HomeMy WebLinkAboutMBC 07/11/1989Mansfield Municipal Building Committee
Mansfield, Ma` 02048
Minutes of meeting of July 11, 1989
Page 1 of 3
MBC members: S. MacCaffriev F. Guardahascio, E. Giordano'
W. Verzo]a
MBO-LIB/COA: C. Cauldwell, D. Amsden
Due to a scheduling conflict in meeting rooms, the meeting
which was posted for the LIB/COA public meeting room was moved
to town hall" The clerk will check further meeting dates and
repost as necessary.
The meeting was called to order at 7:35 P.M. for LIB/COA
business at the town hall"
The minutes of the 6/27 meeting were read and a motion was
made, seconded and voted unanimous to accept them"
For the record the substantial completion forms for the
LIB/GOA facility have been received.
A motion was made, seconded and voted unanimous to pay a bill
in the amount of $408 for the building bronze plaque.
A quote of $4025"00 by PC associates of Mansfield to ins+all
gutters on the LIn/COA facility has been received" A motion
was made, seconded and voted unanimous to authorize D. Amsden
to issue a purchase order not to exceed the amount of $4025
for installation of gutters"
A bill from Business Interiors in the amount of $560 for
library personnell lockers was held on the recommendation of
D. Amsden as no hardware was shipped for installation"
Two bills in the amount of $4194.42 (map case) and $249.12
(cork supports) were presented. A motion was made, seconded
and voted unanimous to accept them"
D. Amsden notes outstanding items include office furniture for
both herself and G. Farrugia (Desks and credenzas) as well as
the Library kitchen staff table.
A letter from D. Rodrigues of Cablevision to D. Amsden was
read regarding lawn damage caused by a truck during cable
installation"
Mansfield Municipal Building Committee
Mansfield, Ma. 02040
Minutes of meeting of July 11, 1987
Page 2of',!5
D. Amsden presented a plan to fabricate a maintenance area in
the garage for the library maintenance person. This plan was
presented as no room exists in the LIB/CDA facility to allow
minor repairs. The plans include approximately $400 worth of
materials and the DPW would supply labor"
It is noted that the original allocation of a portion of the
garage to the recreation commission is now retracted" The
original allocation of space in the garage was done as a
consideration based upon the LT8/rOA being allowed access
across what the recreation commission believed was their
/'buffer zone". At a date subsequent to the original
"agreement", it was found the recreation commission had no
rights or alleged use to the property" The garage is the
property of the LIB/COA facility and they are to have full use
of it. The allocation of a portion of the garage is at the
discretion of the LIB/GOA.
A motion was made by r. Cauldwell, seconded by F. Guardabascic)
to approve this reallocation of garage space" Voted unanimous.
It was also noted that coincident with this work, electrical
work would be needed to install electricity for overhead
garage doors" Estimates indicate work should not exceed $800"
A motion was made, seconded and voted unanimous to authorize
construction of a maintenance '/work shop" and storage area in
the garage per plans presented to the MBC on 7/11/89 using
labor supplied by the DPW with materials not to exceed $400.
A motion was madev seconded and voted unanimous to authorize
electrical work in the garage for overhead doors operators and
light fixtures with time and materials not to exceed $800^
Various correspondence items between the general contractor
and the architect were read. These were in regards to
outstanding hills. For the record, the MBO has not received
any bills as of 7/11/87" Also for the record, the MBC has not
received any AIA invoices, Claims were made that an AIA
invoice in the amount of $10,536 was presented to the MBC by
the general contractor" Since the MBC was presented with a
copy of the form (as given to D. Amsden) a motion was made�
seconded and voted unanimous to accept the invoice" This is
change order number nine.
Mansfield Municipal Building Committee
Mansfield, Ma" 02048
MimsteS Of meetimg Of Jcly 11, 1789
Page 3 of 3
Various letters from Kaye landscaping to the general
contractor were read concerning plantings on the site. Blame
is being directed at the MBC rather than on the general
contractor. Comments on this item were withheld pending review
by the architect and the architect's landscaping consultant.
The MBG will pursue getting the rear slope of the building
covered with stone to prevent any possible erosion.
D. Amsden noted neighors have indicated their dissatisfaction
with the state of
the Coparini
property used by
the general
contractor as a "staging/office"
site. The MPC
notes all
complaints should
be in writing
and the general
contractor
must restore the
site to it's
original state per
any site
leasing agreements
made.,
Meeting adjourned
at 8:32 for LIB/COA
business"
*eeting re—convened at 9:45 for school business.
A motion was made, seconded and voted unanimous to authorize
additional site survey work with E. J. Flynn in the amount of
$11,689,28 for the school project over and above the original
work"
Correspondence was received from the school project architect
HMFH on projected billing breakdown. This will be forwarded to
the town accountant"
An invoice from the architect for $40,612 was received
indicating 100 % schematic design completion and 100% design
development. A motion was made, seconded and voted unanimous
to pay this invoice,
Frank
Suardabamci%
Clerk,
Municipal 9uidling Committee