Minutes
meeting of March
10
|
1�
�f
MBC members: S. Mac�affriev
I
F. Giordano,
--�
W" Verzola,
C. Antnnuccio
MDC-LI9/COA: D, Am�den
r. Cauldwellv J" C'orliss
Guests : G" Farrugia, J. Cicolao M. Russel], L" Fish,
Charlotte ?
Meeting called tc.-I order at 7:el. �-j P"M" for MBC besiness
Minutes of the Feb 28th meeting accepte� as ammended"
The recreation commision had requested they have a meeting with the
MBC. This request was a reeult rf the meeting they had regarding
building a town pool. They requested advice on how to get s+al, ted
especially since they wantec-1 +o get an article on a feasibility
study on the warrant for the special town meeting within the annual
town meeting" S" MAcCaffrie noted the MBC is not responsible to
sponsor projects, only +o administer them once they are appr�ve�
Art(:] ready to ngo the article reqeest
for a feasibilty study. Once the article is an
advertisement for an archit(.-'ct can be made and for,
the duratjon of the ^pool» project can he made frc)m the Recreation
�ommision"
It was also mentioned !.*.hat the proposed site v�as rn the Hutchinson
property or in Mentor :ial PArk" The committee noted that the 1980 C"
Johnson topographical study and wetlands marking is not to be used
as there are significant errnrs III measurements and location of
we+lands" It vias also suggested a site Imalk with +he conservati"n
fund"
In additicn, the MRC' noted funding for the project must be single
sourced (i"e" from a single hond and not from donations or gif�s)"
The whole amount must be bonded and any funchs accrued can be used
to offset rosts"
The meeting was adjourned at 8:01 P.M, to the larger reference rocjfit
in the Library.
Yarirus peices of correspnnIII ence were read regarding the project"
Page 2 of 3
Mansfield Municipal Building Committee
Mansfield, Mass. 0200.1
Minutes of meeting of March 14, 1989
It was noted that the light box mounting was reviewed and all are
installed satisfactorily now. J" Cico\a was hung from each light
box (178 lbs).
Cost of relocating the boiler flues is now zero however, the Gr has
some minor costs to add.
The exhaust fans were located to the rear roof at a cost not to
exceed $1552 for time and materials^
The entrance barrel vault (item 32,3) was dropped from job site
meeting minutes 038" The barrel vault needs to he reworked. There is
no drip edge and the radius of curvature of the vault does not match
the trim (vault is 2-3 inches wider than it should be at the bottom"
The MBC noted all interior colums are not acceptable. Some are taller
and some are shorter than they should be. One column in particular
is unacceptable to the MBC as it stands.
The Library has a bid for a mover however, the mover does not appear
to be qualified to perform the work"
S. MacCaffrie requested completion dates regarding sections of the
building so that moving can be sequenced. In addition, the MRC requests
that 15 days be allocated for a "punch list"" This will allow the
crn+ractorto complete items on the list in a reasonable time. A
suggestion was made to do the punch list on a room by room basis with
representatives from the archi+ec, contractor and MBc present. It was
also suggested to do the review on videotape to document the items and
buidljng shape" The punch list items will be resolved on a "Fair''
basis on the spot to eliminate delays. The building will he reviewed
prior to moving in any fixtures"
J. Cicola requested the M9C`s approval to have a professional
photographer take pictures of the completed building and the MBC
agreed along as a set is presented at no cost to the Library for
archival purposes"
It was also noted that the building is still not secured at night.
Some doors are still left unlocked" It was also noted that the floor
in the hookstack area is still in level (a moderate dip exists and
the contractor notes the floor was levelled)"
Page 3 of 3
Mansfield Municipal Building Committee
Mansfield, Mass. 02048
Minutes of meeting of March 14, 1989
It was also noted that furnishings will be delivered and stored onsite
in one room.
J. Cicola
requested the MBC re -review
it's decision not
to pay the
final invoice
for the architect"
He
presented
his case
and the MDC
listened"
nAsed on the situation
of
not having
a punch
list and other
incompleted
work, a motion was
made,
seconded
and voted
unanimous
not to pay
the invoice (again).
R. oerzola had to leave the meeting early.
F. Guardabascio presented a bill for $7"34 for tapes used to record
meeting minutes. Motion made, seconded and voted 4-0 with one ehstention
(F" Guardabascio) to pay the bill. K
Meeting adjourned at 9:45 P.M.