HomeMy WebLinkAboutMBC 03/23/1999TOWN OF MANSFIELD
APPME
Municipal Building Committee
Meeting Minutes of March 23, 1999
Members Present: Rich Feeley, Chairman, Jim Liddick, Clerk, Ken Gay
William Moore, and Eleanor McCarter, Secretary
David Young — Excused absence
Attendees: Dan Freeman, Keyes Associates
Chris Sullivan, QMS Project Coordinator
Walter Parker, Buildings & Grounds Director
Bob Gurek, School Business Manager
Meeting Comenced at 7:30PM
CORRESPONDENCE
Ltr. to Fall River District Court from Montle Plumbing re: Dismissing Small Claims court.
Ltr. to Keyes Assoc. from MBC re: Mansfield School Projects Keyes Assoc. unpaid billing.
Ltr. to JTC/Keyes from Chris Sullivan re: Outstanding Change Order Proposals-QMS.
Ltr. to J.T. Callahan from Chris Sullivan re: Installation of gas cock - QMS.
Ltr. to J.T. Callahan from Wallace Floyd re: Corridor ceiling removal — MHS.
Ltr. to Keyes Assoc. from TCI re: Existing standby generator — QMS.
Ltr. to J.T. Callahan from Chris Sullivan re: Mounted floor mats — QMS.
Ltr. to J.T. Callahan from Keyes Assoc. re: Change Order Proposals, status — QMS.
Ltr. to Chris Sullivan re: Knox Box — delivered - QMS.
To MBC from Paul Letendre re: Project Coordinator Daily logs — MHS.
Memo to MBC from School Dept. re: Appointment of School Committee officers.
QUALTERS MIDDLE SCHOOL
General Update — Chris Sullivan reported that the construction project at Qualters is slightly
ahead of schedule. Roof work has begun in Zone 2.
Hollow Metal Door Frames - Chris Sullivan expressed concern with frames rusting from the
inside out. Frames have not yet been installed. Ms. Sullivan to follow up with Keyes Assoc. for
resolution. Chris Sullivan has taken photos of the frames.
Floor Mats — Regarding the proposal to install gym mats in the new addition, Ms. Sullivan
commented that Mr. Maher, QMS Principal would prefer to omit new floor mats and use credit
elsewhere. The mat representative has suggested to Chris Sullivan that placing the accent oak
trim (shown in the plans on the top and bottom of mats) is a safety hazard. Discussion was to
remove the oak trim in the bottom only. Dan Freeman to follow up.
Data wiring — The Building Inspector has indicated that the existing data wire will need to be
reinstalled and supported properly. Project Coordinator noted that the work could be costly.
Chris Sullivan noted that the existing motion detectors would also be secured above the ceilings.
Directives to Subcontractors — Chris Sullivan reported that Walter Parker, Buildings & Grounds
has issued directives to QMS sub contractors regarding changes in their scope of work.
Concerns were raised by Ms. Sullivan that such instances are jeopardizing work relationships
and quality assurance on the job site. To avoid any miscommunication the subcontractors have
been instructed by the General Contractor to respond only to directives issued by the QMS
Project Coordinator, Bob Gurek will follow up with John Moretti, Superintendent.
Steam Traps — Chris Sullivan stated that she had notified the Buildings & Grounds Dept. in
February re: poor condition of 3 existing condition steam traps. Ms. Sullivan commented that
mold is a severe problem in the senior wing. The Project Coordinator noted that ventilation is
needed in crawl space to eliminate mold spores. Additional conditions at QMS related to the
cause of mold include standing water, faulty valves and weather. Bill Maher, Principal will
address issue with School Superintendent next week. Discussion was to have Chris Sullivan
direct McLaughlin Plumbing to replace traps. Jim Liddick suggested that the Project
Coordinator document all maintenance type issues encountered by the construction project.
Generator — Re: generator not working properly; Walter Parker was to check the battery during
February vacation. Battery was replaced. Richard Feeley questioned status regarding the current
condition of the existing generator. Chris Sullivan to follow up.
Gang toilets — Ms. Sullivan reported that renovations to the gang toilet facilities are complete.
Exterior Brick — Rich Feeley asked for an anticipated start date for exterior brick work. Due to
the high volume of dust expected, Mr. Feeley suggested that the brick work begin in late June.
U channels to be installed inside gym — Rich questioned if JTC owns moving bleachers. Mr.
Feeley asked Dan if anyone has addressed filling in the space behind bleachers. Dan Freeman
stated that Keyes has not addressed this issue.
Roof Blocking — Mr. Freeman commented that there are unresolved issues still pending between
Premier and J.T. Callahan.
Duct Work — Chris Sullivan noted that seismic bracing is needed. Ms. Sullivan commented that
the duct work is flush with wall. Dan Freeman to review.
Kitchen Schedule — Chris Sullivan reported that a meeting is being scheduled with Dawn
Florence, Kitchen Services Director, Bill Maher Principal and Scott Leite, Health Inspector to
discuss available options re: closing the QMS cafeteria early June.
Petition Supports — Rich Feeley noted that bathroom partitions are in need of reinforcement.
Punch list for toilets is complete.
Keyes Non Payment — The committee expressed serious concern to Dan Freeman re: Keyes non-
payment to subcontractors. Chris Sullivan commented that non-payment issues are becoming
problematic re: the QMS projects. Keyes sub consultants are reluctant to continue work. Jim
Liddick questioned whether Keyes has filed lien waivers for his subs. Town has none on record.
Rich Feeley commented that he spoke with Keyes' financial officer, Art Christopher, on Friday,
March 19`h re: issuance of payments. The conversation was also followed up with a letter
mailed the same day. According to Dan Freeman, payment to Universal Engineering has been
satisfied. A payment proposal is currently being negotiated with TCI. Dan Freeman was asked
to check payment status for Hallar Testing Laboratories and Geisser Engineering. Richard
Feeley requested that Art Christopher send a letter to the MBC confirming that all nonpayment
issues have been resolved.
Change Order Proposals - Dan Freeman reviewed change order proposals with the Committee
and indicated status of the following:
Proposed Change Order Proposals to be included in Change Order #8:
COP #84 Ref. Roof Blocking at zones 4 and 6 low roof - $1,085.00
COP #112 Quarry tile in lieu of epoxy flooring at kitchen (Cleaning and engineering
charges $326.00 were rejected.) Revised amount of change order is $12,744.00.
COP #120 — Time & Materials switch gear for stoves (management fee of $900
rejected) Approved — Revised amount of change order is $1692.00.
MOTION was made to approve Change Order Proposals #84, #112, and #120 as listed
above for inclusion in Change Order #8. (Motion previously included COP #74 ref. Skylights,
but was amended by Richard Feeley to hold COP #74 for further clarification.) WM/ICG Passes
4-0-0.
COP's Not Approved by MBC — Keyes to revise and resubmit:
COP #74 Ref. Enclose demolished skylights - $10,034.00: Question was raised re:
skylight work performed by Premier roofing. Discussion to eliminate transportation at
$90.00, eliminate 5% small tools at $261.00, and travel expense hrs. (16 man hours) at
$734.72. Dan Freeman suggested C.O.P. be returned to J.T. Callahan for clarification.
COP #108 Ref. Changes to Head End Room. Letter to come from Eastern
confirming no cost change. Project Coordinator to request that the drywall portion of
the change order to be complete based on Time & Material.
COP #114 — Ref. C.I. radiators - $10,901.00. Overhead and profit charges are
incorrect. (Eliminate material and equipment at $100.00.)
Pending Change Order Proposals:
COP 488 Ref. 32 Add'1 Toilet Accessories - $823.00. Dan Freeman suggested that
COP be returned to J. T. Callahan to clarify what items are included.
COP #91 Ref. Lobby Heat Deteriorated Pipe Z3 - $13,563.00. The existing duct
work in crawl space is rotted. Discussion that the cost was high. Chris Sullivan
to spend time with McLaughlin to re-evaluate possible alternatives. Dan Freeman
will request proposal from JTC for similar duct.
Chris Sullivan questioned Dan Freeman as to the status of various Change Order Proposals. Mr.
Freeman confirmed the status of those in question. Keyes will forward written status update to
MBC.
INVOICES
JTC/Annlication for Payment #8 - Chris Sullivan noted that the payment requisition has been
revised as previously discussed.
MOTION made to recommend payment to J.T. Callahan in the amount of $108,751.93 for
work performed at Qualters Middle School. JL/WM Passes 4-0.
J.C.I. — Data contractor secured by School Dept. Expense to be charged to Technology budget of
the Qualters construction project up to $58,000.00.
MOTION to approve I` payment of 3 for data cabling at QMS in the amount of
$14,924.79. JL/WM Passes 4-0.
Held a brief farewell ceremony for outgoing M.S.D. Business Manager, Bob Gurek.
Meeting adjourned at 10:30 PM
Respectfully Submitted,
Eleanor McCarter, Secretary
x/3/5)9 -
aures Liddick, Clerk Date