Municipal Building Committee" iGL
MINUTES „3 JUN23 P i 12 52
March 10, 1998
MEMBERS PRESENT: Chairman Liddick, Members Feft,�A��s
Young
Maureen R. Doherty - Administrative Secretary
GUESTS PRESENT: Ammar Dieb — Universal Engineering, James May, David
Borsen — Wallace Floyd, Richard Battles — TCI, Walter Parker, Robert Vogel, Dan
Freeman — Keyes Associates.
The following invoices and purchase orders have been submitted for
approval:
Vendor
Project
Amount
Vote
IT Callahan & Sons
Robinson
$78,087.80
DY/RF 5-0-0
C berComm
Police Station
9,540.00
DY/RF 5-0-0 hold
Apahouser Systems
Police Station
885.00
To be included w par[ of BBC
General
♦ A memo to list from Scott Leite RE: Sound Workshop
♦ A memo to the Municipal Building Committee from W. Parker RE: Certificate of
Insurance
♦ Copies of Town Accountant's Budget Report: February
♦ An invitation to attend the Conflict of Interest Seminar
Town Hall/West Mansfield Fire Station
♦ A memo to J. D'Agostino from J. Liddick RE: As -built distribution
♦ A copy of a memo from Bob Mangiaratti RE: Town Hall Roof
♦ A memo to J. D'Agostino from J. Liddick RE: West Mansfield Fire Final payment
♦ A memo to J. Liddick from J. D'Agostino RE: distribution of as builts (we
recommend that these original reproducible prints be stored in the vault)
Police Station
♦ A memo to the Municipal Building Committee from G. Figueredo RE: Video
Cameras (the committee reviewed this memo and made the following recommendation
to send this memo to J. D'Agostino, this has been installed per plans and specs as
discussed during the planning phase)
♦ A memo to J. D'Agostino from J. Liddick RE: Occupancy Permit
♦ A copy of a memo to BBC from A. Bacchiocchi RE: Final Inspection
MBC Minutes March 10, 1998
Page I of 5
♦ A copy of a memo to J. D'Agostino from B. Cook/ D. Conley RE: Occupancy Permit
♦ A memo to J. Liddick from D. Clifford RE: Police Station Utility Bills
Robinson & Jordan Jackson Schools
♦ A memo to J. Liddick from J. D'Agostino RE: Change Orders (Chairman Liddick
sent the latest budget reports to the Town Manager and Mr. Vogel will speak with the
Town Manager about this issue)
♦ A memo to L. Azinheira from J. Liddick RE: JJ Well Site (This issue will be
coordinated with Mr. Parker)
♦ A copy of a memo to DL Maher RE: Fracture Trace Analysis
OMS and High School Proiects:
Chairman Liddick stated that the representatives of Keyes, Wallace Floyd and TCI
Associates were present to discuss pertinent issues and future schedules for the school
projects.
Mr. Dan Freeman gave an overview of the asbestos abatement portion for the school
renovations projects. Mr. Ammar Dieb, Universal Engineering Co., spoke to the
committee regarding his experience with asbestos removal in renovation projects.
Chairman Liddick asked how much of the asbestos containing materials must be
removed. Mr. Dieb stated that if any area that contains asbestos is disturbed than that the
asbestos removal contractor must abate area. He also said that he has done removal work
in phases. Members Young asked about the coordination of the scheduling of abatement
work while there are two contractors on site. Chairman Liddick stated that a phasing plan
has not been developed for the projects. Mr. Freeman stated that the specs could be
written and developed to incorporate a phasing plan that calls to the attention of the
General Contractor that abatement work must be included. Mr. Vogel added that the
phasing plan specification could be very specific including dates for completion of each
stage of the phasing plans. Mr. Dieb stated that he has always discussed abatement work
at the pre construction meeting and usually asked for 10 -day notification for access to this
area. Mr. Vogel stated that the phasing plan is developed with the users of the facility,
which would incorporate their needs. Mr. Parker asked about damages that are caused by
the abatement contractor. Mr. Dieb stated that his specs state that the contractors must
exercise 100% care. Member Young asked about air quality testing. Mr. Dieb stated
that his company is responsible for air testing, certification and monitoring of the
abatement area. He also stated that his company would have a representative on site at
all times. Mr. Vogel asked Mr. Battles about heat loss potential due to removal of the
asbestos insulation. Mr. Battles stated that this piping would need to be reinsulated.
Mr. Dieb discussed his proposal for hazardous material abatement engineering inspection
design, project monitoring and laboratory services for Qualters Middle School and
Mansfield High School. Phase One includes Inspection Services — which will be for the
entire school regardless of construction. The bids that are solicited are for lump sum,
also included in this is an amount for hidden conditions. Chairman Liddick asked about
MBC Minutes March 10, 1998
Page 2 of 5
damages caused by investigative inspections. Member Gay asked about the obligation of
the monitor and control procedures. There was discussion regarding the disposal of
materials in the crawl space.
Chairman Liddick asked about the phasing of the work in relation with the general
contractor. He feels that we able to save money on the Robinson School project because
of the latitude of the phasing plan. He is concerned about claims from the contractor
because he is hindered from accelerating the project. Mr. Dieb stated that his
specification has specific language that addresses accelerating.
MOTION: To authorize Keyes to move forward to accept the proposal from
Keyes Associates dated January 30, 1998 for the asbestos
abatement with Universal Engineering. (DY/RF) 4-1-0 (Moore)
Discussion: Member Moore raised concern about having two prime contractors
being on site at the same time. He stated that he is fundamentally
opposed to this. After the completion of the phase one — a report will
be issued.
Chairman Liddick stated that the second phase on the meeting was to review the
scheduling of project bidding. The committee reviewed the floor plans for the Qualters
Middle School.
There are several other issues that need to be covered:
1.
The first issue that was discussed was the need to have the list of chemicals in the
science labs in the Qualters Middle and Mansfield High school. This was forwarded
to Walter Parker for action a letter will be sent to the superintendent.
2.
Security System: A question was raised if this was to be included in the plans for
QMS. As of this date, the security system is not included. Mr. Vogel asked if the
school department wanted this system upgraded, left untouched, or piped for fixture
expansion. Chairman Liddick stated that he did not want to add any new items for
this system. School Committee Chairman stated that he wanted to have the boxes and
conduits installed but the system would be installed later. This will be coordinated
through the school department.
3.
Shop plan layout — this will be left by Keyes to be coordinated with the shop teacher.
4.
Conservation Issue: This needs to be submitted to the Conservation Commission for a
second review due to parking lot changes.
5.
Site Plan approval: The Town Engineer has suggested that this go through the site
plan process again. Concern was expressed regarding parking at the High School
site. It was the consensus of the committee to have Keyes move forward with the
projects and suggest that Keyes go forward submitting for site plan review. Chairman
Liddick will discuss this with the Town Manager.
6.
Memorial Park: this project will not be included in the renovations because of the
lack of funding.
MBC Minutes March 10, 1998
Page 3 of 5
7. Transformer — Qualters: Mr. Parker stated that the electric department needs a letter
regarding the removal and replacement of the transformer at Qualters. TCI will
forward details on this.
8. Fire Department: There was a meeting with Lt. Sarro re: addressable fire alarm panel.
The new system will be fully addressable by device and the replacement panel will be
replaced with one that will be addressable by zone. TCl/Keyes will write a
confirmation letter and ask for a written response on this issue.
9. QMS — TCI issues: It was the original plan not to replacement of unit vents, Mr.
Battles has had discussion with staff and there were problems with many of these
units. He stated that there were 42 units in question. Chairman Liddick asked if these
units were affected by the work completed by Johnson Controls. Mr. Battles stated
that there was work still to be completed by TCI. School Chairman Giordano asked if
the replacement of the Unit Ventilators could be added as a bid alternate. Chairman
Liddick asked that if this was done it could be at the cost of the high school project.
The Town Manager stated that it would be better to complete this project correctly at
the beginning rather than go back for more money after the project was completed.
The committee directed TCI to review this item and make recommendations on what
needs to be replaced. The Town Manager asked if there is any grant money available
to complete this project.
HIGH SCHOOL PROJECT:
Mr. David Borsen, Wallace Floyd Associates gave an overview of the high school
project. Chairman Liddick asked Wallace Floyd if they coordinated the bid schedule
with Keyes. It is the intent that these two projects are bid together. Mr. Borsen stated
that there would be issues that need to be addressed through addenda. Member Feeley
discussed the status of Wallace Floyd moving forwards. He expressed concern with the
quality of drawings and the liability of the committee with potential change orders. The
Town Manager stated that he would rather have better documents and figures before we
can go before Town Meeting. Chairman Liddick asked if we are looking for potential
problems and risks if we race towards the April I" deadline. Mr. Borsen stated that there
might be some risks if we go forward with the April I" date. Mr. Vogel discussed the bid
plan for the projects. The committee discussed the pros and cons of bid scenarios.
There was discussion regarding the issue of debt exemption for the school projects. This
has been reviewed by Town Counsel and needs to be addressed by Bond Counsel.
Chairman Liddick asked about delaying the Town Meeting until the bid documents have
been reviewed. The Town Manager stated that he would prefer to have actual numbers in
hand prior to going to Town Meeting. The Town Manager needs to discuss Town
Meeting strategy with the Selectmen. Member Feeley stressed the importance of
receiving a determination from Bond Counsel. Mr. Borsen agreed with Keyes on bidding
the projects together. In conclusion, the chair will discuss this outcome of this meeting
with the Board of Selectmen and report back to the Keyes and Wallace Floyd on March
18th.
MBC Minutes March 10, 1998
Page 4 of 5
TOWN HALL:
The Town Manager gave an overview of the meeting with Town Counsel, Strekalovsky
and Hoit and DPW regarding outstanding issues at Town Hall. Mr. D'Agostino stated
that Strekalovsky and Hoit will absorb the cost of the remedy of the sound barrier and if
this doesn't work then he will replace the chiller unit.
POLICE STATION:
The Committee discussed occupancy issues with the Police Station project.
The Town Manager will present the Board of Selectmen with a request for a fund transfer
for the overage at the Police Station.
MOTION: To adjourn at 12:00 am (KG/WM 5-0-0)
gnature of Chair
MBC Minutes March 10, 1998
Page 5 of 5
S"G-G z /y
Date of Acceptance - Vote
addressed on the QMS and High School drawings. Mr. Freeman said this would be
addressed.
TOWN HALL:
The Town Manager gave an overview of the meeting with Town Counsel, Strekalovsky
and Hoit and DPW regarding outstanding issues at Town Hall. Mr. D'Agostino stated
that Strekalovsky and Hoit will absorb the cost of the remedy of the sound barrier and if
this doesn't work then he will replace the chiller unit.
POLICE STATION:
The Committee discussed occupancy issues with the Police Station project.
The Town Manager will present the Board of Selectmen with a request for a fund transfer
for the overage at the Police Station.
MOTION: To adjourn at 12:00 am (KG/WM 5-0-0)
Signature of Chair
MBC Minutes March 10, 1998
Page 5 of 5
Date of Acceptance - Vote