HomeMy WebLinkAboutMBC 01/05/1989Mansfield Municipal Building Committee Mansfield, Mass. 02048 Minutes of meeting January 5, 1989 p ���� FE MBC members: S. MacCaffrie, F. Guardabascio, E. Giordano,'',) MBC -School: L. Amoruso, R. Gurek, A. Micheli Guests Present: J. Moran, S. Calvin, J. Begley, S. Button R. Gurek, M. Terella (HMFH), R. Usela (HMFH), C. Norris (HMFH), J. Miller (HMFH) Meeting called to order at 7:45 P.M. by S. MacCaffrie for the purpose of school business. C. Norris (HMFH) made a presentation on the new school design. The plans were reviewed and alternate number 4 was determined to be the accepted design. It was noted the building square footage has been reduced from the original plan and that the total square footage reduction was about 15,000. Chuck also noted that the actual design reduction in square footage was about 12,000 and after closer scrutiny, the original design was approximately 3,000 square foot larger than it actually was. It was also decided to include all below grade foundation for the expansion as it is much more cost effective to install the foundation now. S. MacCaffrie commented that current building costs per square foot were ranging from $107 to $142. Steve estimated that the cost per square foot at bid time would most likely be in the range of $115 to $120. Current project estimates (values in millions of dollars) are as follows (rounded off): Building 15.60 Arch. fees 1.00 Furn./Equip. 1.60 Contingency 0.95 Library 0.20 Misc. 0.10 total 19.40 Meeting adjourn d at 9:30 P.M. ��r�-C�-11c Grank Guardabascio Clerk, Municipal Building Committee