HomeMy WebLinkAboutMBC 08/13/1991RU Ed0`l
4' mil
-, ;-M�unicipal
TCIV� `I Mansfield,
9I OCT 23 Mir 1056 of August
'PT"4 nY: S. MacCaffrie,
MBC memberss�
G. Murphy
Building Committee
MA 02048
13, 1991 Meeting
E. Giordano, C. Antonuccio,
Associate members present: A. Micheli, L. Amoruso
Visitors: R. Juusola/C. Traynor HMFH; J. O'Keefe, Clerk of Works;
N. Lohrer, Integrated Contract Design; Dr. Warren,
Superintendent; R. Gurek, Business Manager
Meeting called to order by Chairman S. MacCaffrie at 7:35 p.m.
Correspondence
August 7, 1991 Construction Change Directive No. 10 from HMFH to R.W.Granger.
August 13 Proposal Request No. 20 from HMFH to R.W.Granger requesting quote to
remove fallen trees outside limit of clearing caused by wind and not covered in
Contract Sum.
Site visit notes of July 31, August 5, and August 9 from Simpson Gumpertz &
Heger.
Steel Inspection report of July 15 from UTS.
Owner Meeting Minutes No. 30 from R.W.Granger.
Letter of July 22 from HMFH to R.W.Granger regarding C.O.R. No. 39 concerning
charges for water tap fee. HMFH advised that MBC rejected C.O.R. as letter
from C&S did not provide adeg2uate evidence that the correct info was not
available to bidders.
Change Order Request No. 18 of July, 23 from HMFH to R.W.Granger to increase
venetian blinds to 16.
Letter of July 11, 1991 to R.W.Granger from HMFH advising that their claim they
have been delayed because the Town had not issued oil tank licenses and permits
is unacceptable.
Letter of July 25 from HMFH to Mansfield Fire Dept. advising they have reviewed
the backfilling of the oil tank with Dept. of Public Safety and is in full
compliance with 327 CMR/9.15 Underground Tank Installation.
Letter of July 25 from HMFH to R.W.Granger regarding intent to install
bituminous binder on entry road from East St, and to proceed with road work.
Memo of July 22 from Foley and Buhl Engrg. regarding site visit at Complex on
July 15 to review structural steel work in progress.
Letter of July 25 from HMFH to R.W.Granger regarding C.O.R. 24 and advising
that the MBC needs more detailed explanation ceiling framing, ceiling GWB, and
explanation of additional staging costs.
Mansfield Municipal Building Committee
August 13, 1991
Page 2
Correspondence cont'd
Transmittal of July 25 from HMFH to MBC enclosing first draft R. Gurek prepared
at July 9 MBC meeting and revised copy for MBC records.
Letter of July 25 from HMFH to R.W.Granger advising that they have processed
and returned all shop drawings identified as being critical to progress of job.
Letter of July 25, 1991 from HMFH to R.W.Granger asking RWG to provide complete
list of who under their contract is currently bonded with proof of bond.
Letter of July 25, 1991 from HMFH to R.W.Granger reminding them that security
and safety are their responsibility at new School Complex. Also that a credit
is due MBC if RWG is not going to provide fencing around trailers and stored
material.
Letter of July 25 from HMFH to R.W.Granger approving filling of new oil tanks
and that tank will be filled full not one-half as previously discussed.
Letter of July 25 from HMFH to R.W.Granger advising they have reviewed Mass
Building Code regarding ceilings with boiler/mechanical rooms and that HMFH
will be in full compliance with Sec. 913, Roof Construction shall be non-com-
bustable and Sec. 116, boiler rooms shall have 1 hr. rated wall construction.
Letter of July 26 from HMFH to R.W.Granger advising that C.O.R. No. 46 needs to
be revised as washing down masonry HMFH feels is not justified.
Letter of July 26 from HMFH to R.W.Granger:advising C.O.R. No. 52 requires
additional explanation on the time delay caused by sewer line installation.
Letter of July 26 from HMFH to R.W.Granger stating they have reviewed C.O.R.
No. 57 and request revised pricing on added costs by Maurer Sforza.
Memo of July 29 from MBC to HMFH expressing concern as to the stability of
bituthane that has been exposed beyond manufacturers recommendation.
Letter of July 29 from HMFH to R.W.Granger advising that C.O.R. 41 for moving
rocks has been rejected by MBC.
Transmittal of July 29 from HMFH to MBC enclosing responses from Grande Bros.
regarding issues in SG&H reports.
Letter of July 29 from HMFH to MBC regarding them contacting School Facilities
Service Bureau and what are limits for reimbursement of moveable equipment and
including a second soccer field on Complex site.
Letter of July 29 from HMFH to R.W.Granger advising no revised structural
calculations from Imperial Glass have been received yet and that curtainwall is
continuing to be installed that has no approved attachment details at head
conditions.
Mansfield Municipal Building Committee
August 13, 1991
Page -3
Correspondence cont'd
Fax of July 29 from HMFH to MBC regarding a conflict with 3 steel collar ties
and related detailing and that R.W.Granger wants an immediate resolution.
Transmittal of August 7 from HMFH to MBC enclosing landscaping field reports of
July 8 and August 1 from the Halvorson Company.
Site visit notes of July 19 and 25 from Simpson Gumpertz & Heger to HMFH.
Letter of July 30 from HMFH to R.W.Granger advising they have review C.O.R. No.
33 and request either a revision in price to $.05 psf or attachment of wage
rates and estimation of sq.ft. covered per hr. to justify $.02.
Letter of August 2 from HMFH to R.W.Granger advising they are in receipt of
Bilt-Rite's letter concerning finish quality of hollow metal frames.
-_ Letter of August 2 from HMFH to R.W.Granger advising that upon review of
bathroom lighting detail with MBC HMFH is issuing a Directive which calls for
F hanging the sheetrock over the entire bathroom ceiling. Credit from Quinn
Construction is also being asked for.
Transmittal of August 8 from HMFH to MBC regarding bathroom lighting at the
Complex.
Fax of August 5 from MBC to HMFH asking if Complex has a security system.
Memo of August 8 from D. Smith, Public Library to B. Cook attaching letter from
Design Partnership of Cambridge which indicates that library reading area door
is not necessary for egress.
Memo of August 8 from Public Library to MBC asking to spend approx. $1,300 for
an additional book drop.
MOTION: To table request until we get response from B. Cook
regarding rear door and occupancy issue.
VOTE: EG/CA Vote: 4-0-1
Memo of August 12 from MBC to HMFH asking status of hardware which MBC has
already paid for, status of labor investigation, and where is response from
Avenue Welding.
Field Report of August 7 from Thermo Consulting to HMFH regarding electrical.
Transmittal of August 7 from HMFH enclosing Field Report from Halvorson Co.
concerning landscape area.
Financial
MOTION: Pay McPhail Assoc. $1,373.28.
EG/CA Vote: 5-0-1
e
Mansfield Municipal Building Committee
August 13, 1991
Page 4
Financial cont'd
MOTION: Pay HMFH added services from Simpson Gumpertz & Heger
in amount of $4,351.05.
EG/CA Vote: 5-0-1
MOTION: Pay $380 for security system at Public Library.
CA/EG Vote: 5-0-1
(gavel passed to GM)
MOTION: Pay UTS $137.50.
CA/EG Vote: 5-0-1
MOTION: Pay HMFH $11,281.11 for month of July.
EG/CA Vote: 5-0-1
MOTION: Pay R.W.Granger $1,320,650.
AM/EG Vote; 5-0-1
Integrated Concept Design
The FF&E Programming book can be revamped at a later date or red lined as some
specs will be deleted. Discussed this meeting what we are getting for our
dollar. There will be a mock up where vendors will drop off furniture samples
for W. 29 meeting for ICD business only. At mock up meeting will tell Nancy
what d rection to go in as far as networking concerns. Direction will come
from Dr. Warren's people.
Clerk of Work's Report
Everything going well. Need to know if going to run gas or oil. C.
Antonuccio concerned with security. S. MacCaffrie suggested to buy plywood and
temporary locks. HMFH is going to send letter to R.W.Granger expressing
security concerns.
r
HMFH
Change Order Request No. 36 has been rescinded.
MOTION: Approve Change Order No. 61 for $5,328.00 credit.
CA/EG Vote: 5-0-1
MOTION: Approve Change Order No. 60 to add 7 additional
incoming lines to telephone system.
EG/CA Vote: 5-0-1
MOTION: Approve Change Order No. 62 to furnish and install
plaster traps in two Art Rooms for $1,532.
CA/EG Vote: 5-0-1
Mansfield Municipal Building Committee
August 13, 1991
Page 5
HMFH Report cont'd
Change Order for review - HMFH would like MBC to reconsider changing wall in
music room to be glass block. It will be a no cost change. Mason is giving
credit in two other areas.
MOTION: Accept glass block wall at no cost.
GM/AM Vote: No -2
Yes -3
Motion carries.
MOTION: Accept step flashing Change Order in amount of $6179.
EG/AM Vote: 5-0-1
MOTION: Accept Change Order in amount of $1,162.
CA/EG Vote: 0-5-1
MOTION: Accept Change Order No. 48 for removing ledge near sewer.
CA/EG J q.q3& Vote: 5-0-1
MOTION: Accept Change Directive on bracing for $3,221.00.
EG/GM Vote: 5-0-1
Dr. Warren and his staff will look into if added security is needed at Complex.
R.W. Granger's attorney is working on Avenue Welding and Bethlehem Steel suit.
Waterline has been tested and approved.
Placques will be placed throughout school. ^Wording will be provided by
Superintendent. Time capsule will be done for Roland Green and Park Row.
Next Meetings
August 28, 29 and Sept. 5.
Adjournment
MOTION: To adjourn at 11:30 p.m.
EG/CA Vote: 5-0-1
Respectfully submitted,
Carol Baldwir Secretary
Approved
MacCaffrie, Chairman
Sent to Town Clerk U 2 i/