HomeMy WebLinkAboutMBC 06/13/1989�
JUL"
Mansfield Municipal Building Committee
Mansfield, Mass. 020413
Minutes of meeting of June 13, 1989
Page 1 of 3
MBC members: S. MacCaffrie, F. Guardahascio, E. Giordanov
C. Antonuccio, W. Verzola
MBC-LI9/CgA: C. Cauldwe]], J. rorliss, D. Amsden
MBC -School : L. Amoroso, A. Micheli
Guests : G" Farrugiav J. Cicolav M. Russell, P. Kaurena,,
J. Miller, R. Juusela
The meeting was called to order at 7:35 P.M. for LIP/CPA business.
The minutes of the 5/23 meeting were read and a motion was made,
seconded and voted unanimous to accept them.
Various correspondence was read"
A motion was made, seconded and voted unanimous to accept a change
order in the amount of $313 for extra door astrgals.
A motino was made, seconded and voted unaimous to acept a change
order in the amoutn of $2755 for general hardware changes"
A mrtino was made, seconded and voted unanimous to accept a change
order for $1516 for adding continuous ridge vent (which was an
architectural omission).
A motion was made, seconded and voted unanimous to accept a change
order for $132 for additional underground drains (time and materials).
A motion was made, seconded and voted 7-0-1 to accept a change
order for $296 for weatherstripping the garage doors. The MBC notes
it did not authorize this change but will accept it as a betterment.
D. Amsden presented a bill from Business Interiors for $2112 howevery
she recommended that $269 he deducted to cover a table which was returned
(wrong color and damaged)" A motion was made, seconded and voted
unanimous to accept the bill for $1843.
It was noted the glass for the display cases in the lobby was still not..
installed" The contractor noted the order was placed with the suppier
multiple times as the supplier had "lost" it, The Mnr was guaranteed
the glass would be here this week.
Page 2of3
Mansfield Municipal Building Committee
Mansfield, Mass" 02049
Minutes of meeting of June 13, 1989
The site survey initiated by the MBC with C.4> Garvey has been received
and it confirms the improper grading toward the building" The survey
will be forwarded to the landscaping consultant for review" The charges
for the survey will he directed to the general contractor (GC) as the
property does not drain properly.
A preliminary exterior punch list has been done by the architect and it
will he finalized this week" The architect will notify the BC when it
is ready.
The GC noted that the seven doors in question (frame assembly problems)
are being reviewed with the vendor. The GC will notify the MBC of the
outcome"
The GC submitted the "final" requisition for payment of $27v567.00, The
requisition still shows retainage funds of $92,233"00 on it. A motion
was made, seconded and voted unanimous to accept theis requisition"
The MBC is holding comments on the landscaping until the landscaping
consultant does a final punch list.
A motion was made, seconded and voted unanimous to have the town assume
maintenance (cutting and watering) of the sodded area pending review by
the landscaping consultant and after the second sutting has occurred"
The architec was directed to monetize the exterior punch list ASAP"
A motion was made, seconded and voted unanimous to allow S. MacCaffrie
to sign final requisition pending receipt of monetized punch lists"
Meeting adjourned B:35 P.M. for Ll9/rDa business"
Meeting continued for School business at 8:40 P.M.
Invoice number 9 from the architect was received in the amount
of $190,408.00. This is for 100% of schematic design and Ru%
design development. This invoice includes a past due amount as the
previous invoice given to R. Gurek was noted handled properly"
R. Gurek improperly forwarded the invoice to the town (who is
ultimately responsible to pay it) however, he should pay it. This
is the same scheme used for the LIB/CPA project (MBC authorizes
the responsible party to pay bills" A motion was made, seconded and
voted unanimous to pay the invoice" F. Guardabascio directed to
forward the invoice along with a voucher to the town manager ASAP"
L�/ ° � �
�)/�'/�»�«/Y,��c`'� ��c��/x/»��� («'kf// /\'z/vn^^~�
Page 3 of 3
Mansfield Municipal Building Committee
Mansfield, Mass" ()2048
Minutes of meeting of June 13, 1989
The architect brought eh Environmental Notification Form (ENF)
for the MBC to sign. The architect will make copies for the town
managery MBC,
The architect brought along working drawings and requested who
should review them. The MBC recommended the Fire Chief, Planning
Board (for their information only), Building Inspector, DPW and
Conservation Commission" A review of the drawings was then begun"
The project costs were then reviewed. The architect estimate for
the building is $16,455,495. His consultant's estimate was for
$16,596,112. Alternatives to reduce the cost were presented and the
MBC reviewed them. The choice was for add/alternates for classrom
space. In additiono the MBC felt carrying $200,0()0 for library
books was excessive. In addition, the MDC recommends the project
he advertised as costing $15,800,000"
After the review, the MBC directed the architect to proceed with
working drawings and present them to the qBAB for review and approval.
Meeting adjourned at 10:3() P&
Frank Guardabascio,
Clerk, Municipal Buidling Committee