HomeMy WebLinkAboutMBC 10/01/1996r it=CU
i 1 _,p tii Lu
MUNICIPAL BUULDING COMMITTEE
OCTOBER 1, 1996 96 OCT 21 PH 3: 25
MINUTES
E iAi 1 is Lid
MASSANLISETTS
MEMBERS PRESENT: William Antoine, Richard Feeley, James Liddick, David
Young, William Williams
GUESTS PRESENT: Ron Ashton - Keyes Associates, Louis Bartolini - Clerk of
the Works - Municipal Projects
MINUTES: The Minutes of September 24, 1996
MOTION: To accept as amended. (Antoine/Liddick) 4-0-0
INVOICES: The following invoices were submitted for payment
vendor
Pra'eet
Amount
A royal
Keyes Associates
Robinson School
$12,556.24
WA/JL 4-0-0
Louis Bartolini
Payroll - Clerk
2,300.00
RF/WA 4-0-0
Maureen Doherty
September - Payroll
1,320.56
WA/RF 4-0-0
September, 1996 Monthly - Budget Summary - Municipal Projects - MBC Payroll
General
• Meeting memo to members
• Memo to all Boards and Committees RE: Master Plan Update
• Memo to Judy Scott (FYI:MBC) RE: Surplus State Property
• Memo to L. Pasch from D. Young RE: Library Roof
West Mansfield Fire Station
• Transmittal of Casework, Kitchen Cabinets and Countertops - shop drawings
• A letter to D. Walter from A. Bacchiocchi (CC:MBC) RE: Antenna Drawings
School Projects
• A letter to J. Miller from D. Young RE: H -Roof information
• A letter to R. Mangiaratti from M. Doherty RE: review of proposal for contract
• A letter to the MBC from J. Loughnane W. B. Hunt Co. RE: Requests for bid specs
• A memo from D. Young RE: Bid openings -Robinson School
MBC Minutes - October 1, 1996 1
• A letter to W. Williams from Beckwith Elevator RE: Filed Sub bids
f . • A letter to Beckwith Elevator from W. Williams (FYI:MBC)RE: Filed Sub bids
• A letter to Beckwith Elevator from M. Doherty RE: Filed sub bids
Field Reports and Clerks Reports
• Addenda #4 - Robinson School - September 25, 1996
• Mansfield Town Hall - Weekly and Summary Reports - September 9 - September 27,
1996
• West Mansfield Fire - Weekly and Summary Reports - September 9 - September 27,
1996
MUNICIPAL PROJECTS:
Clerk's Update
Mr. Louis Bartolini, Clerk of the Works gave an overview of the project schedule for the
West Mansfield Fire Station and the Mansfield Town Hall construction projects.
West Mansfield Fire Station:
Paving will be done this week. The sprinkler plans have been submitted for review. The
Clerk expressed concern over the removal of the pressure pump. The Committee did not
give authorization for any alternations fiom the plans that were submitted and approved
and amended by the TCI and the Fire Department. The clerk will follow up with the
architect. Finish work is being completed. Ceiling trim is being installed, the painting is
almost complete, the panels in the apparatus bays are nearly installed. There was
discussion concerning the installation of the antenna.
MOTION: To authorize the Chau to execute the Change Order for the
installation of the tower and pad not to exceed the budgeted
amount (Liddick/Feeley 4-0-0)
The Clerk will be on site for the paving. The interior doors are installed. The Committee
reviewed drawings L -3A in regards to the flow of traffic for apparatus exiting bay 1
MOTION: To send a letter to the Chief and asked him to review the entrance
and exit for Bay 1 as staked on site and shown on L -3A and to
respond to the Committee in writing that this layout gives adequate
access for his vehicles to maneuver prior to commencement of
paving.(Feeley/Liddick 4-0-0)
(NOTE: paving is to be begin on October 2, 1996 - timing is critical)
MBC Minutes - October 1, 1996
The committee discussed the need for the fence, around the electrical transformer, and
why it became an issue at this late date.
MOTION: To ask Consigli to give us a price to install the existing fence with
the gate that is being stored on site and respond as soon as
possible. (Feeley/Liddick 3-1-0) Young opposed
Landscaping, loam, and screening at the West Mansfield Fire Station are to be done by
Consigli Construction Co. Schedule for completion is still on target.
Town Hall:
The air handling units were installed today. Mechanical, plumbing and painting are
progressing well. Circulating pumps will be installed this week. The rough inspections
are progressing well. Windows are being installed next week, the masonry work on
connector is finished and the staging will be removed.
The Committee discussed the situation with the roof drains. It was determined that there
is a need to add two additional drains. The cost of the additional roof drains is
approximately $4,000.
MOTION: To authorize the chairman to approve the change order for the roof
drains not to exceed $4500. (Feeley/Antoine 4-0-0)
The paving will be done by next week on the Town Hall site.
The Committee reviewed the of request of the Town Manager to fund the additional
wiring costs between the Town Hall and Memorial Hall.
The MBC reviewed the project budget and it was determined that there are sufficient
funds in the contingency balance to find this request. There would still be a balance in the
contingency allowance to give the allocated amounts to the Police Station and Central Fire
Station.
MOTION: To approve the request for $8,000 for wiring expense between
Town Hall and Memorial Hall. (Liddick/Feeley) 4-0-0
CLERK OF THE WORKS INTERVIEWS:
The Committee interviewed Alan Post, Walter Parker, and Richard Moss for the clerk's
position. Each applicant gave an overview of himself and his professional
accomplishments. The applicants and the committee asked and responded to questions for
45 minutes.
MBC Minutes - October 1, 1996
The Committee will be doing background and reference checks on the finalists prior to a
decision being made.
The Committee reviewed the dedication plaques for the Town Hall and Fire Station.
There was discussion concerning the parties to be named on the buildings. On the past
projects only the Municipal Building Committee and associate members were listed. The
Committee discussed if all individuals ever associated with the projects were to be
included on the plaque. It was the consensus of the Committee not to include all past
associate members or regular members of the AMC on the plaque. It was their opinion
that all had served well in their capacities, but there had been many changes in membership
since the beginning of the projects and it was not feasible to include all.
Respectfully submitted,
Maureen R Doherty -
Administrative Secretary
Signature of Chair''
MBC Minutes - October 1, 1996
Date of Acceptance - Vote