HomeMy WebLinkAboutMBC 06/20/2000TOWN OF MANSFIELD
Municipal Building Committee
Meeting Minutes of June 20, 2000
Members Present: Richard Feeley, Chairman, David Young, Clerk, Kenneth Gay,
James Liddick (8:30 PM) and Eleanor McCarter, Secretary
William Moore – Excused absence
Attendees: Michael Callahan, Paul Ciaramitaro, J.T. Callahan & Sons
Steve Chmura and Bob Vogel, Keyes Associates Z o
Walter Parker, Building & Grounds Director 00 i
Lincoln Lynch, School Business Manager `e)=' -°
i < GJ
Meeting commenced at 8:OOPM. ccy)=—
QUALTERS MIDDLE SCHOOL rnr-
Punch List– The MBC walked QMS site on Saturday, June 17, 2000 to reviev4atus
Punch List issues. Rich Feeley expressed disgust with the status of incompletERvork.a
Rich Feeley stated that the level of detail included in the punch list provided by Keyes
Associates is completely inadequate. Committee members highlighted numerous work
issues throughout the school that are still incomplete, unsatisfactory, and/or rejected (i.e.
Caf6 expansion joint, Auditorium floor patch & handicap rails)
Keyes Project Administration – Manpower provided by Keyes Associates is still
insufficient. Chairman demanded that Keyes Associates immediately assign additional
man-hours to the QMS Project to coordinate a "final" punch list and ultimate close out.
Bob Vogel argued that the I" Project Coordinator leaving the job had detrimental effect
to the project. Chairman disputed Mr. Vogel's argument by reiterating that Keyes
Associates has not staffed the job properly in replacing a full time Project Manager with
only a part-time Architect. Chairman asked that all parties cooperate and dedicate time
needed to close the job.
Supplementary Punch List – Chairman informed the Committee that he directed Paul
Letendre to work Wednesday (6/21/00) through Friday (6/23/00) at QMS to generate a
supplemental punch list. Bob Vogel committed that Steve Chmura would be on site to
assist for these three full days. Member, Ken Gay also offered assistance. After final list
is generated and provided to JTC, JTC is expected to respond to the MBC with date that
work would be completed.
Direct Payment Requests – Chairman raised concern about still receiving Direct Payment
requests with so much work remaining. Rich Feeley noted that the Town is only able to
withhold the value of the monetized punch list. Michael Callahan agreed to respond to
(2) new Direct Payment Requests from Construction Consulting and McLaughlin
Mechanical by Wednesday, June 21, 2000.
rrr
Auditorium — Paul Ciaramitaro reported that JTC plans to install a transition strip at
handicap seating area in rear. Handrails on lift still incomplete. Floor patch and sealing
is unacceptable by owner.
Caf6 Expansion Joint — Installation of expansion joint is rejected. JTC agreed to
purchase and install a wider expansion joint to correct issue. Committee members noted
that floor tile patch is unacceptable. Seam is visible entire length of expansion joint.
Some tiles are cracked. Chairman requested satisfactory repair of tile floor and new base
cove around columns to prevent water damage.
Faculty Bath at Main Entrance — Problem with door frames with stone sills. Several
doors are over cut. Doors do not fit properly in frames. Discussion to install door
sweeps.
Ken Gay to verify condition and authorize installation of door sweeps as necessary.
Si na e — Paul Ciaramitaro noted that a letter "O" in the word "School" on the exterior of
the building is not fastened properly. JTC will secure.
Boiler Room — Chairman questioned status of the pipe handrail, cut by JTC to perform
work, but not replaced. Michael Callahan disputed that JTC cut the handrail, but did
agree to replace rail at no cost. Rich Feeley commented that the contract lacks common
sense and may not follow basic building practices in some cases, however this does not
excuse the architect or contractor from their responsibilities under the contract.
Window Conflict — Issue still pending. Keyes was unable to provide window mock up as
promised. Bob Vogel explained that Keyes is meeting with new company next Tuesday
to discuss alternative fix of windows impeded by partitions. Michael Callahan
commented that he is holding monies from Cheviot Corp. for roof blocking. Chairman
questioned status of JTC's payments made to Cheviot and asked Contractor to notify
Cheviot regarding rejected work.
MANSFIELD HIGH SCHOOL
Construction Schedule — School Dept. has accommodated contractor's request for
summer moves of administration, guidance, music/band, and nurse's areas. School Dept.
requesting occupancy of all classrooms by opening of School in September.
Band/Music Rm. — Issue re: height of new ceiling to be installed at 9 feet. Concern
raised by School staff that lowering ceiling height creates acoustical problems. School
Dept. agreed to installation of new ceiling approximately 6" lower than originally
specified.
Locker Room — Sue Michael Brown reviewing changes.
Project Coordinator/Reduced Schedule — MBC discussed a reduced work schedule as
submitted by Paul Letendre. The reduced schedule of 32 hours (including 8 hours on
Saturdays) would to be paid on an hourly basis. No more personal days are allowed.
MBC Meeting Minutes — Review/Approval
MBC Minutes of May 9, 2000 MOTION to approve as reviewed.
JUDY: Passes 4-0.
AMC Minutes of May 16, 2000 MOTION to approve as reviewed.
KG/JL: Passes 4-0.
MBC Minutes of May 30, 2000 MOTION to approve as reviewed.
JUDY: Passes 4-0.
JORDAN/JACKSON
Roof Litigation — David Young suggested the Committee issue a letter to Town Counsel
requesting an update as to when a roof fix is anticipated.
INVOICE
Letendre Company
MOTION to recommend payment to Paul Letendre in the amount of $2,600.00 for
services provided during the weeks of June 10 and June 17, 2000.
DY/JL: Passes 3-1-0.
Meeting adjourned at IOPM.
Respectfully submitted,
Eleanor McCarter, Secretary
David Young, ClerV Date