Loading...
HomeMy WebLinkAboutMBC 03/10/1992° WN n�``'`+ A\�yy�o �v �������������l0 ������K����7������ ~- --'.-�~~~.~.~''� ~.^.~~^..'~.~~.~��. 5OWest Street, Mansfield, MA02048 MAHGFIELD MUNICIPAL 8UILDING COMMJTTEE MEETING MARCH 10, 1991 Attendees: Louis Amoruso, Chuck Antonuccio, Emil Giordano, Frank Guardabascio, Bob Gurek, Rob Juulosa, Steve MncCaffrie, or, Ma]xey, Callie Traynor,Aoo,e° M/cQVi The meeting opened at 7:15 pM. at Mansfield High School Dr, Malvey discussed the bids for hardware and software of the computer system for the Jordan Jackson school. The bids canvz in at approximately $414,000 for TSM and $484,000 for Apple The two systems would network together. What is needed now is to compare each component in like parts to further br*�kR down and analyze the bids. nrchitects report: Requisition #15, for general contractor to School Department: R.W. Granger & Sons: the recommended figure is $991,944 as amended, if accepted Rob Juulosa will edit the front page and enclose a letter explaining the differences Lou makes a motion to accept the amount pf $391,944 as amended. Frank wecondfn the motion . Unto is 4-0-O. Protack issue: Caulking: The dispute is over the need to caulk joints that ranged from 1/2" ~ 3/4" instead of the predicted 3/2" openings. The contractors are requesting additional money for the excessive use of caulking materials, however the contractor hasn't responded to the proper grievance procedure to redeem their money. This problem is between Granger and the cnntractor. A request has been made to go to arbitration when a decision is made it will he up tn the Town to decide how they want to handle this. Meeting with Joe Sarro: During a walk through the following items were recommended: 1. Cover all boards with Glass P, Break up continuous sections 3, Buy fire resistant paper to display 4. Take down boards when they are near pull stations 5. Remove from immediate area to egress doors Steve has a copy of the Fire Department memo concerning the rules and regulations. Frank makes a motion to direct Steve RVr � �/ 7 �v,.� U�' » oo^ ����� NAR 2S p// �� ' A [) /��v - M Ah\�.`/'»ri Ft, ,^ooS8�Ak!;° ~'`"'/v"ETT0 �.~ Pg 2 Municipal Building C`mmrittee 3/1O/93 or Emil Giordano to meet with Town Manager and Chief Sliney and discuss the issue of tack boards, Seconded by Andrea Michellt 4-0-0 The architects reconmvsnd that they can move the pull stations ANb wY install glass over the questionable areas Nu action will be taken until we have further information back from the meeting, Food Service: the preliminary price from Foodservice on the tilting kettle and dolly is $11,922 with no credit given all the fryer. The total cost for this revision including plumbing and supervision is $16,097. Frank makes a motion to accept the price and have Granger negotiate their fee. Chuck seconds. 4-1-0 ,Rugs: 7he area rugs need to nvsst the handicap code being � that they are secured on all sides and taught Andrea makes l a nmtion that we authorize Integrated Design to bind all sides of the rugs and bond rubber to the backs (making them non-skid). Lou seconds 5~0-0 The meeting is adjourned at 8:45 p.m. The next scheduled meeting is for March 24, at Mansfield High SnSool. Mansfield Municipal Building Con,mittee `^<|�P�� �(/) Town of Mansfield MA 02O18 ^/ /?x Minutes of mee�ing of 2/26/92 ^9 ~o ��ge MacCaffriiordano (EG), F. Guardabascio (FG), L. Amoruso (LA), AMiche�i (AM) Clerk of the works: J. D'Keefe Integrate6 Design: N. Lohrer HMFH: F Juusola, C. Tra�nor Schools: R. Gurek Meeting called to order at 7:()0 at Jordan -Jackson ElementarV cI mplex by the chairman. Read general correspondence. Read minutes of previous meeting. Motion made (E.G) secondcd (LA) �nd votaccept ill inutes as read. Motioted 5 to pay $1O4.49 for �nstallation o{ phone (saf�ty reasons) in �levator. Iniegrated Desiyn (N. Lohrer) presented current status on interior furnishings. Signed several pre approved purchase orders for interior equment. Read proposal #44 for canges to kitchen equipment to delote fryer and add large cooking pot. R. Gurek informed commiml I; Iook bid. Discussed reqvirements for need of rail in library win�ow '`overhang" areas (presently none however, lower heat�r iostallation should meet code rudent safety reasons Motion male (EG), seconded (LA> and v; ed invoices in the amourt of $1350 from the clerk of the works Motion made (EG), seconded (LA} and voted 5-O-(. to pay an invoico of $477.�8 for diesel fuel for the emergency generator. /' �1ansfield Municipal Building Committee \ Town of Mansfield, MAO2048 Minutes of meeting of 2/26�92 Page 2 of 2 Read letter from E. J. �lyn: regarding costs oi ovcrsights in building �esign, A credit will be issued for ��8�S3 to �MFH. Motion wade (EG), seconded (LA} and voted 5-0-i I to present offer to town manager to resolve differences between F�ynn and MGC �. Juusola 7resented current s�atus of tack board issueHe �alked to NPA and they indicate the boards due meet code. HMF� still invIt; UMFH also indicates Protrk feels the caulking costs exceeded oriGinal costs and will pursueap fees still on hold in an escrow account. HMFH will make a proposal to add walkway to Robinson for coordination with unfinisI d exterior landscaping Change order presented in the amount of $3902 for mats and tank covers is unsuitable Valance in boys�girls room still in progress. Griffin indicates they will not install brack�ts even though they own bracket installation per contract. Clerk to f�llo: up �' Discusse� 1:13ui|diminor issues. noted requirement for several additional master master keys. Motion made (EG}, s�conded (L��} and voted 5to adjourn meeting. He�ting adjourned at 9:3t..) P.M FGuardabascio �arch 1O 11/92