro referenced and detailed below:
B!
Final
Sheet
Description
Revision
No.
Date
GENERAL DRAWINGS-
03-29-
G1
TITLE SHEET AND DRAWING INDEX
2017
03-29-
G2
LEGEND AND NOTES
2017
03-29-
G3
SITE EXISTING CONDITIONS
2017
03-29-
G4
DAM AREA EXISTING CONDITIONS
2017
HISTORIC DESIGN DRAWING FOR EXISTING
03-29-
G5
DAM
2017
03-29-
G6
FEMA FLOOD ZONE AND RESOURCE BUFFER
2017
03-29-
G7
BORING LOGS 2016
2017
CIVIL DRAWINGS
SEDIMENT, EROSION & WATER CONTROL
03-29-
C1
PLAN
2017
03-29-
C2
SITE FINAL CONDITIONS PLAN
2017
03-29-
C3
DAM AREA FINAL CONDITIONS PLAN
2017
B!
3. All notes and conditions (including General Notes, General Conditions, General Scope of Work and
Anticipated Construction Sequence, Erosion and Sediment Control Notes, and Water Control Notes)
outlined on Sheet G2, Legend and Notes', dated March 29, 2017 are to be included as conditions of this
Order of Conditions
4. All limits of work and erosion controls shall be installed prior to any construction, clearing, or excavation.
The erosion controls shall consist of a 8" diameter biodegradable mulch -filled silt sock with wooden
stakes every 10 feet on each sides of sock or equivalent (do not pierce silt sock with stakes). In addition
to the silt sock, trenched -in silt fence may be required depending on the specific site conditions. See the
Conservation Agent (Agent) for specific erosion control design standards. The Applicant shall notify the
Agent when any such devices or measures are installed so that a site visit can be conducted prior to the
commencement of work. The Conservation Commission or its agent is to be notified of the starting date
of the work prior to its commencement.
5. The Commission reserves the right to require additional mitigation or erosion control devices or
measures if mitigation or erosion control devices are not adequately installed or maintained on site. The
contractor shall monitor turbidity downstream from the work zone. If turbidity issues occur, the
contractor shall contact the Agent and install additions mitigation measures.
6. The Applicant shall ensure that all demarcation (i.e. limits of work) and erosion control devices will
remain in place and be maintained throughout the construction process and until all disturbed areas are
stabilized. Stabilization shall be achieved once a complete vegetative cover is reached. Seeded areas
shall be covered with a suitable protective cover to allow the seed to germinated and become
established. All side slopes greater than 3:1 (but less than 2:1) are to be covered with jute mesh and
seeded. At no point shall erosion occur resulting in sediment entering the wetland areas. If erosion
occurs, the Agent is to be contacted to review the extent of the erosion and determine follow-up actions.
7. A construction sequence including a specific and detailed Water Control Plan provided by the contractor
is to be submitted to the Commission and the Agent prior to the start of work. Once construction has
begun, the contractor shall provide weekly updates to the Conservation Commission and/or the Agent
outlining the progress of the project until the project is completed.
L
SEDIMENT, EROSION & WATER CONTROL
03-29-
C4
DETAILS
2017
STRUCTURAL DRAWINGS
03-29-
01
SHEET PILING PROFILE
2017
03-29-
02
ELEVATION VIEW & DETAILS
2017
03-29-
03
SHEET PILING DAM SECTIONVIEW &DETAILS
2017
03-29-
04
DETAILS
2017
3. All notes and conditions (including General Notes, General Conditions, General Scope of Work and
Anticipated Construction Sequence, Erosion and Sediment Control Notes, and Water Control Notes)
outlined on Sheet G2, Legend and Notes', dated March 29, 2017 are to be included as conditions of this
Order of Conditions
4. All limits of work and erosion controls shall be installed prior to any construction, clearing, or excavation.
The erosion controls shall consist of a 8" diameter biodegradable mulch -filled silt sock with wooden
stakes every 10 feet on each sides of sock or equivalent (do not pierce silt sock with stakes). In addition
to the silt sock, trenched -in silt fence may be required depending on the specific site conditions. See the
Conservation Agent (Agent) for specific erosion control design standards. The Applicant shall notify the
Agent when any such devices or measures are installed so that a site visit can be conducted prior to the
commencement of work. The Conservation Commission or its agent is to be notified of the starting date
of the work prior to its commencement.
5. The Commission reserves the right to require additional mitigation or erosion control devices or
measures if mitigation or erosion control devices are not adequately installed or maintained on site. The
contractor shall monitor turbidity downstream from the work zone. If turbidity issues occur, the
contractor shall contact the Agent and install additions mitigation measures.
6. The Applicant shall ensure that all demarcation (i.e. limits of work) and erosion control devices will
remain in place and be maintained throughout the construction process and until all disturbed areas are
stabilized. Stabilization shall be achieved once a complete vegetative cover is reached. Seeded areas
shall be covered with a suitable protective cover to allow the seed to germinated and become
established. All side slopes greater than 3:1 (but less than 2:1) are to be covered with jute mesh and
seeded. At no point shall erosion occur resulting in sediment entering the wetland areas. If erosion
occurs, the Agent is to be contacted to review the extent of the erosion and determine follow-up actions.
7. A construction sequence including a specific and detailed Water Control Plan provided by the contractor
is to be submitted to the Commission and the Agent prior to the start of work. Once construction has
begun, the contractor shall provide weekly updates to the Conservation Commission and/or the Agent
outlining the progress of the project until the project is completed.
L
8. Prior to the commencement of work, a pre -construction meet shall be held with the Agent, the Engineer
and/or Representative, and the General Contractor to review the Order of Conditions, scope of work and
construction sequencing.
9. The Applicant shall be responsible to ensure that all contractors on site during the construction have
received and reviewed the Order of Conditions and all plans of record.
10. Wetland flagging must remain in place until the project has been completed and the Certificate of
Compliance issued.
11. The Certificate of Compliance shall be requested in writing upon completion of the project. At the same
time, the applicant or any successor shall, upon completion of the project; submit an as -built plan and
letter signed by a professional engineer, certifying that the work has been done in accordance with the
approved plan.
12. Any modifications or revisions to the plan(s) referenced in this Order must be submitted to the
Commission for review. If, after their review, the Commission finds that the changes are not significant
enough (minor modifications) to warrant an Amended Order or new Notice of Intent, then the revised
plans shall be considered the new plan of record. If the changes are significant enough to warrant an
Amended Order or new Notice of Intent, then the applicant is required to file accordingly.
13. If stabilization of disturbed areas and does not occur after the first post -construction growing season, the
Agent is to be notified of the proper stabilization techniques that are to be implemented to insure no
sediment is discharged to the existing wetland.
14. The included Hydrologic Report and Stormwater Management Plan prepared by GZA, Inc. submitted May
2017 is to be included with this Order of Conditions. All on-going 0&M plan reports and checklists are to
be submitted to the Commission as noted.
Mr. Smith seconded the motion.
Motion passed 4-0-0.
Hearing ended at 7:40 pm.
6. Abbreviated Notice of Resource Area Delineation: John Stanbrook, 265 Fruit Street — Fruit Street to
Norton Town Line, Map 36, Parcel 15. DEP SE 211-0969
Resource Area Delineation for the Norton/Mansfield Rail Trail Extension
This hearing was continued from May 22 and June 19, 2017.
Ms. Gonyer said she walked the site about a year ago with Matt Shute, BETA Group, Lenore White, Wetland
Strategies and Richard Alves, Town Engineer. She also met in the field with Jen Carlino, Town of Norton
Conservation Agent, to tabulate all the issues associated with this project, which were then forwarded to
BETA Group for review. She met with Mr. Shute, Ms. White and Ms. Carlino at Town Hall to review the field
notes, and, again met in the field with Ms. White to locate the boundaries of the Potential Vernal Pool (PVP),
which has been categorized as a PVP through Natural Heritage.
BETA submitted revised plans dated July 21, 2017, showing all changes; Mr. Shute discussed the field changes
and there was no further discussion by the Commission. Ms. Gonyer recommended the Order of Resource
Area Delineation be issued.
Mr. Maxwell made the motion to issue the Order of Resource Area Delineation to John Stanbrook, 265 Fruit
Street — Fruit Street to Norton Town Line, Map 36, Parcel 15, DEP SE 211-0969, as shown on the site plan
2
"ANRAD Submittal — Rail Trail Extension, Norton and Mansfield" revised July 21, 2017, prepared by BETA
Group. Mr. Rieth seconded the motion.
Motion passed 4-0-0.
Hearing ended at 7:51 pm.
7. Correspondence:
8. New Business:
Administrative Review: The process for Administrative Review will become a more formal application with a
fee. Ms. Gonyer said the General Rules and Regulations of the Town of Mansfield Wetland Protection By -
Law will have to be reviewed and updated and the Administrative Review process added to the town's
General By -Laws, which were last changed in 2015.
9. Old Business:
Reorganization of Board: The Commission will reorganize the board at the next meeting when more
members are present. She will meet with the Board of Selectmen to discuss the appointment of alternate
members.
Update of town -wide active projects:
130 Spring Street, Map 28, Parcels 164 & 165: Ms. Gonyer said this is a 55 and over residential compound
(approved December 19, 2016 under DEP SE 211-0964) that abuts the Willowdale subdivision. She met in
the field with the wetland scientist and owner James Lazzara; everything looks good.
Mr. Maxwell asked about the shed at 140 Williams Street; Ms. Gonyer said the shed will be removed but
there are still septic system installation issues.
Ms. Gonyer said she will follow up on any active projects to make sure all disturbed area are stabilized going
into the fall and winter months.
Approval of June 19, 2017 minutes: (Rieth/Smith) Motion passed 3-0-1 (Mr. Smith abstained.)
10. Adjournment:
Motion to adjourn at 8:05 pm: (Rieth/Maxwell) Motion passed 4-0.
Next meeting will be August 21, 2017.
ftw"s -F qwt,� -L 9 -1
Michael Healey, Chairman Date
7