HomeMy WebLinkAboutMBC 06/27/2000APPROVED
TOWN OF MANSFIELD
Municipal Building Committee
Meeting Minutes of June 27, 2000
Members Present: David Young, Acting Chairman, William Moore, Kenneth Gay, James
Liddick (7:20PM) and Eleanor McCarter, Secretary
Richard Feeley - Vacation
Attendees: Lincoln Lynch, School Business Manager
Joel Antolini, MHS Vice Principal
yCn
Walter Parker, School Buildings and Grounds
sn
(, g
ro
? rrn
Sue Michael -Brown, Wallace Floyd Design Group
W
.-Oran
Paul Letendre, MHS Project Coordinator
nu
=- +
=7—
Mike Ahern, Special Projects Manager
�
rn
Meeting commenced at 7:10PM.
rn
n
MANSFIELD HIGH SCHOOL
rn
School Furnishings — Joel Antolini and Linc Lynch presented a bid analysis and request to
purchase additional classroom desks and chairs (approximately 20 classrooms) in the amount of
$58K as part of the construction budget. The contract added only 18 classrooms, however Mr.
Antolini noted plans to replace some existing classroom tables with desks/chairs. Lead time is 5-
7 weeks on furnishings. Acting Chairman David Young referred to a December, 1999 agreement
with Principal Ed Rosa to cap School Furnishings at $157K and revisit possibility of additional
purchases provided funds are available at the end of project. David Young commented that this
money has been expended and that due to unforeseen conditions MBC could not release
additional funds at this time.
Locker Room Changes — Linc Lynch reported that the changes proposed in the locker room area
do not meet the needs of the School Dept. Locker room doors can not be locked due to egress
issue. Purpose was to have secure locker rooms as well as equitable facilities in the girl's locker
rooms. David Young suggested alternative to add one additional exterior exit. Wallace Floyd to
modify plans. School Dept. to approve subject to modifications. Walter Parker to verify fencing
enclosure for exterior egress. Sue Michael -Brown noted that modification to the plan would
delay drawings going to JTC. Cost Proposal from JTC can be expected 2 weeks after that time.
COMPOST FACILITY
MOTION to appoint Jim Liddick as acting Chairman for the purposes of Compost Facility
Discussion. WM/KG: Passes 4-0.
Atlantic Contract Systems - Upgrade existing electrical service. Mike Ahern reported plans to
accept a credit reduction of $42K. CDM has endorsed concept of credit. Mike Ahern requested
MBC support.
MOTION to accept contract cost reduction pending CDM approval for supply and
installation of the FRP liner panel system. KG/WM 3-0-1. David Young abstained.
Change Order No. 2 — Ref. Upgrade existing electrical service.
MOTION to recommend payment to Fraser Engineering to furnish and install transformer
grounding and grounding at the utility pole in the amount of $18,354.00.
JL/WM: Passes 3-0-1. David Young abstained.
Amendment to Contract - Mike Ahern presented a proposal to appoint an on site steel inspector
for three days per week at a cost of $10K. Board of Selectman is aware of this proposal and
supports the contract amendment.
MOTION made to support contract amendment to CDM to include appointment of one
steel inspector to be on site for three days per week at a cost of $10K
WMXG: Passes 3-0-1. David Young abstained.
MOTION to have David Young resume as acting Chairman. JL/WM: Passes 4-0.
MANSFIELD HIGH SCHOOL
Guidance Suite — Discussion opened Re: School Dept. request to add one additional office.
Project Coordinator noted that Guidance/Administration is a priority area for September
completion and that the Contractor needs direction as soon as possible. Approximate cost for
added work is $8K. Estimated cost does not include electrical outlets/mechanical and sprinkler
and mark-up. Based on excessive cost, Linc Lynch commented that the School Dept. would
withdraw cost proposal request. Regarding COP# 187 and COP#187A Ref. Guidance Changes,
WFDG to direct JTC to omit change, and generate new COP for work involving removal and
installation of new carpet.
Gym Bleachers — Segmented bleachers are specified. Walter Parker noted that shop drawings
approved have motorized crank handles, but not called for in specs. Motorized mules are
included per spec.
Chemistry Laboratory — Sue Michael Brown reported issue raised by School Staff that Science
Lab was never identified as Chemistry Lab in plans, therefore no gas piping was included per
specification. Estimate to provide piping and fume hood is approximately $50K. Currently
Science rooms have all other utilities except gas piping and fume hood. Project Coordinator
made suggestion to do three cores to floor at each sink and core cabinet for future installation of
gas piping. Ken Gay pointed out that a master shut off on gas pipe would be required. Project
Coordinator to follow up with pricing.
Painting Lockers — WFDG to issue bulletin to delete work to paint lockers so that School Dept.
can proceed with work. MBC requested WFDG to pursue credit for work not performed.
Change Order Proposals — Review/Approval
COP#122 Ref. Install Laundry Sink - $3,478. T&M Time slips were verified by Project
Coordinator. David Young requested Sue Michael Brown to verify work and
pursue credit for deletions in dark room.
Status: Approved as recommended by WFDG.
COP#154 Ref. Delete one Lavatory/Rm.132, Provide wall mount carriers in Rm. 240 -
$(382.00). TCI recommends an additional $100. Wallace Floyd to revise and
issue credit in the amount of ($500.00)
Status: Approved as recommended by WFDG.
COP#158 Ref. Ceramic Tile in Rms. 18B & Rmsl18C -$1,660.00. WFDG to issue change
order in the amount of $1660.00.
Status: Pending. JTC has not responded to revised amount.
COP#171 Ref. Credit for deletion of (2) floor mats at stairs of East/West Additions in the
amount of ($1,600.00).
Status: Approved as recommended by WFDG.
COP#183 Ref. Panels for Emergency Stand — Amount reduced from $798 to $782.00.
Status: Approved as recommended by WFDG.
COP#184 Ref. Telephone in elevator (phone only) - $307.00.
Status: Closed. Phone included in COP#184A.
COP#184A Ref. Telephone in elevator (phone & installation) - $702.00.
Status: Pending. School Dept. to investigate option to get phone from Signet,
install and run line to machine room.
COP#186 Install GWB Soffits in Hall 100 & 118 - $592.00. Soffits needed due to existing
pipe that needs to be lowered in hall.
Status: Approved soffits in the amount of $592.00 and installation of panel
based on T&M.
COP#187 Guidance Room Changes - $4,681.00.
Status: Void. Change proposed by School Dept. too costly.
COP#187A Guidance Room Changes - $3,496.00.
Status: Void. Change proposed by School Dept. too costly.
COP#18713 WFDG to issue new COP#187B in the amount of $1,265.00 to reflect removal
and installation of new carpet.
Status: Approved as recommended by WFDG.
COP#188 Modify existing Toilet Rm. 165 & Rm. 167 - $540.00. Existing toilet with new
stalls has problem with handicap clearance. Additional cost necessary to provide
custom size panel. JTC to provide credit for door. Sue Michael proposing sliding
track door.
Status: Pending. WFDG to request additional back up from JTC. MBC
agrees to concept of sliding door.
COP#193 Replace damaged wiring - $540.00. Water found in existing conduits in stage
area. Source of water unknown. Condition of wiring is corroded and was
recommended for replacement by TCI.
Status: Approved as recommended by WFDG, pending final review by
Walter Parker.
COP#194 Ref. Add 227V Lighting Load - $1,071.00. Auditorium
Status: Pending. TCI to review.
COP#198 Ref. Bulletin to demolish ceiling in Band/Ceiling Room. Demo of plaster ceiling
not included per spec. Discussion raised that sprinkler system needed. Jim
Liddick questioned what was specified by TCI for Fire Protection. WFDG to
follow up. ,
�- • Soffit — School Dept. requests ceiling be left as high as possible to meet
acoustical needs. WFDG specified ceiling height to be raised just high
enough to install fire protection. Sue Michael Brown advised the MBC that a
soffit is also needed due to two different ceiling heights. Installation of soffit
will be an added cost. Issue pending.
MOTION to recommend approval of the COP'S highlighted above. JL/KG: Passes 4-0.
Use of Gym/Town Elections - Request made by Town Clerk re: use of MHS gym for Town -wide
State and Presidential Elections to be held Sept 19th and Nov. 7, 2000. MBC to issue memo to
Helen Christian (Town Clerk) that MBC will address concerns with Contractor. Committee does
not anticipate any problem. Project Coordinator to issue notice to JTC that gymnasium must be
available by Sept. 19, 2000.
Countertop/Admin Area - JTC proposed deletion of existing countertop. MBC rejected proposal.
JTC to be notified to proceed as per contract.
Delay Request — David Young questioned status of response to JTC request (dated June 12,
2000) for time delay. David Young asked WFDG to issue response to JTC to provide
clarification as to how Science Room sink issue has caused a 2 month delay to the project.
Library/Air Quality — David Young questioned what steps have been taken to address air quality
concerns in Library reported by School Dept. Project Coordinator has contacted Johnson
Controls to investigate. Issue pending.
Space Needs — Project Coordinator noted comments from MHS Vice Principal that (2) science
rooms and chemistry room could be held off, however specialty classrooms are difficult to give
up. Joel Antolini to meet with Project Coordinator to verify specific classrooms that JTC could
hold up on turn over to School Dept. (re: not ready at school opening).
JTC/Chance Order 910
COP#33
Ref. Additional Engineering to ball field — ($500.00).
COP#45A
Ref. Credit for casework in Darkroom 127B — ($3,800.00).
COP#170
Ref Roof walkway pads -$1,157.00.
COP#172A
Ref. Relocate water main @ East Street - $1,809.00.
COP#177
Ref. Additional demolition in Kitchen - $3,257.00.
COP#178
Ref. VCT in corridors 114 & 116 - $4,600.00.
COP#180 Ref. Install GWB soffits - $2,268.00.
COP#181 Ref. Concrete deck on elevator shaft - $710.00.
COP4190 Ref. Exit sign covers in Gym - $633.00.
MOTION to recommend approval of the above referenced COP's as recommended by
Wallace Floyd Design Group. Total Change Order amount is $10,134.00.
JL/WM: Passes 4-0.
JTC COP LoQ -Jim Liddick noted that the numbering in JTC's COP Log is out of sequence.
Member Liddick asked Sue Michael Brown to verify with JTC that the missing Change Order
Proposal numbers are closed issues.
Enunciator Panel — David Young questioned Paul Letendre as to the status of work. Paul
Letendre responded that he might not have time to do this work as he previously offered. Mr.
Young noted that the Panel is required for school occupancy. Mr. Young asked Project
Coordinator to review his schedule and advise the MBC as soon as possible as to whether he will
provide this work.
QUALTERS MIDDLE SCHOOL
AC Unit/Administration — AC Unit still not working properly. Project Coordinator has notified
Johnson Controls. Issue pending.
Girls Toilet — Project Coordinator reported that (1) girls toilet was not installed as per
specification. School Principal to verify whether bathroom is needed. If not, MBC will pursue
credit. Linc Lynch to follow up with QMS Principal.
Kiln — Per spec. (1) kiln is to be relocated and installed in Second Floor Art Room. School Staff
wants to keep kiln in first floor Art Room. Architect verified that venting is not owned on First
Floor. MBC to issue letter asking School Dept. to reconsider kiln location back to Second Floor
as per spec. This will result in cost savings due to additional work that would be required to vent
and install kiln on first floor. Ken Gay commented that an additional cost is anticipated to fire
rate ceiling. Neither ls` or 2"d floor ceilings are fire rated.
Direct Payment Requests — David Young asked MBC Secretary to question Town
Treasurer/Accountant as to proper procedure to set up escrow account to address direct payment
issues.
INVOICES
Keyes Associates: C9410.01-51
MOTION to recommend partial payment to Keyes Associates for fees to Universal
Engineering involving abatement work performed in October in the amount of $475.00.
SL/WM: Passes 4-0.
Meeting adjourned at 10:30PM.
Respectfully submitted,
Eleanor McCarter, Secretary
David Young, Cler Date