HomeMy WebLinkAboutMBC 02/15/2000APPROVED Town of Mansfield Municipal Building Committee Meeting Minutes of February 15, 2000 Member Present: Richard Feeley, Chairman, James Liddick (8PM), Clerk, Ken Gay, William Moore, David Young and Eleanor McCarter, Secretary Attendees: Walter Parker School Building & Grounds Sue Michael Brown, Wallace Floyd Design Group Steve Chmura, Keyes Associates Meeting commenced @ 7:OOPM MANSFIELD HIGH SCHOOL Roof/Unit Pricing —Representatives from JTC will be attending the Feb. 29, 2000 meeting of the MBC to discuss unit pricing relating to removal of gypsum decking and steel replacement of roof. Chairman requested that Sue Michael Brown, Wallace Floyd Design Group also attend. Ms. Brown commented that David Burson would attend as well. COP#33/13all Field Credit — A$17,307 credit was previously approved in C:044 for changes to ball field which excluded credit for reengineering. In response to MBC request, Sue Michael Brown commented that per a letter from JTC (dated 2-3-00) no additional credit will be issued from J.T. Callahan for reengineering (layout) this area. Existing Doors Existing doors have been lightly, sanded and stained. Ms. Brown expressed opinion that the finished quality of coating to existing doors is marginal. Existing doors are old and continue to show dark scuffs and blemishes especially near bottom of doors. Ms. Brown asked if the owner would prefer to install kick -plates which would conceal blemishes ($35. per door), or seal doors to acceptable finish as per contract. Chairman to review condition of doors and follow up. Issue pending.' Gym/Locker Rooms - Ms. Brown informed the MBC of a meeting held with NMS Vice Principal and Athletic Director, and Project Coordinator. School Dept. is requesting that significant changes be made to the girl's and boy's locker rooms. Rough estimated cost of work is $100K. 'Chairman advised Ms. Brown that any changes over $5,000, must have prior authorization from the School Superintendent. Current MBC budget will not cover cost of proposed changes. Linc Lynch to follow up with John Moretti. Sprinkler Pipe Insulation - Question was raised by JTC on site as to whether it is necessary to insulate sprinkler pipe running in cavity between existing and new addition. David Young requested that Sue Brown check to see if work is included in specifications. Change Order Proposals Sue Michael Brown distributed handout to the Committee and reviewed status of various pending proposed change orders: COP#104 Ref. Existing Roof Drain over Auditorium - Credit ($4047.00): Sue Michael -Brown commented that TCI's opinion was that amount of credit offered was fair. Committee questioned back up indicating 5 drains. Question was raised as to whether TCI was referring to credit per drain or all five drains. Status: Credit Pending. Wallace Floyd to verify the total number of drains and cost per drain. COP#146 Ref. Add Cylinders to Doors - Work necessary in rooms 170C & 180C in the amount of $410.00. MOTION to approve COP #146 as recommended by Wallace Floyd Design Group DY/JL: Passes 5-0. Pipe Chase/Existing Boy's Toilet — Issue re: size of pipe chase found too small to include 4 fixtures per specs. in (2) boy's toilets. Demo is complete. Discussion as to whether owner wishes to reconstruct chase with CMU or Glazed block. _'Consensus is to reconstruct with block and paint. Proposal of $1869.97 rejected due to excessive cost. Science Lab/Cup Sinks — Sue Michael Brown reported that the cup sinks installed in west wing are too small for intended use. School Dept. is requesting full size sinks. Installation of sinks in new Science classrooms is complete, however existing could be changed. Wallace Floyd and Paul Letendre to investigate. Specs. indicate that GC is to provide 12 x 8 sink as shown per contract drawings. Price provided to re -fit sinks already installed is $8375.00 (includes removal old sink, refit and new plumbing). Walter Parker to follow up with Science Dept. re: feasibility to replace sinks at teacher stations (2) with full size sink and leave remaining cup sinks already installed. Remaining uninstalled sinks to comply with drawings. COP 115 Ref. Add light pole —Wallace Floyd to clarify with JTC as to where or why pole is needed. QUALTERS MIDDLE SCHOOL Punch List Steve Chmura provided copies of an updated partial punch list. Mr. Chmura noted that the auditorium has not been punched. Dick Casali, Keyes Assoc. is reviewing status of all rejected work. Project Administration — Steve Chmura commented that JTC has not responded to various requests for documentation. JTC/COP's - Steve Chmura questioning authenticity of some Change Order Proposals submitted for payment by JTC. Jim Liddick strongly suggested Mr. Chmura document any suspicions of questionable paperwork for future reference. COP #277 Ref. Gym Ceiling Repair - Status: Rejected. COP #279 Ref. Vinyl Base in rm. = JTC owns per spec. 'Status: Rejected. COP #275 Ref. Drywall Ceiling in Auditorium - $830.00. Status: Pending. Steve Chmura to verify value of patch to match. COP #273 Ref. Flashing collars in kitchen floor drains. Steve Chmura noted that some cost will be incurred for this item. Status: Pending. Mr. Chmura to verify location of original drains. COP #272 Ref. Frames and Doors not on schedule. Status: Pending. JTC to identify location of doors. COP 9271 Ref. VCT & Vinyl Rms. 118A, B, & C - $1,111.00. Status: Rejected. Resubmitted as 271A. COP #271A Ref. VCT & Vinyl Rms. 118A, B, & C 41040.00. Status: Pending review of numbers. COP #270 Ref. Curbs for ductwork. Status: Rejected. JTC owns per spec. COP #268 Ref. Install drywall ceiling. Status: Credit pending. COP #238 Ref. Patch of Existing Stairs $18,230.00. Status: Rejected. COP #220 Ref. Temp Md Door/Frame at Gym Addition - $5,325.00. Status: Rejected. Contractor has offered to paint and caulk temporary door and leave in place rather than remove and re -brick to pre-existing condition. Walter Parker to review quality of installation and respond to the MBC whether installation is acceptable to remain in place. Ductwork/Nurses Area — Chairman raised concern re: JTC's lack of coordination re: required ductwork in nurses area and questioned current status. Steve Chmura responded that to date, the work is incomplete. Keyes has requested that JTC submit a proposal Chairman asked that Mr. Chmura issue notice to JTC that Owner will not pay for any additional costs incurred by the contractor to complete ductwork. Work could easily have been completed at no cost if coordinated properly. Drinking Fountains - Issue raised Re: wooden backboard installed at water fountains not installed properly. Mr. Chmura reported that the material was not treated or sealed with proper waterproofing material. Keyes to reject work and issue follow up letter. Window Issue - Rich Feeley questioned status of investigation by Bob Vogel, Keyes Assoc. re: verification of Ron Ashton's approval signature on drawings. Steve Chmura to follow up with Bob Vogel Manpower — Project Coordinator indicated earlier in the day that manpower on site included only 2 masons and 1 carpenter. Chairman asked that Keyes issue notice to JTC that level of manpower is unacceptable to complete contract work already beyond their contract deadline. Credits - Steve Chmura informed the MBC that a list of credits due to the Town has been generated by Keyes Assoc and Project Coordinator, Paul Letendre. Jim Liddick requested that Keyes give priority to preparing appropriate back up for credits and forward list to J.T. Callahan for review/processing. Terrazzo Floor - Steve Chmura commented that J.T. Callahan has suggested elimination of work. Mr. Chmura to verify cost to refinish terrazzo per specifications. Discussion about deleting Terrazzo work continued with the suggestion that the Town take the full credit. Keyes to issue letter to JTC. Administration Area — Discussion re: improper installation. Chairman asked that Keyes issue directive to JTC to remove wall at Administration area and rebuild to correct soffit height per contract documents. Keyes to issue letter to JTC. JTC/Project Administration - Job Supervisor Bruce Hanna has been relocated to staff a job in Florida. New Job Supervisor Paul Ciaramitaro, has limited knowledge of contract documents for the QMS Project and work status of work completed. Chairman requested a letter be issued to Michael Callahan identifying incomplete contract work documented to date. INVOICES Letendre Company MOTION to approve payment to Paul Letendre, Project Coordinator for services provided at QMS and MHS for We Feb 5 and Feb. 12, 2000 in the amount of $3,400.00. Cost to be split QMS-$800.00/MHS-$2,600.00 DY/WM: Passes 5-0. W.B. Mason MOTION to approve payment to W.B. Mason for MBC office supplies in the amount of $186.79. DY/JL: Passes 5-0. Respectfully Submitted, Eleanor McCarter, Secretary James Liddick, Clerk Date