HomeMy WebLinkAboutMBC 03/26/1996MUNICIPAL BUILDING COMMITTEE
MINUTES
MARCH 26,1996
�IIU
MEMBERS PRESENT: Bill Antoine, Larry Carpenter, Rich Feeley, Jim
Liddick, David Young, Bill Williams, Ed Sliney(F), Norman Mahana(TH)
MEMBERS ABSENT: Amos Robinson(F), Judy Scott(TH), Andy Gazzolo
GUESTS PRESENT: Roger Hoit - Stekalovsky and Hoit, Dan Clifford -
DPW Director, Lee Azinheira -- Town Engineer, Lou Bartolini - 'Clerk of
Works, Anthony Consigli and Greg Burns - Consigli Construction.
Meeting began at 7:00 pm. in Room 101 of Mansfield High School
R. Feeley offered to help D. Young take notes during the meeting as M.
Doherty was away on vacation.
MOTION (Antoine/Feeley) at 7:08 p.m: To enter executive session for the
purpose of contract negotiations with Consigli Construction and to
discuss the reputation of the DPW Director in regard to the Towns work at
the West Mansfield Fire Station site; to return to open session upon
completion.
All seven members were polled and it was unanimous to enter'( 7-0-0)
Norman Mahana arrived at 7:15 to his first MBC 'meeting. Upon, being
notified that it was an executive session he wanted to be recorded as
being opposed. R� VaCfleA"r5 fi re"-, , cecaNt:��r
p c Cts Std ca Lx-� fa -ern F.s! y�L-9 C�o
MOTION (Antoine/Carpenter) at 8:30 p.m: To close the executive session
e
and return to open session. All members were polled and it was
unanimous to return ( 8-0-0).
Several guest left the meeting at this time.
PARK ROW/ TOWN HALL
E
Roger Hoit reviewed the latest quote for the removal of asbestos pipe in
the Park Row Building. The estimate last week was $1075. The revised
cost is $585.
MOTION (Feeley/Antoine) to approve Ramtech quote for asbestos removal
of $585.00. Approved 7-0-0.
L. Carpenter asked that all small change, orders be processed together on a
monthly basis.
R. Hoit stated the question on the vault wall thickness had been clarified
and there was a detail on the drawings,Similarly there are no outstanding
issues on the wall insulation.
R. Hoit presented the first pay request from Consigli and he recommends it
be „paid as he has reviewed it and L. Bartolini has as well.
MOTION (Feeley/Carpenter) to approve the first pay request in the amount
of $166,082.89 (net amount) for the Town Hall project. Approved 7-0-0.
R. Hoit reviewed the rendering of the Town Hall with the green windows
and with the boysenberry windows. After some discussion it was agreed
that the boysenberry looked best and that green doors should be
considered.
MOTION (Antoine/ Carpenter) to approve boysenberry for the window frame
color. Approved 7-0-0.
A sample of the window was reviewed and discussed
WEST MANSFIELD FIRE STATION
R. Hoit presented the first pay request from Consigli and he recommends it
be paid as he has reviewed it and L. Bartolini has as well. There was some
discussion about the amount of fill being claimed.
MOTION (Feeley/Antoine) to approve the first pay request in the amount of
$57,651.25 (net amount) for the West Mansfield Fire Station project.
Approved 6-1-0 (Carpenter no)
J Liddick,expressed a concern for the potential lead time on the vista wall
and R. Hoit will look into it. Several shop drawings have recently been
received. Many of the new interior walls have now been framed.
JORDAN/JACKSON SCHOOL
Only the five MBC members, B Williams and E Sliney remained (9:10p.m.)
A change order for the snow guards being installed on the J/J woof has
been received. It involves adding the guards to the upper roof over the
core connector. These were not, part of the original quote but all believed
they should be there.
MOTION (Antoine/Carpenter) to accept the change order for the additional
snow guards for an all inclusive amount not to exceed of $4000. Approved
(6-0-0).
D. Young will discuss with Rick Goddeau It was also felt that the
reported holes in the roof should be evaluated more by the school
department as a thorough roof analysis was recently completed. Any
repairs should be via maintenance costs.
MISC.
D. Young will follow-up with R Hoit about the qualifications of the
compaction testing agency.
D. Young reviewed a job description for Committee Administrator to the
MBC. After some discussion and comments it was agreed that minor
revisions would be made and then it will be submitted to the Town
Manager. Set office hours will also be listed.
MOTION (Antoine /Carpenter) to adjourn at 9:45 p.m. Approved 6-0-0.
Respectfully submitted
David F Young
Signature of Chair Date of Acceptance - Vote
�l�
.MUNICIPAL BUILDING COMMITTEE
EXECUTIVE SESSION MINUTES
MARCH 26,1996
MEMBERS PRESENT: Bill Antoine, Larry Carpenter, Rich Feeley, Jim
Liddick, David Young, Bill Williams, Ed Sliney(F), Norman Mahana(TH)'
MEMBERS ABSENT: Amos Robinson(F), Judy ;Scott(TH), Andy Gazzolo
GUESTS PRESENT Roger Hoit - Stekalovsky and Hoit, Dan Clifford -
DPW Director, Lee Azinheira - Town Engineer, Lou Bartolini - 'Clerk of
Works, Anthony Consigli and Greg Burns - Consigli Construction.
Meeting began at 7:00 p.m. in Room 101 of Mansfield High School
R. Feeley offered to help D. Young take notes during the meeting as M. Doherty was away on
vacation.
MOT
neg
reg<
Corr
All
Non
exel
k'.
R. h
claii
belie
Ant
7:41
�N (Antoine/Feeley) at 7:08 p.m: To enter executive session for the purpose of contract
iations'with Consigli Construction and to discuss the reputation of the DPW Director in
I to the Towns work at the West Mansfield Fire Station site; to return to open session upon
etion.
den members were polled and it was unanimous to enter ( 7-0-0)
3n Mahana arrived at 7:15 to his first MBC meeting. Upon being notified that it was an
Live session he wanted to be re o/r�ded as being o posed.
&Lisj'01"
t reviewed the issues ✓being raised about the claim for additional fill by Consigli and their
that the DPW has not lived up to their obligations in the process. D. Clifford stated he
es all work done by the town was correct and he stands behind it
my Consigli and Greg Burns of Consigli Construction (Consigli) joined the discussion at
p.m.
D. Young had all in attendance introduce themselves and who they represented. He then asked A.
Consigli to state their claims. They believe there are two main issues: 1) the town owns the fill
and compaction of the material in the layer of loam stripped from the site and 2) the town
(subcontractor Dorrance Excavating) over excavated the site while stripping and grubbing the
site.
D. Young asked them to point out in the specifications or on the drawings where they believe it
states the first claim.: G. Burns said he was unprepared to do so but would in the future. He is
adamant that they carried only 3,000 cubic yards(cy) of fill in the main project and about
3,000 cy more in Alternate 1 which is work the town is performing. No documentation was
provided.
D. Clifford defended his contract work in regard to stripping and grubbing the site. He stated his
estimates originally were for 10,000 cy to do the whole project and bring the site up to
finished grade. His current work includes no fill.
Some heated discussions took place regarding dewatering techniques utilized by various parties
and who owned what. Questions about whether a dry surface was required prior to Consigli
starting. D. Clifford made it clear that he only owned enough dewatering to remove the stumps
and topsoil.
L. Carpenter stated that the MBC has always had the intent to not have the town do any
compacting ,of soils for which the contractor would then be required to do compaction on top of it.
The ability to define liability would be to great if that occurred.
R. Holt stated clearly his position that the work at the site has been done in accordance with
standard practice and that a geotechnical engineer certified the conditions of the site prior to the
placement of any fill. A certified testing lab is nowperforming compaction testing. A. Consigli
finally agreed the work at the site is acceptable.
G. Burns stated that if they pursue their claim for payment of fill it will also include down time,
additional dewatering, and other related items.
A. Consigli thought an amount of about 1,400 cy was acceptable for the town to pay for at
$12.50 per cy. D. Young stated nothing could be agreed to until some documentation to
substantiatetheir claims was provided.
R. Hoit suggested that Consigli meet with L. Azinheira and L. Bartolini and himself to review
available survey data. All agreed this would be beneficial and those parties should agree on the
quantities ( fill for topsoil layer and over excavation). The values will be presented at the next
MBC meeting.
MOTION (Antoine/Carpenter) at 8:30 p.m:' To close executive session and return to open
session. All members were polled and it was unanimous to return (;8-0-0).
Respectfully submitted
David F. Young
-q-Z-�
Signature of Chair Date of Acceptance - Vote
Date of MOTION and ACCEPTANCE TO RELEASE ----
lGY-'