Loading...
HomeMy WebLinkAboutMBC 10/20/1998TOWN�FMANSFIELD` M muUNJCiINAT, ILDING COMMITTEE MINUTES OF OCTOBER 20, 1998 Members Present: ' Rich Feeley, Chairman, Jim Liddick, Clerk, Ken Gay Bill Moore, David Young, and Eleanor McCarter, Secretary Attendees: Ron Ponte, Tata & Howard Renee Gauthier, DPW John D'Agostino, Town Manager John Moretti, Superintendent School Committee Members: Jean Miller, Chairman, Mike Trowbridge, Clerk, Jeff Sankey, Emil Giordano, and Liz Thornton Meeting commenced at 7:00 P.M. MANSFIELD HIGH SCHOOL Withdrawal of Sub -bids — Jim May commented that Chapter 149 of sub bid law allows for the withdrawal of bids in the case of bonafide clerical errors. Three requests to withdraw have been received from Sub Bidders: Bostonian Masonry, Eastern Contractors and Modern Glass & Aluminum. General Bid Opening/MHS - Jim May reviewed high school bid results with MBC. The apparent low bidder for the MHS Project was J.T. Callahan at $9,018,000. Based on the bid withdrawals, an additional $208,000 will be added to General Bid amount. Jim Liddick commented that based on numbers in hand - estimated available contingency is approximately 6.5% . The Committee discussed and calculated worst case estimates to have on hand, should any new developments occur. Data/Tel Cable — John D'Agostino expressed concern in having enough available funds to cover high school Data/Tel needs. ROBERT E. WALSH WELL UPDATE As requested by the MBC, Ron Ponte has notified Winston Builders re: permit required for site trailer, and installation of an electrical ground for safety reasons. Metering Pumps/Chemical Storage Tanks — Mr. Ponte reported that he had rejected Winston Builders' submission on the metering pumps and chemical storage tanks, because they did not meet specifications. SCADA S.. ste —John D'Agostino noted that a warrant article in the amount of $117,000 is being sponsored by the Water Department to cover the cost of this system. Schedule/cash flow - Ron Ponte provided the Committee with a construction schedule and cash flow statement for the well project. Areas of completed work were highlighted. Mr. Ponte noted that mostly the rough work was done. Winston is currently pouring I" half of first floor slab. Shop Drawings — Tata & Howard was asked by Ken Gay if any new shop drawings had been received. Mr. Ponte commented that there had been no significant changes. Change Order #1 ref Perimeter Insulation — Ron Ponte presented a change order submitted by Winston in the amount of $1669.00. Winston Builders claims that perimeter insulation is not indicated on drawings. Mr. Ponte noted that the insulation is in the specifications and is also required by building code. Tata & Howard did not recommend approval. MBC agreed that the request should be denied. MBC pointed out that the architect could have rejected the request based on submission of a "Request for Information". Mr. Ponte noted the extra paperwork was to appease the contractor. Payment Requisitions - Ron Ponte noted that the 2"d payment requisition was recently submitted to DPW. MBC should see copies prior to payment. MBC to send letter to DPW requesting update as to the status of requisitions received. MBC Requests: - Request was made by Ken Gay to have work crew clean up of excess building material in road. Renee Gauthier to notify Mike Ahern. - Request made by David Young to have DPW provide copy of budget to MBC including architectural contract (all inclusive) and anything relating to construction administration. Renee Gauthier will forward copies of information to MBC. Shop drawings- David Young questioned whether there were any items outstanding having long lead time. None at this time. Soil Testing - Rich Feeley questioned whether soil and concrete testing services were included in contract. Tata & Howard confirmed that it is included. QUALTERS MIDDLE SCHOOL Fire Inspections/OMS — Town Manager commented in his letter to MBC confirming that the Fire Department agrees to perform inspections on regular time. John D'Agostino stated that he had spoken with Lt. Sarro. They have agreed not to submit over time charges for inspections, provided that conditions within the letter are met. Mr. D'Agostino reiterated that the Fire Department must have at least 1 week prior notice to schedule inspections. General Contractor must coordinate with Fire Dept and Project Coordinator. SCHOOL COMMITTEE — REVIEW OF MHS BID — (8:30PM) MBC attended School Committee meeting. Richard Feeley and John D'Agostino were called on by Mr. Moretti. Mr. Feeley noted that the bids for the high school project came in very close to the amount expected. Mr. Feeley confirmed that with school furnishings, construction management and unforeseen items need to be added to the bid, thus $7 million being requested at Town Meeting, will be needed to complete this project. Mr. Moretti noted that the School Dept. has $180,000 (2/3 reimbursable) in a Foundation Reserve that is being held specifically for the NMS project. Richard Feeley requested that he and Mr. Moretti will work together to coordinate scheduling the referendum vote. CORRESPONDENCE (Received Oct. 14'h — Oct. 20"') Memo from TM to MBC re: Fire Alarm Inspections - fee and scheduling Memo from Chris Sullivan re: Fire Alarm Inspection Details Ltr. from Chris Sullivan re: Directive to have Montle Plumbing install a clean out at QMS on T&M basis as required by Connie Lajoie. Ltr to Keyes from J.T. Callahan re: Ramp Damage- Qualters Middle School Ltr. to MBC from J.T. Callahan re: Field Main Break at QMS. JTC to forward payment for $235.00 on next pay period. FAX to Keyes from J.T. Callahan re: Fire Alarm Panel Relocation-QMS Ltr. to Keyes from J.T. Callahan re: Eastern Contractor response to returned Fire Alarm submittals. Disputes request for substitute manufacturer to provide deduct-QMS. Ltr. to Keyes from J.T. Callahan re: Pre -cast Detail Change. Request to Keyes for detail to pre-cast-QMS. Ltr. to Keyes from J.T. Callahan re: Rejected electrical items -Switchgear submittals QMS FAX from J.T. Callahan re: COP #49 ref. Gate Valve Replacement - $1,187.00-QMS. FAX to Keyes from J.T. Callahan re: Request for approval of hardware schedule-QMS Ltr. to Keyes from J.T. Callahan re: COP #15 re: provided changes in FA system wiring devices per Fire Dept. at QMS EasternBaystate- No cost change. FAX to Keyes from J.T. Callahan re: COP #GC26 ref. Steam Line T&M-$1,318.00-QMS Ltr. to Keyes from J.T. Callahan re: Light Fixtures - QMS Ltr. to Keyes from J.T. Callahan re: Returned light fixture submittals- QMS Ltr. to Keyes from J.T. Callahan re: Zone 2 Layout Ltr. to Keyes from J.T. Callahan re: RLM Flooring response/ceramic tile issue-QMS Ltr. to Keyes from J.T. Callahan re: 2nd request for location to install surplus lockers. Ltr. to Keyes from J.T. Callahan re: 2"d request for clarification of kitchen finishes-QMS Jim Liddick noted to J.T. Callahan to leave enough material to do Batch to match. Ltr. to Keyes from J.T. Callahan re: New Door Opening-QMS - 3` request to have HVAC control conduit relocated. Ltr. to Keyes from J.T. Callahan re: Fire Alarm Panel Relocation -QMS Ltr. to Keyes from J.T. Callahan re: Errors in Kitchen Layout dimension-QMS Memo to all Sub Contractors from J.T. Callahan re: Rules on school property-QMS Ltr. to MBC from J. Moretti re: MHS addition/renovation project bid. MBC invited to attend open session meeting, prior to Town Meeting on Oct. 26`h, 6:30pm at MHS. Ltr. to MBC from J. Moretti re: Coordinating meeting with Architect and MHS Principal. Ltr to J. Morretti re: Point person needed at QMS to coordinate Data/Tel Cabling issues. Ltr. to Keyes from SMI re: SMI assumes responsibility for damage to walkway at QMS. Ltr. to MBC from J.T. Callahan re: Zarrella Plumbing issues at Robinson School. Ltr. to MBC from J.T. Callahan re: QMS Stage Curtain — Call from sales rep. Ltr. to MBC from J.T. Callahan re: Removal of exterior conduit-QMS Copy of Ltr. to Chris Sullivan from J.T. Callahan re: Removal of exterior conduit-QMS Ltr. to Water Dept from J.T. Callahan re: Water main break. Break occurred while J.T. Callahan was doing test pits for MHS. JTC. Claims they should not be responsible. Ltr. to Keyes from JTC re: QMS Demolition Areas vs. Notes — J.T. Callahan inadvertently removed walls noet designated to be removed. FAX to Keyes from J.T. Callahan re: COP#42 ref. Tile Removal $1,990.00 for review. Ltr. to Keyes from Chris Sullivan re: MBC reconsidered and approved use of Victaulic pipe. McLaughlin will resubmit package including job specific information for approval. FAX to Keyes from J.T. Callahan re: RFI #58 ref. SM9/29-Drwg Al/A6 Wall Support FAX to Keyes from J.T. Callahan re: COP #58 ref. RFI #58/Added wall work $10,298.00 FAX to Keyes from J.T. Callahan re: COP #45 ref. Added Masonry SK 16-20 $6,033 FAX to Keyes from J.T. Callahan re: COP #35 ref. Glazed Tile $82,014.00 FAX to Keyes from J.T. Callahan re: COP #34 ref. SKI New Wall/Demo $4,060.00 FAX to Keyes from J.T. Callahan re: COP#44 ref. Gas Code Issues T&M $314.00 FAX to Keyes from J.T. Callahan re: COP #48 ref. Unforeseen Pipe Repair $1,223.00 FAX to Keyes from J.T. Callahan re: COP #43 ref. Abatement Protection $297.00 FAX to Keyes from J.T. Callahan re: Proposal for patch to match ceramic floor Copy of Ltr. from Lt. Figueredo to BBC re: CAM H. V.A.C. questioning warranty issue Copy of Ltr. to Walter Parker from Chris Sullivan re: Water line break shorted fuse in Merlin panel shutting down communications system at Qualters. MBC requested Chris Sullivan send a letter to the Contractor re: carelessness putting educational system at risk. Copy of Ltrs to Walter Parker from Chris Sullivan re: Requests to relocate HVAC control conduit to accommodate new water heater. (Is` 2"d & 3`d request received) Copy of Ltr to Chris Sullivan re: Notice of power to be switched to new transformer and switchgear on 10/17/98. Power will be off for entire day. Ltr. to Water Operations Mgr from J.T. Callahan re: Water main break at MHS Ltr. from Max Volerra re: Jordan/Jackson Roof Testing- Motion by the MBC to forward to Town Manager for directive. School Specialty — Ltr. of interest re: school furnishings for QMS/MHS Tibbetts Engineering Corp. — Ltr. of introduction/Advertisement SCHOOL COMMITTEE — CLARIFICATION OF MHS BID — (9:40PM) School Committee came to MBC meeting to clarify questions relating to MHS bid. John Moretti asked the Committee, to provide basic numbers, Re: addition/renovation costs for MHS for overhead. School Dept. needs to present actual bid value plus other items in project cost that adds up to need $7 million. Jim Liddick to FAX information. CORRESPONDENCE Continued: Review of correspondence from w/e 10-6-98 Ltr. to SMI from Keyes re: Damage to main entry ramp at QMS Ltr. to J.T. Callahan from Chris Sullivan re: Code Issues in toilets B6 & B8 - QMS Ltr. to J.T. Callahan from Steve Bishop re: Notifying Water Dept. prior to future digging. Ltr. to MBC from Keyes re: Repairs to brick/flashing - QMS Memo to Chris Sullivan from Jack Hagerty re: Safety and Security at QMS FAX to Keyes from J.T. Callahan re: Zone 2 drainage - QMS FAX to Keyes from J.T. Callahan re: Approval on flagpole at QMS. FAX to Keyes from J.T. Callahan re: Cost to relocate sign $500.00 will be offset by the labor cost to install added drainage at entry ramp at QMS. Ltr. to MBC from J.T. Callahan re: Work to expand entry door per skca-022 -QMS Ltr. to MBC from J.T. Callahan re: work commencing at stair tower in zone 6 — QMS Ltr to Keyes from J.T. Callahan re: Tile/Patch Issue Copy of FAX to Chris Sullivan from Ray Kimball,Gareventa USA — Back up re: change of original specifications for wheelchair lifts at QMS FAX to Keyes from J.T. Callahan re: COP #33 ref. Temp Entry - $2806.00 FAX to Keyes from J.T. Callahan re: COP #37 ref. Floor Drain Vent - $3,124 FAX to Keyes from J.T. Callahan re: COP #39 ref. SKS-5 Landing - $1,673.00 FAX to Keyes from J.T. Callahan re: COP #43 ref. Abatement Protection - $297.00 INVOICES Committee reviewed Invoices submitted by Keyes Assoc. - Re: Invoice C9410.00-35 $9471.66. Committee questioned $8,925.00 already paid within a previous Keyes invoice. Secretary to verify duplication & adjust as needed. MOTION to recommend payment to Keyes Associates in the amount $9471.66 for services rendered for MHS through August 29, 1998. JL/DY Passes 5-0 MOTION to approve payment to ROBERT H LORD, for purchase of 9 Computer tables for Robinson School (referenced in P.O. #98-002.1), in the amount of $3,087.00. OLD BUSINESS JL/DY Passes 5-0 Change Order Proposals - Ltr. to MBC from Keyes re: QMS KA File No. C9410.01 Change Order Proposals 10,16,17R & 23 were reviewed and recommended for approval by Keyes Assoc. at the Oct. 13`" meeting of MBC. MOTION to approve the Proposed Change Orders listed below, as recommended by Keyes. DY/JL Passes 5-0 Proposed Changed Orders proposals: - COP #10 ref. Fire Alarm Temporary Relocation $2,251.00 (D.D.) - COP #16 ref. Gate valve replacement in the amount of $ 370.00 (F.C.) - COP #1711 ref. Gym Window Steel in the amount of $9,601.00 (O.C.) - COP #23 ref. Gas Line Cap in the amount of $ 134.00 (F.C.) Respectfully submitted, Eleanor McCarter, Secretary 01 Jfirnes Liddick, Clerk Date