Loading...
HomeMy WebLinkAboutPlanning 11/20/1973MANSFIELD PLANNING BOARD MINUTES November 20, 1973 The Mansfield Planning Board met at the Town Office Building of Tuesday, November 20, 1973 at 7:00 P.M. Present: Chairman Zaffini, Clerk Grant Planners: MacFarlane, Dunn, Wellington, Latham Planning Director Maurer 1. Board discussed signing document of release of contract terms with Universal Engineering. Motion: To sign release document for Universal Engineering. (Grant -MacFarlane, Dunn in favor, Wellington, Zaffini opposed) NOT VOTED Planner Wellington stated that he felt the document as written was uncalled for and that all that was needed was a simple letter from the Planning Board stating that the Board released Universal from the original terms of the contract. Planning Director Maurer to prepare draft of letter for next meeting. 2. Board reviewed the Capital Improvement Program for the assignment of priorities, Planner Wellington noted that costs in future years should be inflated. The following is the summary of assignment of priorities: Project Description Priority Comments Revaluation of Real Estate 6 Fire Department Aerial Truck A Bucket Truck - Utility Truck B Dual Control' Van type, 4 wheel drive, Chief's Vehicle B with plow and trailer Fire Alarm Extension A Pick -Up Truck Out New Fire Station Hold Refer to ,Building Committee Police Department Cruisers A Unmarked Vehicle D Additional Cruiser D Rotary File Hold Civil Defense Rescue Truck B Building Department Vehicle a Use should be tied in with Heads of Sewer Division Departments Pave inner -driveway C Final Sludge Pump A Comminutor Hold Utility Truck No truck for sewer sus Minutes November 20, 1973 Pro:iectrDescription B Prior Board of Health Sidewalk Plow B -C Sanitary Landfill - Plans A Sanitary Landfill - Land D Acquisition C -D A Sanitary Landfill - Site A Development D C Sanitary Landfill - Bulldozer C Highway Division More Resurface Memorial Park z Ton Pick-up Truck (Utility) B One Ton Dump Truck Tractor Mower A -B Dump Truck (41,000 GVW) A Catchbasin Cleaner Magna Vista Recreation Area B ity Tractor Loader B Street Sweeper A Sidewalk Plow B -C Road Sander A Aggregate Sander A Air Compressor D Highway Garage Addition C -D Library Library Renovations A Library Expansion D Recreation Pave Tennis Courts A Memorial Park Land Acquisition More Resurface Memorial Park Driveway A Tractor Mower More Garage & Storage Area Hold Daniel F. Ryan Park Hold Magna Vista Recreation Area C Conservation Rumford River/Fulton Pond Beautification A Kingman Pond Restoration B Cabot Pond Restoration D Mill Pond Restoration D Wading River Land Acquisition D Canoe River Greenbelt A Land Acquisition Fund A Water Division i Ton Pick-up Truck C 3/4 Ton Utility Truck D One Ton Dump Truck A Backhoe Loader C Van Truck D Tapping Machine D Airport Comments Duplication from funds for Conservation Need for replacement on frequency Contract for one year, then pur- chase right type of equipment For trade in only To Building Committee Building Committee information information - refer to Building Committee - more information Expansion of Aprons Hold - D Council on Aging Minibus A Major Projects Street Improvement Program Chapter 90 A Duplication for Landfill Site Trade - No transfer to Sewer Dept. -3 - Minutes November 20, 1973 Project Description priority Annual Improvements A Traffic Signalization Hold Street Reconstruction Program Chapter 90 A Major Reconstruction A Drainage Improvement Program Drainage Projects A Stream Improvements A Drainage Master Pian Implementation Back Bay Brook D Major Projects B Sewer Improvement Projects Sewer Extension A Infiltration No request Sewer Master Plan Implementation Major Projects B -C Regional Sewer Program A Water Projects Annual Improvements A Water Master Plan Implementation Water Main Extension p Dustin Well A Well Exploration Program A -Hold Water Main Cleaning A -Hold Auxiliary Power A Well Cleaning Program A -Hold Monitoring Program A -Hold Airport Master Plan Implementation D Great Woods Land Acquisition Maple Park Development Hold Schools Beautification Program Comments No funding South Main Street - Willow Street Sell at Town Meeting Planning Director noted that there would be approximately $270,000 in revenue sharing funds for 1974-75 and felt that all revenue sharing funds should be allocated towards Capital Improvements and not towards salaries as they were in 1973-71+. Motion: That the Planning Board recommend that all Revenue Sharing funds for 197L+-75 be appropriated for Capital Improvements. (Latham -Grant, all in favor) VOTED 3. Board noted that the water line had been shown on the plans for Darby Drive and Lawndale Road. The pipe had been located with a metal detector and that the Water Superintendent was there when the pipes were located. Motion: To release the $9,000 being held for Magna Vista and that the Planning Director not go to Stoneham with Bristol Equipment, for the exchange of funds, and further, to write Mr. D'Annolfo a letter requesting that when he sends the deed for the recreation area the Town will forward the balance of the bond being held for that project. (Wellington -Grant, all in favor) VOTED �� �erk / �,� Date