Loading...
HomeMy WebLinkAboutMBC 06/17/1997C. F i 'D 1C17 MUNICIPAL BUILDING COMMITTEE MINUTES 57 JUL -9 Fit 2:06 JUNE 17, 1997 1"'L0 SS'A. 11 I i3�v�<.���=„3E1 IS MEMBERS PRESENT: Chairman Carpenter, Members Antoine, Feeley and Liddick Maureen R. Doherty Administrative Secretary MINUTES: The minutes of June 10, 1997 were submitted for review. MOTION: To approve the minutes of June 10, 1997 as written. (WA/RF 3-0-0) INVOICES: The following invoices were submitted for approval. Vendor Project Amount Vote W.L. Stearns MBC 17.00 JL/RF 4-0-0 Lechmere MBC 187.95 JL/RF 4-0-0 Mini Warehouse Robinson 60.00 JL/RF 4-0-0 CORRESPONDENCE: • A notice regarding Recall of Gas Solenoid Product 0 Town Hall • A memo to M. Doherty from S. MacPhee RE: lunch room screen • A memo to L Carpenter from G. Burns RE: Town Hall lighting • A memo to R. Boucher from L. Carpenter RE: Punch List Review • A memo to R. Boucher from L. Carpenter RE: ,Signs- Town Hall • A memo to A. Consigh from L. Carpenter RE: Warranty issues Rugs/Ceiling Tiles • A memo to R Hoit from L. Carpenter RE: HVAC Noise Level; (A temporary fix may be necessary until the noise problem is completely resolved.) Municipal Building Committee Minutes June 17, 1997 Page 1 of 3 Police Station • A memo to R. Hoit from G. Brait RE: Police & Fire Stations concerns (Mr. Hoit gave an update on the status of the bid. There will be modifications on the cellblockfrom 8" to 6". The geotech firm has determined that the sub floor materials will support bearing walls. • A memo to MBC from B. Cook RE: site plan changes • A letter to R. Boucher from A. Bacchiocchi RE: Building permit • Copies of submittals for items requested in Building permit letter • A Copy of the schedule of values for Police Station project from BBC • A telephone conversation report TCl/R. Hoit RE: sprinkler (the design has been completed and is being reviewed by the MED) • A memo to R. Hoit from L. Carpenter RE: Permit issues • A memo to list from L. Carpenter RE: Project Meetings Robinson School Proiect • A letter to Keyes from JTC RE: removal of unsuitable materials. Motion: To authorize the contractor to proceed with the removal of excess unsuitable soils in accordance with the contract Documents. (RF/JL 4-0-0) • A memo to the MBC from W. Parker RE: Flooring (Members Feeley and Liddick stated that an accent stripe should be added between the old and new. The integrity of the VAT should be protected.) • A memo to L. Fish from L. Carpenter RE: Craft Fair(the committee reviewed this request and determined that the',QMS gym would be available at this time) • A memo to R. Ashton from L. Carpenter RE: SK Drawings • A fax memo to R. Ashton from JTC RE: Kitchen (the committee reviewed this letter and will send a memo to Mr. Ashton requesting that the MBC be brought up to date on the problem and solution at next week's meeting. • Daily Reports from 6-09-6-13 POLICE STATION: Mr. Hoit gave an overview of the police station project. The contractor has applied for a permit. Chairman Carpenter asked about the questions that have raised by the mechanical inspector. The Chair stated that during a conversation with Inspector Madan that he requested to have these questions put in writing and we will forward these to the TCI and the contractor. Municipal Building Committee Minutes June 17, 1997 Page 2 of 3 r TOWN HALL: There was discussion regarding the Trane air unit.. The architect stated that this excessive noise might be an indication of a system failure. Until the problem has been identified temporary measures will be made to quiet the system. There was a general discussion concerning the lack of cooperation and commitment to finish out this project. Member Liddick asked about notification to the bonding company regarding Consigh'sperformance. The Chair stated that there are items that are listed on the contract documents are not complete. The landscape has not been accepted. There is a water ban in effect at this time. The Committee is not happy with the patchwork on the front lot. The Chair stated that this work is not acceptable. The patch and cut was not done properly. The MBC would like to see Consigh make a recommendation on the solution to fix this problem. The committee reviewed the items on the punch list and it was their opinion that the list was about 50% complete. The committee will ask for the `following additional items: Exterior light in the rear lot, So. Main Street entrance, Roof pads A/C for telephone room The Chair stated that the DPW is concerned with the lack of information that has been provided in the O & M maintenance manuals. He requested that the architect insure that all documentation and training will be provided for as specified in the contracts. The architect stated that he is awaiting information from the architectural access board regarding the variance on the ramp. MOTION: To adjourn at 8:45pm. Respectfully submitted, Richard Feeley - Clerk Si tore of Cha' Date of acceptance - vote Municipal Building Committee Minutes June 17, 1997 Page 3 of 3