HomeMy WebLinkAboutMBC 12/05/1995MUNICIPAL BUILDING COMMITTE
MINUTES
DECEMBER 59 1995
MEMBERS PRESENT: Bill Antoine, Larry Carpenter, Rich Feeley,
Arthur O'Neill, Doug Ronald*, Ed Shney, Bill Williams**, Dave Young
MEMBERS ABSENT: Dianne Royle, Judy Scott
GUESTS PRESENT: Don Walter - Strekalovsky and Hoit, Chris
Marion - Asst. to the Town Manager
MINUTES: November 28, 1995
MOTION: To accept as written. (Antoine/Feeley) 6-0-0
CORRESPONDENCE:
• A letter to Mr. Robert Angland from W. Williams,(CC:MBC) RE: West
Mansfield Fire Station.
• A letter to S. MacCaffrie from D. Royle (CC:MBC) RE: Letter of thanks.
• An invitation to the Holiday Open House at the offices of Strekalovsky
and Hoit.
• A memo to B.O.S. from D. Young RE: Motion on Reserve Fund Transfer
with letters of support from the Police and Fire Departments.
• A memo to the Boards and Committees from A. Gazzolo RE: Warrant
Articles.
• A memo to all Department Heads from W. Williams RE: Budget
Narratives
• A memo to M. Doherty from R. Gurek RE: Capital Improvement Projects
-FY97 - School Department.
• A letter to D. Nicoletti from A. Fletcher (FYI:MBC) RE: School project
financing.
MBC- Minutes 12-5-95 1
A copy of the bond for A&M Roofing effective 11-30-95.
MUNICH'AL PROJECTS;
Chairman Young and MBC member Larry Carpenter attended the
Selectmen's meeting on 11-28 to give a report on the status of the municipal
projects. The B.O.S. voted to support FINCOM Reserve Fund Transfer -for
the West Mansfield Fire Station.
WEST MANSFIELD FIRE STATION:
The Committee discussed the cost savings measures for the station, some of
these items included; the casework in the "day room", switching the
thermostats from wall mounted units to self contained thermostats. Other
items will be reviewed as the work progresses. There's a reserve of 2% for
contingencies.
MOTION: To authorize the Chairman to meet with Dan
Clifford, DPW Director to commence work on the West
Mansfield Site being, grub work, stumping, silt fencing,`
and strip the loam. (Antoine/Sliney) 5-0-0
MOTION: To ask the Town Manager to enter into contract with
Consigli Construction for the construction of the West
Mansfield Fire Station. (Sliney/Antoine) 5-0-0.
TOWN HALL:
Discussion with the Town Hall Contract, It would be signed on December
19th, for the full amount with change orders included for the major items
identified in the letter from Strelcalovsky and Hoit dated November 14, 1995.
The HVAC items have been reviewed and this will be coordinated through
TCI and the low bidder. Rich asked why the HVAC system was not
modified prior to going out to bid. Larry asked that the costs be reviewed
with the sub -contractors to seek additional reductions. The canopy entrance
should be modified to further reduce cost.
MBC- Minutes 12-5-95 2
Strekalovsky and Hoit will be here next week as a work shop. We will be
asking for at least $100,000 in prepared change orders for execution. If need
be we can ask Consigli and the second low bidder to hold their bids for
additional time if an appeal to the variance is riled.
The MBC is in unanimous agreement to move forward with the plans.
POLICE STATION:
(* D. Ronald arrived at 8:20)
Allen Lieb will not be continuing as the architect for the design team, we will
be planning a workshop with the Police Chief and work on a strategy for
future of the Police Station. Strekalovsky;and Hoit will be in charge of the
redesign of the Police Station. This will be worked out and reports will be
forwarded to the MBC in the near future. We need to table this for the end of
January. Concerti was expressed with the budget of the police facility.
Members of the MBC expressed that they want to realize all conceivable
savings so that the budget can be increased in the Police Station. The Police
Station design will be modified and new cost estimates will be obtained prior
to going out to bid.
G
Selectman Ronald asked if we could move forward with the demolition Afthe
Park Row Building. The MBC is 'concerned if we proceed we will be putting
the Town at risk if we begin any work prior to obtaining the variance from the
ZBA. The appeal deadline is December 19th. Selectman Ronald relayed that
members of the'B.O.S. are concerned that the Police Station project will not
be completed as intended. Chief O'Neill expressed support for the MBC and
their ability to work out an acceptable solution as well as he is in support of
the other municipal projects.
(** W. Williams arrived at 9:05p.m..
The Town Manager gave report on the Finance Committee. The Finance
Committee voted 5-0-0 to authorize the reserve fund transfer for the West
Mansfield Fire Station. A contract between Consigh Construction Corp. and
the Town of Mansfield has beenprepared. It will be reviewed by Town
Counsel prior to signing.
MBC- Minutes 12-5-95 3
Negotiations with the applicant for the clerks position is on-going. The
i Committee and the Town Manager discussedJ allotment of time
between the construction projects. 141 e
The Town Engineer will begin work m January and he may be available to
monitor testing and compacting of fill.
MOTION: To adjourn at 9:30p.m. (Carpenter/Antoine) 6-0-0
Respectfully submitted,
Maureen R. Doherty
Secretary
Signature o Chair Date of Acceptance - Vote