HomeMy WebLinkAboutMBC 09/16/1997Municipal Building Committee t September 16, 1997 Minutes nt— .+-] OCT 22 f' 1,1 3: 30 a ,`-` Lo _ +r SETTS t i t i . MEMBERS PRESENT: Chairman Liddick, Members Feeley and Young Maureen R. Doherty — Administrative Secretary GUESTS PRESENT: Roger Hoit — Strekalovsky and Hoit, Richard Boucher — Acting Town Manager MINUTES: The following minutes were submitted for approval. August 19, 1997 — held for review September 9, 1997 — held for review MOTION: To approve the minutes of August 26, 1997 as amended (DY/RF 3-0-0) MOTION: To make corrections to the meeting of July 15th to reflect Member Young's comments (DY/RF 2-0-1) (Feeley abstained) — (Attached) INVOICES: The followine invoices were submitted for approval. Vendor Project Amount Vote Walter Parker Robinson $ 2,600.00 DY/RF 3-0-0 Keyes Associates Robinson $ 3,748.25 DY/RF 3-0-0 Mini Warehouse Robinson $ 60.00 DY/RF 3-0-0 Hartford Office Robinson $ 5.49 RF/DY 3-0-0 Hartford Office Robinson $ 20.82 RF/DY 3-0-0 Signs Etc. Town Hall $ 875.00 DY/RF 3-0-0 Signs Etc. W. Mans Fire $ 875.00 DY/RF 3-0-0 BBC Co. Inc. Police Station $190,081.00 DY/RF 3-0-0 Strekalovsky and Hoit Police Station $ 4,402.66 Hold Strekalovsky and Hoit Town Hall $ 7,215.48 Hold Gale Associates Jordan/Jackson $ 1,926.64 DY/RF 3-0-0 CORRESPONDENCE: Town Hall • A letter to R. Hoit from J. Liddick RE: Repeat requests for information • A Fax report from Trane RE: chiller barrier Police Station • A memo to the Town Manager, Board of Selectmen & FinCom from J. Liddick RE: Contaminated Soils • Draft Sign —Police Station Project (The committee reviewed and changed the word secretary to read M.B.C. Secretary- this has been reviewed an approved by the Town Manager and Chief of Police) Municipal Building Committee Minutes 9-16-97 Page 1 of 3 Robinson and School PMiects • A letter to J. Liddick from S. Loeper RE: Potential Project Delays (Chairman Liddick stated that he reviewed these items with Mr. Parker. All the items listed were reviewed at the construction meeting.) • POC # 43 — abatement work - $11,249.00 (There was discussion on this item — we have not received comments from the Project Coordinator — this item will be referred to the PC for comment) • PCO #42 — wire pump panel - $3828.95 (There was discussion on this item — this item will be referred to the PC for comment) • A letter to L. Sciarrapa from S. Callahan RE: Requested sub contractor information • A letter to S. Loeper from W. Parker RE: Ball Field (The Chair will discuss areas for additional berms with the PC) • A memo to B. Davis from W. Parker RE: Drywall • Copies of Faxes to TCI from Keyes RE: Kitchen Appliance Load, Elevator, Gas Generator connection, Boiler Breaching (There was discussion regarding the size of the elevator cab and letters to be written — send a memo to Mr. Ashton requesting this information — The committee discussed the scope of work of the boiler room) • A memo to BOS, FinCom and School Committee RE: QMS, MHS — seeking direction Clerk and Field Reports • Robinson School — September 80'— September l la' • Construction Meeting Minutes - # 32 • Police Station — September 2"d_ September 12u' Municipal Projects Review: Mr. Roger Hoit distributed copies of the original drainage calculations for Town Hall. Mr. Robert Berens, acoustical sound engineer, from Acentech gave an overview of the sound testing for the chiller. The testing level rated approximately 49dB — 61 dB 12(+-) dB above ambient level at 6:00pm. Mr. Hoit asked if another test would be done during the daytime hours. The level is 53dB (8dB above background) in Mr.Calhoun's back yard. The lead shields give a 3 — 5 dB reduction in noise. Member Feeley asked what is acceptable. There is no Town Ordinance for Noise Levels. State requirements are floating 10dB above background noise. The sound engineer has to review the state requirements for tonal acceptability. The official reading is determined at the property line and the nearest residence. Mr. Hoit asked about the design of the sound barrier. The sound engineer stated that he feels that a wooden stockade fence is fine with 3/4" plywood to cover up holes in the fencing. There are other exterior panels that are better to use for sound deadening properties. Mr. Hoit asked if a recommendation could be made for a proper exterior application. Member Young asked what would happen if the entire fence was removed. The sound engineer stated that the no fence would worsen the situation. He also suggested that the barrier could be higher. Members Young and Feeley stated that they feel that there needs to be testing during the day — this will be reflective of the Municipal Building Committee Minutes 9-16-97 Page 2 of 3 ambient sound during the day. It was suggested that an enclosure over the compressor units could be added. Member Feeley asked if there were fixed recommendations that would be better and asked if a masonry structure would be a better solution. The sound engineer stated that if you installed a "gold brick" wall — there would not be any significant sound changes over the present enclosure.. It was also suggested that the fencing should be made higher. Mr. Hoit asked if a cap was installed - would this make a significant sound improvement. The sound engineer stated that this would not make much of a difference. The acting town manager stated that he needs a letter stating that the chiller is the unit that was specified. There was discussion regarding the drainage problem with the Town Hall site. Mr. Hoit submitted the original drainage calculations for the site. Copies of drainage calculations were requested to be distributed to all concerned parties. When the drain line was corrected an independent contractor took measurements to insure that the line was installed per plans and specifications. The acting town manager stated that he needs to resolve this problem immediately. Mr. Hoit stated that he has been in contact with CNM (electrical contractor) and all the parts have been ordered. They will be on site in a few days to complete the outstanding items. Member Young stated that he had requested the Town Hall sign be moved and the acting town manager never followed through on this. There was discussion regarding the clean up of the contaminated materials at the Police Station site. This is being handled through the Town Manager. This is beyond the scope of the police station project. Chief O'Neill discussed the rough plumbing in the photo room. The Chief asked about the finish in the cell work. The finish schedule was in conflict with the plans. MOTION: To approve change order #4 for $37,275.00 for BBC masonry work (DY/RF 3-0-0) MOTION: To adjourn. (DY/RF 3-0-0) Respectfully submitted, Richard Feeley — Clerk Q,G 10-q- 97 Signature of Chair Municipal Building Committee Minutes 9-16-97 Page 3 of 3