HomeMy WebLinkAboutMBC 07/08/1997Municipal Building Committee t,� a F 1) 5q Minutes July 89 1997 ,_LCA uS:, ��ilS 7TS Members Present: Acting Chair Richard Feeley, Members Liddick and Young Maureen Doherty Administrative Secretary Guests Present: Emil Giordano Chair, School Committee, Walter Parker - Project Coordinator, Steve MacCaffrie, Steve Loeper — JT Callahan Construction Company, Ron Ashton Keyes Associates. Invoices: The following invoices have been submitted for approval Vendor Project Amount Vote Hartford Office Supply MBC Supplies - FY97 budget $ 174.06 DY/JL 3-0-0 BBC Police Station $79,587.20 ` DY/JL 3-0-0 Walter Parker Robinson $'2,200.00 DY/JL 3-0-0 Correspondence: • A memo from Haller Testing Laboratories RE: Structural Report • A memo to Boards and Committees from Charter Commission RE: July 21St meeting-; • A memo to MBC from R. Boucher RE: Library Roof Repairs (send memo stating that this is not structural) • A memo to the MBC from L. Sciarappa RE: windows in kindergarten classroom. (discussion concerning installation; of bookshelf send memo regarding the windows will be blocked up with wood shelving • A memo to R Hoit from W. Schreiter RE: Punch List • A memo to J. Pacheco from W. Schreiter RE: punch list • A memo to R. Hoit from W. Schreiter RE: additional work • A memo to F. Monti from W. Schreiter RE: punch list • A report from TCI — RE: Chiller unit status report (the Town Manager stressed his opinion that the work has not been progressing as scheduled Members Liddick and Young asked if the Board of Health will take additional readings) • A letter to J. Gauthier from W. Schreiter RE: Electrical Work M.B.C. Minutes 7-8-97 Page 1 of 4 • A fax to MBC from BBC RE: Police Station Sprinkler system • A fax to MBC from BBC RE: Police Station Sprinkler system • A memo to Mike Ahern from TCI RE: Chiller • A memo to L. Carpenter from R. Hoit RE: Police Station Sprinkler system • A memo to W. Shuley from BBC RE: Plumbing Inspector's request for additional manholes • A memo to MBC from TCI RE: sprinkler system Robinson School Proiect: Mr. Ron Ashton` reviewed the Construction Meetings Minutes number 22 & 23. There was discussion on the awarding of the bids for the elevator. We will postpone this decision because we need to be sure that the elevator cab will meet the code requirements for the inclusion of a stretcher. MOTION: To have Keyes award the contract to Keystone Elevator Company. DY/JL 3-0-0 The size of the cab will be verified and information will be transmitted to the contractor. The Municipal Building Committee requested that the school department reviews and approves the keying schedule. There was discussion regarding the removal of excess material and application of the permit for earth removal. Mr. MacCaffrie asked about the status of the issues with TCI. The correct personnel need to be in attendance at the meetings. There have been some delays in getting; responses to questions. 'Member Young asked about the status of the RFI's and why we have not answered RFI's that are three months old. Mr. Parker asked if he could be included in the correspondence loop regarding RFI's. Mr. Ashton stated that he is trying to dedicate one day per week to resolve the outstanding issues. Mr. Loeper gave a status update on the additional flooring that this was not included in the drawings. Mr. Parker gave his interpretation of the M.B.C. Minutes 7-8-97 Page 2 of 4 specifications. Members from JTC and W. Parker will review these items and will respond to the committee. Vinyl Flooring: Mr. Loeper reviewed the floor schedule and stated that there will be additional costs associated with the flooring. This information has been the generated by the flooring contractor upon review of the scope of work. There was discussion regarding which rooms are included in the floor schedule. The contractor stated that the price of the all the patterning work throughout the project would be $1600. This price does not include any demo work in the existing building vestibule work. (Approximately $1173) MOTION: To allow the contractor to proceed with the patterns as proposed. DY/JL 2-1-0 Asbestos: There was discussion concerning the discovery of additional friable materials. MOTION: We authorize the Project Coordinator to work with the contractor and asbestos hygienist to determine the amount of the asbestos that needs to be abated in areas in which' work is being performed. DY/JL 3-0-0 The Project Coordinator asked about the status of the sprinkler. This work needs to be approved by TCI and formally; submitted to the Fire Department for approval. The cost without mark up is approximately $35,000. TCI must give final approval. This issue must be completed prior to an occupancy permit being issued in school. Member Liddick asked about the project schedule. Member Liddick stated that he would like to help with the smooth progression of the work. He would like to know what the plan includes for September 1, 1997. MOTION: To authorize Callahan to move forward on the design of the sprinkler plan so that we can move forward with the design. JUDY 3-0-0 NOTE: Keyes was directed to pursue all credits associated with this work. Mr. Ashton discussed the carpet submittals because the carpet manufacturer had changed. M.B.C. Minutes 7-8-97 Page 3 of 4 MOTION: To go with Keyes recommendations on carpet. DY/JL 2-1-0 Feeley Opposed There was discussion concerning the selection of the furniture consultant. The consultants will do a presentation for the committee. They will be invited for July 22, 1997 The Committee reviewed the Police Station Project MOTION: To make the MEMA wall drywall instead of CMU and to notify S & H. DY/JL 3-0-0 MOTION: To adjourn.(Unanimous) Respectfully submitted, Richard Feeley Clerk ` ignature of Chair Date of Acceptance - Vote M.B.C. Minutes 7-5-97 Page 4 of 4