Loading...
HomeMy WebLinkAboutMBC 07/13/1999UFO Ecllikk 00 FED TOWN OF MANSFIELD Municipal Budding Cow 'q, Meeting Minutes of July 13, 1999 Members Present: Richard Feeley, Chairman, Jame3 Vii,(Jdxckk, Cle&k; yke�n6th Gay (8:05PM), William Moore, David Young and Eleanor McCarter, Secretary Attendees: Art Dias, Gale Associates Max Volterra, Volterra Goldberg, Mangiaratti & Jacobs Robert Baboian, R.B. Corrosion Services John D'Agostino, Town Manager Robert Vogel & Steve Chmura, Keyes Associates Christina Sullivan, QMS Project Coordinator John Moretti, Superintendent of Schools William Maher, Qualters Middle School Principal Lincoln Lynch, School Business Manager Meeting opened at 7:30 PM. JORDAN JACKSON ELEMENTARY Roof Replacement — Cost to replace existing metal roof with aluminum or copper is estimated to be $1.4 million dollars. Cost to recoat roof is estimated to be $250K to $300K. Existing Roof —Galvanizing "zinc coating on steel" that was then painted. No proof that it is not atmospheric. Corrosion is localized. No damage by installer. Corrosion is such that vertical face failures or standing seam failures in other areas show signs of area pollution. American Galvanizing Association doesn't recommend G9 coats for New England even though "standard". A cyclic test is a weathering test of a proposed coating fix. Test is done for 60 days under controlled conditions and equates to 8 years of roof wear. Proposal for 1000 square feet trial test area and have Baboian oversee weather test. Trial Date — Per Max Volterra, date for trial is at least six months away. Nothing to lose because obligated to minimize damages. Warrantee issues are sketchy. Slim chance award will be for a new roof. Probably material only or 1/3 cost. Underside of roof is fine. Porosity of galvanizing and primer is the problem in combination with poor metal preparation. Max Volterra has not found out about previous and post roof installations to J/J roof by that manufacturer. Need reference list for most similar roof installation fix proposed and determine how one patches this material. 8:10 PM MOTION to approve roof proposal and do cyclic test with Karnak paying for costs. DY/WM: Passes 5-0. QUALTERS MIDDLE SCHOOL Asbestos Removal (SMI) — SMI holds current contract with the Town of Mansfield for asbestos removal at Qualters Middle School. Project Coordinator reported SMI walked off job Monday, July 12, 1999. Need Town Counsel to send dismissal letter. Universal Engineering is a subcontractor of Keyes Associates responsible for monitoring this work. MBC does not have copy of Schedule of Values. SMI damaged several windowsills during demolition. MBC exploring options to proceed with work. Evaluating whether to supplement forces with Fleet Environmental. Due to declaration of emergency, Town would not be required to follow normal bid procurement procedures. Appears SMI is only showing up on site so as to appear to be not abandoning job. However, windows should have been started June 28, 1999. Fourteen points of contract nonconformance have been prepared by Project Coordinator. Potential for $5,000/day liquidated damages. Town Manager advised utilizing a Boston legal firm with construction expertise. SMI to be put on official notice. Need to also put SMI on notice about damage to sills. Sills need to be repaired. Also notify Bonding Company and send notice to accelerate schedule and supplement forces by SMI to extent necessary to finish. Color Board — Per School Principal, color board for QMS is lost. Zone 2 — Local Building Inspector recently reviewed area. Need to plan for temporary Certification of Occupancy. Issues remaining: • Elevator — New phone number needed. • Sprinkler tie-in needed. • Railings on stairwells need to be modified. Cafeteria — No new equipment on-site. MBC was advised equipment being stored at Jacob Leite's warehouse. Chris Sullivan does not foresee any problem with this. MBC asked Project Coordinator to field check. School Start Delays — School Committee must decide August 17, 1999. School Issues — MBC discussed the following School Dept. concerns: • Securing gym as weather -tight to protect wood floor. • Linc Lynch expressed concern regarding limited manpower provided by JTC. • Debris reported all over construction site. • Window damage reported. • Not using power tools. • Some unsupervised night work ongoing. • Several union trades stretched for manpower. • Walter Parker reported concrete floor cracks. Needs to be reviewed in field. • Computer lab casework has no floor underneath. • Bill Maher wants to stay with existing voicemail system. MBC decided to hold money for these operational issues. Change Order Proposals — Review/Approval: COP #69A 29 vs. 33 Hollow Metal Doors - $7,482.00. COP#90 Thru wall flashing with Premier Roofing - $138,464.00. COP#94 Blow down vent - $805.00. COP#101 Soffit under stairs - $565.00. COP#109 Hold. COP#116 Hold. Padding at Gym. COP#132 Waste piping $4,221.00. COP#148 Acid waste tank $1,959.00. COP#152 Hollow metal doors and frames - $8,243.00. COP#153 Convector traps (15) $997.00. MOTION to approve change order proposal numbers 69A, 90, 94, 101,132, 136, 148, 152, and 153 as recommended by Keyes Associates. DY/WM: Passes 5-0. Steve Chmura to document transferring use of softball field at QMS back to Town. Proposed $650.00 to move window storage trailers from that area may go away. INVOICES Mini Warehouse Inc. — QMS MOTION to recommend payment to Mini Warehouse Inc. in the amount of $80.00 for Storage Trailer rental month of July, 1999. JUDY: Passes 5-0. M. D Stedson Company — QMS MOTION to recommend payment in the amount of $2,800.00 to M.D. Stedson Company (Invoice #177941) for the purchase of one battery powered floor burnisher model "NSS BP3000" with battery charger. DY/WM: Passes 5-0. Eastern Bakers Supply — QMS MOTION to recommend payment to Eastern Bakers Supply in the amount of $3,100.00 for the purchase of (2) model 503-1C cashier counters. JL/WM: 5-0. Keyes Associates - MHS Invoice No. C9410.00-44 Includes Construction Administration fee $6705.28 plus Sub - consultants fees; Geisser Engineering -$255.00 (Soils), Wallace Floyd $240 (Sewer Main Replacement), and Crabtree McGrath $667.00 (kitchen design changes). MOTION to recommend payment to Keyes Associates in the amount of $7,867.28 for Professional Services provided through June 26, 1999. DY/WM: Passes 5-0. MBC discussed moving to weekly QMS and MHS meetings in the Summer. Meeting adjourned at 11:20 PM. Respectfully submitted, Eleanor McCarter, Secretary Z �ames Liddick, Clerk 2.24, C"�.. Date