HomeMy WebLinkAboutMBC 12/14/1999TOWN OF MANSFIELD Municipal Building Committee ' Meeting Minutes of December 14, 1999 Members Present: Richard Feeley, Chairman, James Liddick, Clerk, Kenneth Gay, " William Moore, David Young and Eleanor McCarter, Secretary Attendees: Jim May, Wallace Floyd Design Group Paul Letendre, MHS Project Coordinator Lincoln Lynch, School Business Manager Edward Rosa, MHS Principal Meeting Commenced at 7:00 PM. CORRESPONDENCE: General To Max Volterra from MBC re: Request for Litigation update-J/J Roof. To MBC from Tata & Howard re: Final payment to Winston Builders through November 30, 1999 in the amount of $5,000.00 To Fields Committee from John Moretti re: Dec. 6, 1999 Town Meeting approval to Appropriate $15,000 to perform engineering study to renovate Memorial Park, East Street fields, enhance MHS track and feasibility of third gymnasium. Mansfield High School Ltr. to Linc Lynch from Dawn Florence re: Lost revenues to be charged to JTC due to delay of kitchen opening. Rich Feeley advised Mr. Lynch that the cost should not include cost of goods sold. Mr. Lynch noted that the numbers are being revised. Ltr. to JTC from Wallace Floyd Assoc. re: Proposed COP#69 Ref. Handicap ramps- Jim May reviewed shop drawings and clarified ramp requirements. Ltr. to MBC from JTC re: COP102 ref. Roof Decking Removal credit $90,000. Memo to JTC from MHS re: Impact of failure to meet Construction Schedule -West Wing. Ltr to JTC from WFDG re: Roof replacement unit prices -Prices from RS Means 1999. FAX to MBC from JTC re: Release of Liens; JRW, Lockheed & Costa Brothers. Ltr. to JTC from Paul Letendre re: Condensation issue in freezer. Ltr. to JTC from Paul Letendre re: Lack of response to condensation issue in freezer. Ltr. to JTC from WFDG re: Request for additional information on various Proposed Change Orders. Ltr. to JTC from WFDG re: Request for additional information on various Proposed Change Order #99. Need breakdown for Nashoba Steel. FAX to MBC from JTC re: QMS Schedule. Chairman commented that copy is illegible. Bulletin to JTC from Wallace Floyd re: CCD -Installation of seismic reinforcement. Bulletin to JTC from Wallace Floyd re: CCD -Run conduit down library wall for data and power to circulation desk. Bulletin to JTC from Wallace Floyd re: CCD -Provide labor necessary to relocate the language lab to room 288 in West Addition. Includes concrete boring through slabs. Bulletin to JTC from Wallace Floyd re: Modified gutter support brackets. Locate downspouts for South/West wings. Ground connection for southeast downspout to be moved to accommodate new downspout. Bulletin to JTC from Wallace Floyd re: Install laundry basin and sewer ejector pump/tank in Graphic Arts room. Bulletin to JTC from Wallace Floyd re: Request for credit proposal to modify CMU walls. Provide new support beam below new masonry walls on second floor. Provide masonry infill at top of West wall of Guidance to underside of metal decking. Bulletin to JTC from Wallace Floyd re: Remove air conditioning in existing classrooms that obstruct installation of seismic reinforcement. To MBC from Paul Letendre re: MHS Project Coordinator Daily Log Reports. Qualters Middle School To MBC from Paul Letendre re: QMS Project Coordinator Daily Log Reports. To MBC from Southworth -Milton re: Confirmation of order -new generator for QMS. Ltr. to JTC from MBC re: Failure to meet Contract Deadline. Ltr. to MBC from JTC re: Response to MBC letter relating to delays caused by JTC. To MBC from Town Accountant re: Schedule of bills paid to date for QMS/NITS Projects. To MBC from JTC re: Protocol. Director Building & Grounds asked to refrain from directing subcontractor work. Any concerns should be addressed to Project Coordinator. Linc Lynch to follow up with Mr. Parker. To JTC from MBC re: replacement of the water main — Request for chlorination test results. To MBC from Keyes Associates re: Construction Meeting Minutes #67. To Montle Plumbing from MBC re: Request for clarification of direct payment request. MANSFIELD HIGH SCHOOL Roof/Decking Removal - Jim May commented re: a directive to install support beams to new masonry wall. One of four locations on 2nd floor work was to remove partition wall and infill. Spec called for 6" stud. Change in field was made to CMU. $700 credit due for deletion of CMU. One of four walls built. Structural engineer stated that floor would not support wall. Support beam to be installed. JTC to cover cost of beam. Library Room — This room has been relocated resulting in several conduit cores to rewire room. Jim Liddick requested that floor penetrations are sealed. School Furnishings/Technoloev — Principal Ed Rosa questioned responsibility for payment of the JCI Communication contract for infrastructure technology at MHS. Rich Feeley clarified that during a prior meeting with the School Dept., MBC was given direction to add a technology budget as part of the QMS project budget. There was no mention however about additional technology required at MHS. School Dept. signed a contract with JCI Communications for $57K. Chairman explained that the construction budget is tight at this time and cannot cover the expense at this time. Jim Liddick suggested that Mr. Rosa cover the cost of technology by utilizing the school furnishings budget already established. Ed Rosa agreed and will advise the MBC of additional furnishing needs later in the project pending available funds. MBC questioned how many drops per location are included in the JCI Contract, why MHS is the same cost as QMS. School Dept. to follow up with Bert Masson. All agreed to allow MHS staff to spend $100K for furnishings. Combined with $57K for technology caps furnishings budget at $157K. Budget to be re-evaluated at end of construction. Construction Schedule — Ed Rosa expressed concerns regarding the upcoming move into the West Addition. Mr. Rosa noted that JTC imposed costly delays to the School Dept. during the opening of the South Addition. The contractor advised the School Dept. to prepare for occupancy but did not have the areas ready to occupy on the date promised. MHS Principal plans to put JTC on notice that they must adhere to the occupancy date promised to avoid any interruption in school programming. David Young suggested to add that if scheduled date is not met then JTC will be expected to hire outside staff to move necessary furnishings at their cost and/or cover costs of school staff overtime incurred due to schedule change. Electrical Panel Changes — Rich Feeley informed the Committee that based on a meeting held with Bob Wedge, TCI, cost of changes to electrical panel is reduced from $25,000.00 to $16,504.00 plus 8% JTC mark-up. MOTION to approve JRW COP #41 for electrical panel changes in the amount of $17,824.00. JL/DY Passes 5-0. JTC/Application for Payment — Jim May presented JTC's November Application for Payment for review/approval. Discussion raised as to whether a cut of 5% should be made to JRW costs. Payment would bring contractor to 85% complete. Jim May indicated that all material is on site. Jim Liddick raised concern regarding security of materials stored on site. MBC to check status of Builders Risk Insurance. Remaining cost due is for two laborers through October. Status: Application for Payment is not approved. Change Order #3 in the amount of $80,632.00 was not received. JTC Payment Requisition can not be processed without signed Change Order #3. Mechanic liens and Contractor Schedule Update were also missing. Roof Estimate — Jim May stated that during a conversation with the roofer, Bob Feeley, of Feeley, McAnespie he was asked at what point a schedule of values was given to JTC. Mr. Feeley advised Mr. May that a schedule of values was not provided to JTC at the time of bidding. Jim May noted that an average of the three bids is $16.00 per square foot. Jim Liddick suggested that the Committee compile a list of all outstanding issues to be addressed and suggested a workshop be held during Christmas week to discuss. Issue pending. Seismic — Jim May reported an issue regarding existing masonry walls. A suggestion was made to extend seismic clips to ensure structural stability. This will involve an undetermined amount of additional masonry work that would be performed based on Time and Materials for 2 weeks. Project Coordinator will sign slips. A unit cost will be determined based on the amount of signed slips. Issue pending. Bracin — Re: Bracing of walls at the front and west side of bldg. Jim May informed the MBC that a credit is due for linear sills and installation. The credit received from Nashoba for the change in steel work is deficient and was returned with a letter from Wallace Floyd requesting additional back up. JTC is holding up work to install sills due to rejection of credit. Elevator/Fire Rating — Jim May commented that the elevator shaft walls would need to extend to roof line or shaft needs to have roof to reach a one hour fire rating. Wallace Floyd reviewing issue with the Structural Engineer. QUALTERS MIDDLE SCHOOL JTC Winter Conditions/Delay s - Chairman solicited input from MBC members regarding sending a letter to JTC in response to their claim for winter conditions and delays. Chairman to generate response from MBC. Montle Plumbing —Letter sent to JTC to address heat trace issue with Montle Plumbing. JTC/Change Order Proposal - Review/Approval of Change Order #14 in the amount of $69,978.00 including the following Change Order Proposals: COP#81R Ref. Lobby Ceiling changes SKCA 1 - $1,465.00. COP#109 Ref. Engineering charge to cut sills @ gym - $412.00. COP#125 Ref. Emergency electrical closets Zones 3 & % - $661.00. COP#141 Ref. Cable open through sleeves — no cost. COP#150 Ref. Furnish & Install new finish on walls Zone 3 - $4,674.00. COP#167 Ref. Clean bug screen and grim from exist. louvres - $637.00. COP#168 Ref. Borrowed lights administration - $2,733.00. COP#171C Ref. Acceleration - $9,413.00. CON I 72 Ref. Install hollow metal frames in lieu of Aluminum - $6,937.00. COP#175 Ref. Install storm drain piping room girls locker room - $478.00. COP#179 Ref. Install backflow preventers - $2,481.00. COP#180 Ref. Install fresh air duct UV 16 Administration - $1,849.00. COP#182 Ref. RTU 1 Return air duct for cafeteria - $6,747.00. COP#185 Ref. Relocate hot water flue & add barometric damper kitchen - $1,13 5.00. COP#195 Ref. Install steam traps at gym HV 4,5&6 - $2,042.00. COP#199 Ref. Infill block under stairs S-1 & S-2 - $3,983.00. COP#203 Ref. Stopping water infiltration at elevator pit#2 - $9,411.00. COP#206 Ref. Insulate existing steam pipe after abatement - $1,818.00. COP#207 Ref. Remove steam condensate line - $270.00. COP#208 Ref. Relocate duct from electric closet - $787.00. COP#216 Ref. Purchase emergency generator - $19,780.00. COP216C Ref. Replace water service @ stairwell #8 - $4,415.00. COP236 Ref. Credit for not installing wood flooring room G IA — ($12,150.00). MOTION to approve Change Order #14 in the amount of $69,978.00 as recommended by Keyes Assoc. MBC takes exception to all notations of time extension to contract. Note that JTC included 27 additional days in COP#14. DY/JL: Passes 4-1-0. Ken Gay opposed. JTC/Application for Payment - Review/Approval of #17 in the amount of $109,310.94. MOTION to recommend payment to J.T. Callahan in the amount of $109,310.94 for work performed at Qualters Middle School during November, 1999. 97% complete. Balance to finish was discussed. Members expressed concern re: amount of dollars remaining in contract vs. actual work performed. WM/DY: Passes 3-2-0 Jim Liddick and Ken Gay opposed. INVOICES Tata & Howard — Robert E. Walsh Well MOTION to recommend payment to Tata & Howard DY/JL: Passes 5-0. Delle Femine Corp. — QMS MOTION to recommend payment to Delle Fimine Corp in the amount of $2665.00 to repair damage to oil line at Qualters Middle School caused by JTC. Keyes Assoc. to prepare credit change order. DY/JL: Passes 5-0. Mini Warehouse Inc. — QMS MOTION to recommend payment to Mini Warehouse Inc. for trailer storage rental at Qualters Middle School for the month of November, 1999. DY/JL: Passes 5-0. Multimedia Systems — QMS MOTION to recommend payment to Multimedia Systems in the amount of $2365.20 for School Furnishings purchased for Qualters Middle School October, 1999. DY/JL: Passes 5-0. Keyes Associates — C9410.01-49 MOTION to recommend payment to Keyes Associates for professional services rendered at Mansfield High School through October 30, 1999 in the amount of $6,705.28. WM/DY: Passes 5-0. Meeting Minutes MOTION made to approve the following MBC Meeting Minutes as reviewed; October 12, October 19, and November 2, 1999. DY/WM: Passes 5-0. Meeting adjourned at 10:40PM. Respectfully submitted, Eleanor McCarter, Secretary oc-�zc y !l_ aures Liddick, Clerk Date