HomeMy WebLinkAboutMBC 03/26/1996MUNICIPAL BUILDING COMMITTEE MINUTES MARCH 26,1996 �IIU MEMBERS PRESENT: Bill Antoine, Larry Carpenter, Rich Feeley, Jim Liddick, David Young, Bill Williams, Ed Sliney(F), Norman Mahana(TH) MEMBERS ABSENT: Amos Robinson(F), Judy Scott(TH), Andy Gazzolo GUESTS PRESENT: Roger Hoit - Stekalovsky and Hoit, Dan Clifford - DPW Director, Lee Azinheira -- Town Engineer, Lou Bartolini - 'Clerk of Works, Anthony Consigli and Greg Burns - Consigli Construction. Meeting began at 7:00 pm. in Room 101 of Mansfield High School R. Feeley offered to help D. Young take notes during the meeting as M. Doherty was away on vacation. MOTION (Antoine/Feeley) at 7:08 p.m: To enter executive session for the purpose of contract negotiations with Consigli Construction and to discuss the reputation of the DPW Director in regard to the Towns work at the West Mansfield Fire Station site; to return to open session upon completion. All seven members were polled and it was unanimous to enter'( 7-0-0) Norman Mahana arrived at 7:15 to his first MBC 'meeting. Upon, being notified that it was an executive session he wanted to be recorded as being opposed. R� VaCfleA"r5 fi re"-, , cecaNt:��r p c Cts Std ca Lx-� fa -ern F.s! y�L-9 C�o MOTION (Antoine/Carpenter) at 8:30 p.m: To close the executive session e and return to open session. All members were polled and it was unanimous to return ( 8-0-0). Several guest left the meeting at this time. PARK ROW/ TOWN HALL E Roger Hoit reviewed the latest quote for the removal of asbestos pipe in the Park Row Building. The estimate last week was $1075. The revised cost is $585. MOTION (Feeley/Antoine) to approve Ramtech quote for asbestos removal of $585.00. Approved 7-0-0. L. Carpenter asked that all small change, orders be processed together on a monthly basis. R. Hoit stated the question on the vault wall thickness had been clarified and there was a detail on the drawings,Similarly there are no outstanding issues on the wall insulation. R. Hoit presented the first pay request from Consigli and he recommends it be „paid as he has reviewed it and L. Bartolini has as well. MOTION (Feeley/Carpenter) to approve the first pay request in the amount of $166,082.89 (net amount) for the Town Hall project. Approved 7-0-0. R. Hoit reviewed the rendering of the Town Hall with the green windows and with the boysenberry windows. After some discussion it was agreed that the boysenberry looked best and that green doors should be considered. MOTION (Antoine/ Carpenter) to approve boysenberry for the window frame color. Approved 7-0-0. A sample of the window was reviewed and discussed WEST MANSFIELD FIRE STATION R. Hoit presented the first pay request from Consigli and he recommends it be paid as he has reviewed it and L. Bartolini has as well. There was some discussion about the amount of fill being claimed. MOTION (Feeley/Antoine) to approve the first pay request in the amount of $57,651.25 (net amount) for the West Mansfield Fire Station project. Approved 6-1-0 (Carpenter no) J Liddick,expressed a concern for the potential lead time on the vista wall and R. Hoit will look into it. Several shop drawings have recently been received. Many of the new interior walls have now been framed. JORDAN/JACKSON SCHOOL Only the five MBC members, B Williams and E Sliney remained (9:10p.m.) A change order for the snow guards being installed on the J/J woof has been received. It involves adding the guards to the upper roof over the core connector. These were not, part of the original quote but all believed they should be there. MOTION (Antoine/Carpenter) to accept the change order for the additional snow guards for an all inclusive amount not to exceed of $4000. Approved (6-0-0). D. Young will discuss with Rick Goddeau It was also felt that the reported holes in the roof should be evaluated more by the school department as a thorough roof analysis was recently completed. Any repairs should be via maintenance costs. MISC. D. Young will follow-up with R Hoit about the qualifications of the compaction testing agency. D. Young reviewed a job description for Committee Administrator to the MBC. After some discussion and comments it was agreed that minor revisions would be made and then it will be submitted to the Town Manager. Set office hours will also be listed. MOTION (Antoine /Carpenter) to adjourn at 9:45 p.m. Approved 6-0-0. Respectfully submitted David F Young Signature of Chair Date of Acceptance - Vote �l� .MUNICIPAL BUILDING COMMITTEE EXECUTIVE SESSION MINUTES MARCH 26,1996 MEMBERS PRESENT: Bill Antoine, Larry Carpenter, Rich Feeley, Jim Liddick, David Young, Bill Williams, Ed Sliney(F), Norman Mahana(TH)' MEMBERS ABSENT: Amos Robinson(F), Judy ;Scott(TH), Andy Gazzolo GUESTS PRESENT Roger Hoit - Stekalovsky and Hoit, Dan Clifford - DPW Director, Lee Azinheira - Town Engineer, Lou Bartolini - 'Clerk of Works, Anthony Consigli and Greg Burns - Consigli Construction. Meeting began at 7:00 p.m. in Room 101 of Mansfield High School R. Feeley offered to help D. Young take notes during the meeting as M. Doherty was away on vacation. MOT neg reg< Corr All Non exel k'. R. h claii belie Ant 7:41 �N (Antoine/Feeley) at 7:08 p.m: To enter executive session for the purpose of contract iations'with Consigli Construction and to discuss the reputation of the DPW Director in I to the Towns work at the West Mansfield Fire Station site; to return to open session upon etion. den members were polled and it was unanimous to enter ( 7-0-0) 3n Mahana arrived at 7:15 to his first MBC meeting. Upon being notified that it was an Live session he wanted to be re o/r�ded as being o posed. &Lisj'01" t reviewed the issues ✓being raised about the claim for additional fill by Consigli and their that the DPW has not lived up to their obligations in the process. D. Clifford stated he es all work done by the town was correct and he stands behind it my Consigli and Greg Burns of Consigli Construction (Consigli) joined the discussion at p.m. D. Young had all in attendance introduce themselves and who they represented. He then asked A. Consigli to state their claims. They believe there are two main issues: 1) the town owns the fill and compaction of the material in the layer of loam stripped from the site and 2) the town (subcontractor Dorrance Excavating) over excavated the site while stripping and grubbing the site. D. Young asked them to point out in the specifications or on the drawings where they believe it states the first claim.: G. Burns said he was unprepared to do so but would in the future. He is adamant that they carried only 3,000 cubic yards(cy) of fill in the main project and about 3,000 cy more in Alternate 1 which is work the town is performing. No documentation was provided. D. Clifford defended his contract work in regard to stripping and grubbing the site. He stated his estimates originally were for 10,000 cy to do the whole project and bring the site up to finished grade. His current work includes no fill. Some heated discussions took place regarding dewatering techniques utilized by various parties and who owned what. Questions about whether a dry surface was required prior to Consigli starting. D. Clifford made it clear that he only owned enough dewatering to remove the stumps and topsoil. L. Carpenter stated that the MBC has always had the intent to not have the town do any compacting ,of soils for which the contractor would then be required to do compaction on top of it. The ability to define liability would be to great if that occurred. R. Holt stated clearly his position that the work at the site has been done in accordance with standard practice and that a geotechnical engineer certified the conditions of the site prior to the placement of any fill. A certified testing lab is nowperforming compaction testing. A. Consigli finally agreed the work at the site is acceptable. G. Burns stated that if they pursue their claim for payment of fill it will also include down time, additional dewatering, and other related items. A. Consigli thought an amount of about 1,400 cy was acceptable for the town to pay for at $12.50 per cy. D. Young stated nothing could be agreed to until some documentation to substantiatetheir claims was provided. R. Hoit suggested that Consigli meet with L. Azinheira and L. Bartolini and himself to review available survey data. All agreed this would be beneficial and those parties should agree on the quantities ( fill for topsoil layer and over excavation). The values will be presented at the next MBC meeting. MOTION (Antoine/Carpenter) at 8:30 p.m:' To close executive session and return to open session. All members were polled and it was unanimous to return (;8-0-0). Respectfully submitted David F. Young -q-Z-� Signature of Chair Date of Acceptance - Vote Date of MOTION and ACCEPTANCE TO RELEASE ---- lGY-'