HomeMy WebLinkAboutMBC 07/18/2000APPROVED
TOWN OF MANSFIELD
Municipal Building Committee
Meeting Minutes of July 18, 2000
Members Present: Richard Feeley (7:40 PM), David Young, Clerk, Kenneth Gay,
William Moore and Eleanor McCarter, Secretary
James Liddick — Vacation
Associate Members: Michael Ahern and Mark Cook, Edward Sliney
Robert Button — Excused Absence
Attendees: Steven MacCaffrie, Construction Consulting
John Savasta and David Woodbury, CSS Architect o
Steve Chmura, Keyes Associates a= U>
-
m
Meeting Commenced at 7:20 PM ca
FDMW FACILITIES — FEASIBILITY STUDY'
w
Introductions —David Young opened meeting as Acting MBC Chairman recognizanhos*
' rq
�o
present. Meeting was turned over to John Savasta for project update. Cor
cn a%
Project Minutes by CSS — Accepted with some revisions made by MBC Members.
rn
Benchmarking/Process — General update.
• Review of Existing Conditions — CSS David Woodbury presented various plans noting
layouts and brief description of the existing construction conditions.
• Programming - John Savasta noted that CSS staff would be speaking with Department
Heads within the next couple weeks for additional input.
• Preliminary Master Plan Design — John Savasta outlined three scenarios for discussion
purposes to locate a future "Municipal Center" in Mansfield;
SK -l: Keeps the existing DPW with modifications and adds an addition to the north side of the
building. A new structure combining the Fire Dept and MEMA is located at the west side of the
site. The Water Dept building is shown located on the Maple St. site. CSS noted that SK -1
anticipates removal of the fork in the road on Route 106 at East Street.
SK -2: Existing DPW Building gets demolished. DPW is relocated northwards on the site. Fire
Dept. and MEMA combined under one roof on the west side of the site. Option SK -2 anticipates
the removal of the fork in the road on Route 106 and the Water Dept. building being located on
the Maple St. site. Option provides for vehicles undercover and more green space than other
options. John Savasta noted structural deficiencies found with existing building. Prior to making
any decisions with regard to the disposition of existing DPW building, David Young asked that
any deficiencies found be well documented by structural engineer and others.
SK -3: Locates all departments on the existing DPW site and allows some cost savings. Plan
shows DPW located on the west side of site, Fire Dept/MEMA on the east side and the Water
Department on the north end of the site. SK -3 anticipates no change to the fork in the road on
Route 106 and enhances site lines for the Fire Department up and down Route 106.
MBC Comments:
DPW/Water Dept. Shared Space - David Young questioned the possibility of locating the Water
Dept. and DPW in a combined facility, having separate office areas for each department and
common rest rooms, lunch room, and conference room etc. Water Dept. and DPW initially felt
this was not feasible. DPW and Water Dept. shared inventory concerns with regard to common
stock pile of materials and equipment. Discussion was that all options should be explored.
Committee requested CSS to provide SK -4 to show a Water Dept./DPW combined facility.
Option to be explored further with Lee Azinheira, DPW Director and John D' Agostino, Town
Manager.
Fish & Game Dept./Right-of-Way — Ken Gay noted that the Fish & Game Dept. has a deeded
Right -of -Way at the existing Rt. 106 DPW site. John Savasta confirmed that site options do
allow access to the Fish & Game Dept. located on the right (east) side of property.
Estimated Square Footage: Conceptual layouts include 46,000 square feet of total space. CSS
plans show DPW/22,000 SF, Fire Dept./12,000 SF, MEMA/3,500 SF and Water Dept./8500 SF.
Estimating building costs at $150.00 per sq. ft., MBC members expressed concerned regarding
the total cost being too excessive to proceed with current plans. Need to scrutinize space needs.
North Main St. Fire Station - David Young questioned why CSS seemed to put emphasis on the
North Main Street Fire Station site. John Savasta responded that CSS was exploring re -use of
site. Mr. Young reiterated that the proposed new Fire Dept. accommodations should be based on
the existing Plymouth Street station (plus one bay) per the existing Capital Plan.
Report Deadline: MBC unanimously agreed that more time is needed to property develop the
Master Plan and that the final study report should not be rushed for the Fall Town Meeting. CSS
asked for direction as to how to proceed with the master plan. MBC to schedule Workshop in
two weeks with Town Manager and DPW Director to discuss.
CSS will wait for response from MBC.
QUALTERS MIDDLE SCHOOL
JTC Close out - Agreement was made between JTC and Owner on 6-6-00 to close out CO's #1
through #313. The final QMS Change Order 420 included the following outstanding change
order proposals in question for a lump sum of $25,000.00:
COP#54
Ref. Relocate washer/dryer — Paid in CO#16.
COP#68
Ref. Roof Drain inserts for existing drains.
COP#117R
Ref. SKP 38 new sump pump - $2,800.00.
COP#173
Ref. Previously paid in CO#16
COP#171F
Ref. Acceleration Painting not required for occupancy - $2,100.
COP#190B
Ref. Installing additional blocking at window openings - $5,005.00
COP#218
Ref. Oil Pumps boiler room — Agreed $799
COP#225
Ref. Revised to COP#313 Base cove - $1560.00 (work complete)
COP#229A
Ref. Partition Changes at rooms 121 A/122A - $394.00
COP#229B
Ref. Soffit at Corridor 150, Room 109 and 109A - $537.00
COP#240
Ref. Fireproof elevator #1 of fireproofing on steel. $2,314.00
COP#249
Ref. Relocate condensation link in corridor B 17A $1,477.00.
Steve Chmura to issue letter requesting credit for pipe in crawl space.
COP#257A
Ref. Patching & Matching - $7,224.00
COP#265
Ref. Emergency Electrical Closets - $1,520.00
COP#266
Ref. Install soffits at Zone 6 (CO#139) - $503.00
COP#268A
Ref. Install drywall ceiling stairwell S8&S9 - $500.00
COP#273
Ref. Flashing Collars for drains in kitchen - $1,664.00
COP#306
Ref. Paint wood in auditorium - $4,682.00
COP#309
Ref. Prime & Paint Guidance Office - $713.00.
Steve Chmura commented that based upon JTC's written response to MBC dated July 13, 2000
requesting specified COP's be excluded, Michael Callahan has not signed Change Order #20.
Committee members expressed opinion that the agreement made was final and did not support
re -negotiation. MBC Chairman directed Keyes to issue a rejection letter to JTC indicating that
previous approval of Change Order #20 (as agreed to on 6-6-00) is now void. Chairman
suggested the notification letter include reference to the Contractors responsibility to perform
punch list work and various change order proposal submitted, that have already been paid.
Steve Chmura presented seven previous outstanding Change Order Proposals to the MBC for
review/approval to be included in a revised Change Order #20.
COP#117R Ref. Install new sump pump, SKP38 - $1,412.00.
COP#218 Ref. Re -pipe oil pump set in Boiler Room - $799.00.
COP#229B Ref. Soffit in Corridor 150 at Office 109 - $537.00.
COP#249 Ref. Sawing, removing and replacing concrete floor - $690.00.
COP#273 Ref. Flashing Collars in Kitchen - $1,664.00.
COP#309 Ref. Prime & Paint Guidance Office - $713.00.
COP#313 (formerly COP#225) Ref. Install new base in Gymnasiums - $1,560.00.
MOTION to approve the above referenced Change Order Proposals as recommended by
Keyes Associates to be included in Revised Change Order Number 20.
DY/WM: Passes 4-0.
Credits — Steve Chmura to pursue preparation of credit Change Orders for 1) condensate lines
not replaced, 2) not installing water line in ceiling, and 3) bathroom not installed.
Exterior Punch list — Keyes to issue letter to JTC and to add courtyard items to list.
Carpet Damage at Administration — AC unit is still not working properly. Chairman asked
Keyes to verify that notice was sent to Contractor directing them to replace carpet due to damage
caused by AC problems.
Payin — Contractor requests permission to proceed with paving in November. Keyes to
investigate JTC's timeframe planned to perform work.
Kiln location — Issue re: letter received from QMS Principal requesting a change in scope of
work to keep kiln location on first floor. Additional work needed for installation on first floor
includes coring through floor and venting. Added cost is estimated at $4,000.00-$5,000.00.
MBC to send letter to Lincoln Lynch requesting direction as to whether the School Dept. would
incur the extra cost.
MANSFIELD HIGH SCHOOL
Construction Schedule — Discussion re: letter from MHS Principal regarding number of rooms
needed for occupancy by opening of school. MBC to issue response to School Principal (cc: to
School Dept.) reiterating previous discussion with Lincoln Lynch that in order to have
Administration/Guidance and classrooms available Music Room, Shop and gym would not be
available for first day of school.
Project Coordinator — With school projects winding down, Project Coordinator's work hours are
reduced to approximately 32 hours. As previously discussed with the MBC, Paul Letendre will
bill Town for services relating to the QMS/MIIS School Renovation Projects on an hourly basis
(vs. current salary) beginning July 3, 2000 through October 31, 2000. MBC to send notice to
Town Manager informing him of Project Coordinator's reduced hours.
INVOICES
CSS Architects
MOTION to recommend payment to CSS Architects in the amount $3,645.00 for services
related to space needs analysis and site plan. DY/KG: Passes 4-0.
Letendre Company - MHS
Requisition for Payment reflects hourly billing which began July 3, 2000.
MOTION to recommend payment to Paul Letendre for weeks ending July 8, 2000 and July
15, 2000 in the amount of $1,462.00. WM/DY: Passes 4-0.
Keyes Associates — Invoice No. C9410.00-56 - MHS
MOTION to recommend payment to Keyes Associates in the amount of $6,820.14 for
services relating to the Mansfield High School Project. Construction Admin. costs at 95%.
Includes $2,745.00 fee to WFDG plus $114.87 to WFDG for outside services.
DY/WM: Passes 4-0.
W.B. Mason — MBC Office Supplies
MOTION to recommend payment to W.B. Mason in the amount of $60.82 to replace
returned items purchased under FY2000 budget. KG/WM: Passes 4-0.
JTC/Application for Payment Number 8
MOTION to recommend payment to J.T. Callahan & Sons in the amount of $179,510.29
for services relating to the Mansfield High School Additions/Renovation Project.
DY/WM: Passes 4-0.
Meeting adjourned at 10:15 PM
Respectfully submitted,
Eleanor McCarter, Secretary
David Young
Date
e zQ --'moo'