HomeMy WebLinkAboutPlanning 02/27/1973MANSFIELD PLANNING BOARD
AGENDA
February 27, 1973
1. Cali to order (7930 P.M.)
2. Clerks Report
a. Correspondence
b. "Minutes of February 20, 1973
3. Warrant
4. Visitors Agenda
8:00 P.M. Guido(Scarpellini re Walnut Park
8:15 P.M. William Slattery re Boro Sand and Stone
5. Old Business
Status of Pians
1) Walnut Park - Def. Sub,
2) Boro Sand and Stone - Gravel Permit
3) Joseph Gonsalves - Form A - Mill Street - 2/5/73
4) 'Leo Costanzo - form A Pratt St - 2/27/73
5) Paul Jodice - Def. Sub.'- Elm Street - 4/13/73
6) 'Elaine Ekstrom - Form A - Fruit Street'- 3/6/73
6. New Business
Around the Table
7. Adjournment
i
f
Ii
MANSFIELD PLANNING BOARD
MINUTES ,
February 27, 1973
The Mansfield Planning Board met at the Town Office Building on Tuesday,
February 27, 1973 at 7:30 P.M.
Present: Chairman Mendes, Clerk Grant
Planners: Zaffini, Latham, MacFarlane, Wellington
Town Planner Maurer
1,. Lettere were read from the following:
Planning Board to Mr. William D'Annolfo regarding setting stone bounds
within the Magna Vista Recreation Area.
Mr. William D'Annolfo to Planning Board regarding setting stone bounds
within the Magna Vista Recreation Area.
Planning Board to Mr. William D'Annolfo regarding setting stone bounds
within the Magna Vista Recreation Area.
Planning Board to Mr. John Dalton at the Department of Community Affairs
advising of the Planning Boards acceptance of Phase 11 of the Comprehensive
Pian ing Progra ( oard signed letter based on motion of metting of February
20, 97g3 item m 31
Planning Board to Paul Jodice regarding,Village Estates Subdivision.
Mansfield Conservation Commission ,to Charles Boutas regarding building on
wetlands on :Leonard Circle.
Mansfield Conservation Commission to John Taylor of Fox Run Realty; Trust '
regarding building on wetlands on land adjacent to East Street.
Planning Board to William Slattery of Boro Sand and Stone, Inc, regarding;
application for a gravel removal permit.
Planning Board to Board of Selectmen advising of the Planning Board acceptance
of the resignation of Chairman Robert W. Mendes.
Department of Natural Resources to Joseph Gonsalves regarding notice of intent
and ;plans dated January 22,>1973 - Town Planner Maurer noted that the Mansfield
Conservation Commission had voted in favor of Mr. Gonsalves and several residents
wrote to the Department of Natural Resources against the project so the Depart- '
ment of Natural Resources is requesting more definitive information.
Copy of the Mansfield Conservation Commission's guide lines for Maintainance
of Open Space with Cluster Developments as regulated under Section 6 of the Town
of MansfieldZoning By-laws.'
Cabot, Cabot and Forbes to Planning Board regarding the installation of the
flowmeter at School Street on Hodges Brook. -
Residents of Pine Needle Park to Board of Selectmen requesting that the
Building Codes for the Town of Mansfield be reviewed.
-3 -
Minutes
February 27, 1973
plan to the second Form A and resubmit this plan.
Mr. Slattery informed the Board that he had taken his gravel removal plan
back because the Board had required that the boundaries be 100 feet from
excavation and that the test borings that the Board had requested they redig
were within the 100 feet of excavation. Mr. Slattery pointed out that the
by -Jaw did not stated that the borings have to be within the excavation area,
and that they did not want to redo the test borings if it was not necessary.
Chairman Mendes questioned that if the took the 3 test borings out would it
leave 1 test boring per acre. Mr. ;Slattery stated that the law does not
-say::that_the_I-peracre has__to be_within the excavation area.
Motion: To accept the testborings as shown on the plan as being sufficient
for the lot.owned by BoroiSand and Stone, Inc.
(Wellington-Zaffini, all In favor) VOTED
Mr. Slattery; questioned the 5 acre grid system for bonding. TheBoard informed
him that it had been increased to 10 acres at a time. Mr.Slattery questioned
if they could bond,5 acres in one corner and 5 acres in another corner of the
lot.Town Planner Maurer stated that the '10 acres should be in one area.
Mr. Slattery requested to bevpu,t:on the Agenda for Monday, March 5, 1973 to
have his plans reviewed.
8. Board reviewed the preliminary plan for Cabot, Cabot and Forbes for the remaining
portion of their land. (Clerk Grant left the room and did not participate "In".
any discussion.) It was noted that they are going to extend Plymouth Street
and that the road will loop around and form 3 cul-de-sacs. It was noted that
they had made provisions for a roadway to go into the land that is reserved for
the retension area. It was, noted that the 'drainage is carried dhows along the
proposed Plymouth Street. It was `noted that there was a little 10,000 feet
of ro€Idway in the development. They are running a 12 inch water main from
Plymouth Street and a�29"water main back out to West Street.
t ,
It was noted that the profile plan was too long to review and Town Planner
Maurer to cut them down for the meeting on Monday,'; March 5, 1973.
9. Board reviewed the definitive subdivision plan for Magna Vista It It was
noted that they had added detail for all the drainage ditches and they had
changed the 'lots that did not have the required frontage. Town Planner Maurer
pointed out that lots 17, 1$, 19, 20, and 21 it should be indicated that no
building permits can be issued before these lots are approved by :the Conservation
Commission. It was noted that the Planning Board had requested Mr. Boutas to
submit a copy of the plans to the Conservation Commission for their review and
it has not been done yet.
It was noted that the plan is missing the North arrow, missing the bounds to
be set, they never 'brought any covenanit information in, the delta is not
correct on thtersection of Lawndale Road and Darby Drive, there are no bench
marks, and on lots 10 and 11 on the street plan there is the wrong curve
information on sheet 3 and to request them to straighten out the cul-de-sac
between lots 10 and 11.
Minutes
February 27, 1973
7.
- 2 -
William J. Savilonis to Board of Selectmen :regarding the scheduled appointments
to the Planning Board.
House ,Bill #2486 - An Act Providing for the Voluntary Registration of Professional
Planners -'set aside to be discussed later.
Motion: To approve ;the warrant of February 27, 1973 in the amount of $42.40
(Grant -Latham, all in favor) VOTED
Board reviewed the minutes of February 20, 1973 and ,noted the following changes.
Page :3 #9 - It was noted that 6n #9 they would have to redo the proposed contours.
Motion: To accept the minutes of February 27, 1973 as amended. 1
(Wellington -Latham, all in favor) VOTED i
Board reviewed the Form A Plan for Leo Costanzo for land on Pratt Street.'' i
It was noted that the revision date had been added as requested and that a
note had been added to read"On the original plan parcels A and B were shown as a
single lot., The plan was changed for Costanzo to claim parcel B only."
Motion: To sign the 'form A plan for Leo Costanzo for land on Pratt Street.
(Grant -Latham, all in favor) VOTED
Board reviewed the Form A Plan for Elaine Ekstrom for land on Fruit Street.
It was noted that the revision date had been added as requested and that a
note :had been added to read 'This plan revised due to a change in the first
name of owner."
Motion: To sign the Form A Plan for Elaine Ekstrom for land on Fruit Street.
(Wellington -Latham, all in favor) VOTED
Board reviewed the preliminary subdivslon plan for 'Bristol County Builders .
entitled "Oakhill" for land off of Stearns Avenue. It was noted that the nearest'
fire hydrant in Mansfield was 6/10 of a mile from the subdivision. It was 'noted
that an open ditch easement would be running through the property of Carl Kane.
Town Planner Maurer felt that before the public hearing Mr. Kane should be notified,:;
to be certain he has given his consent to the easement. It was the consensus of the
Board to check with Mr. Kane to see if he has given his consent to the drainage
easement and to also to have the proposed pipe going under the road approved by
the Easton Planning Board.. Clerk Grant noted that there were no corner roundings
and that they would need an easement on the corner roundings.
Board met with Mr. William Slattery of Boro Sand and Stone, Inc. to discuss the
application for gravel removal. Mr. Slattery stated that he would like to :have
the preliminary plan signed as a Form A so that it could be recorded. Mr.'
Slattery pointed out that it was the 'same plan only they had added the note
"Planning Board approval under the subdivision control laws not required." It
was noted that the first Form A submitted was missing the `following 'information:
Not Total area, no locus plan, no zoning classification, no Town names at the Town
lines, no abutters shown.
Mr. Slattery then submitted a second Form A for the same parcel. It was noted that
this plan was missing the locus plan and the zoing classification. It as
consensus of the Board to have them add the zoning classification and tie 1�1c
2.
3.
G
1
4.
5.
6.
7.
- 2 -
William J. Savilonis to Board of Selectmen :regarding the scheduled appointments
to the Planning Board.
House ,Bill #2486 - An Act Providing for the Voluntary Registration of Professional
Planners -'set aside to be discussed later.
Motion: To approve ;the warrant of February 27, 1973 in the amount of $42.40
(Grant -Latham, all in favor) VOTED
Board reviewed the minutes of February 20, 1973 and ,noted the following changes.
Page :3 #9 - It was noted that 6n #9 they would have to redo the proposed contours.
Motion: To accept the minutes of February 27, 1973 as amended. 1
(Wellington -Latham, all in favor) VOTED i
Board reviewed the Form A Plan for Leo Costanzo for land on Pratt Street.'' i
It was noted that the revision date had been added as requested and that a
note had been added to read"On the original plan parcels A and B were shown as a
single lot., The plan was changed for Costanzo to claim parcel B only."
Motion: To sign the 'form A plan for Leo Costanzo for land on Pratt Street.
(Grant -Latham, all in favor) VOTED
Board reviewed the Form A Plan for Elaine Ekstrom for land on Fruit Street.
It was noted that the revision date had been added as requested and that a
note :had been added to read 'This plan revised due to a change in the first
name of owner."
Motion: To sign the Form A Plan for Elaine Ekstrom for land on Fruit Street.
(Wellington -Latham, all in favor) VOTED
Board reviewed the preliminary subdivslon plan for 'Bristol County Builders .
entitled "Oakhill" for land off of Stearns Avenue. It was noted that the nearest'
fire hydrant in Mansfield was 6/10 of a mile from the subdivision. It was 'noted
that an open ditch easement would be running through the property of Carl Kane.
Town Planner Maurer felt that before the public hearing Mr. Kane should be notified,:;
to be certain he has given his consent to the easement. It was the consensus of the
Board to check with Mr. Kane to see if he has given his consent to the drainage
easement and to also to have the proposed pipe going under the road approved by
the Easton Planning Board.. Clerk Grant noted that there were no corner roundings
and that they would need an easement on the corner roundings.
Board met with Mr. William Slattery of Boro Sand and Stone, Inc. to discuss the
application for gravel removal. Mr. Slattery stated that he would like to :have
the preliminary plan signed as a Form A so that it could be recorded. Mr.'
Slattery pointed out that it was the 'same plan only they had added the note
"Planning Board approval under the subdivision control laws not required." It
was noted that the first Form A submitted was missing the `following 'information:
Not Total area, no locus plan, no zoning classification, no Town names at the Town
lines, no abutters shown.
Mr. Slattery then submitted a second Form A for the same parcel. It was noted that
this plan was missing the locus plan and the zoing classification. It as
consensus of the Board to have them add the zoning classification and tie 1�1c
4
Minutes
February 27, 1973
10. Board reviewed the drainage plans for the Walnut Park subdivision off of
Walnut Street. Town Planner Maurer pointed out that if the Board did not
received a majority vote at this meeting that he felt they should ;inform
the applicant as to 'why his plan was not being approved. Town Planner
Maurer pointed out .that the applicant was requested by the Town .to work out
a solution to the drainage on Walnut Street and that the applicant has been
very co-operative with the Town. Planner Zaffini questioned if the drainage
line: was big enough,_to take care of Walnut Street. Town Planner Mauer pointed
out that he had increased the drainage line from 18 to 24, from 15 to 18 and
then carried a 12 inch to Walnut Street.
Planner Well questl>oned where the Town proposed to put their basins on
Walnut Street and what Information did they have to show that the basins will
take care of it. 'Planner Wellington stated that his calculations showed the
drainage will start 2 feet; below Walnut Street, which he felt was kind of high.
Planner Wellington stated that someone will have to prove, to him that he can
drain as shown, and that he could go down another 4 or 5 feet wo they would
not have the water running up hili. Planner Wellington questioned the invert
Of the first manhole and that he would like to have it proved that it is
correct invert. Planner Wellington stated that he did not feel it was the
jobrof the applicant to prove that, this system will work on Walnut Street,
that it was the responsibility of the Town but he would like to be sure it
will work before he signs the plans.
Planner Latham stated that he felt it was too wet to build there to begin with.
Chairman Mendes stated that they were not voting on the subdivision itself but
on the drainage as the subdivision has already been approved.
Town Planner Maurer obtained copy of the Towns proposed drainage for Walnut
Street from the Town Manager. Planner Wellington noted that there was a 2z
a
foot culvert running up Walnut Street and a.2 foot culvert running accross
Walnut Street. Mr. Scarpellini's pian shows and 18 inch ',pipe on Casa Drive
and the Town's plan shows a 12 inch pipe ,on Casa Drive. Chairman Mendes stated
that he felt the plan should be signed but he felt the questionson the drainage
should be solved first. Planner Wellington stated that he felt the two plans
should agree and that he felt Mr. Scarpellini should drop his first catchbasin
down about 'I foot:Town Planner Maurer to have the Townsend their plan back
to Engineer Maloon to check the depth of the pipe and so 'forth.
Motion: To approve the plan with She condition that the, drainage system be
proved to be operative to the satisfaction of the Planning Board.
(Grant-Zaffini, all in favor) VOTED
11. Town Planner Maurer informed the Board that he had the first reading from the
flowmeter and questioned how he could convert it to volumn of water. ,(Clerks
GrantJoft the room and did not participate in any discussion.) Planner
Wellington stated that if it is flowing 5 feet per second and the opening
of the cuivers_is 20 square feet then you have 100 cubic feet of water per
second running through there. Planner Latham stated that the flow would
remain constant as far as speed.
Town Planner Maurer informed the Board that the flowmeter was not vandal proof r
and the 'letter from Cabot, Cabot and Forbes pointed out that it was installed
and Town Planner ,Maurer felt that Cabot, Cabot and Forbes might now feel that
the Town is responsible for it. Chairman Mendes pointed out that the Town is
not responsible for it until it is accepted by. Town -Meeting vote. Town Planner
Maurer stated that he felt the Planning Board should write a letter to Mr.
Dalton stating this fact so they are aware it is still their responsibility.
-5 -
Minutes
February 27, 1973
Chaieman;Mendes pointed out that the Selectmen could possibly accept the flow-
meter as a minor gift and Town Planner Maurer to check this out with Town Counsel.
Planner Latham also noted that before it is accepted that a stop should be put on
the float.
Motion To check with Town Counsel as to the legality of accpeting the flowmeter
and inform Cabot, Cabot and Forbes by letter that they have referred the
question of acceptance procedure to the Town Counsel, but the Board feels
it should not be accepted until the housing unit has been built around it,
and to request full care and custody of the flowmeter upon its acceptance.
(MacFarlane-LatMam�rall i:r-.favor) VOTED.
12. Town Planner Maurer informed the Boardthat Mr. Edward Stivelletta was concerned
with the fact that Bonney Lane was completed through station 7 plus ;0 and that the
Board has released the Bond in full about 9 months ago yet the Town has not plowed
or maintained the street at all, and he would also like to know when the street was
going to be accepted. Chairman Mendes stated that he did not feel the road should
be accepted until is was completed in its entirety or they would end up with a 700
foot dead end road and that the maintainence of the street was up to the Board of
Selectmen. it was noted that no policy had been formally adopted to discourage the
acceptance ofpartially completed roads. Chairman Mendes stated that he felt they
should make the contractor bond so that the Town will be certain that the road will
be completed as it is orig.iOally designed and not to let them bond just 700 feet
and then not continu#4 as the Town will end up with too many ;long dead end roads.
13. Town Planner Maurer informed the Board of House Bill 2486, The Act Providing for the
Voluntary Registration of Pvofessional Planners. Town Planner Maurer informed the
Board that it was submitted by 'the Mass. Society of State Engineers and that he was
of the ;opinion that it should be defeated, as he was not certain that registration
was necessary to protect the public welfare. Town Planner Maurer pointed out that
a qualified professional that puts in 360 weeks of effort received the same status
as a Planning Board member who; puts in 6%, of the effort. Town Planner Maurer stated ,
that the Conference of Massachusetts Planning Boards had requested him to discuss this
matter with the Planning Board. (Mrs. Carol Thomas.)=
r
Motion: To write a letter to Rep. Ames regommeadi,ng;that House Bill 2486 be
defeated.
(Wellington -Grant, all in favor) VOTED
14. Town Planner Maurer pointed out that the Traffic Study Committee would be sending
out questionares through the Bight billing department to get the opinion of the
Mansfield residents on the traffic system in downtown Mansfield.
-15. Town Planner Maurer pointed out that,theyhad talked of setting up a,project list
for the year and wanted to know if the Board wanted to set up a project Iistfoe
1973, either for the Board as a whole ;or just for the Town ;Planner.Chairman
Mendes suggested that each member consider the work ,projects and write down their
ideas to be compared at the next meeting. Planner MacFarlane felt that nothing
could be as high a priority as sewer and then they should consider drainage and
water.' Chairman Mendes stated that once you picked an area for sewer it was cheaper
to do all three projects while the roads were dug up.
5. 16. Clerk Grant stated that he felt,after the turn out at the Special Town Meeting on
Monday, February 26, 1973, that the Board did not work hard enough to sell the zoning.
Planner Wellington pointed out that there was an article right in the center of the
Mansfield News on February 22, 1973 and it was noted that it was also in the Attleboro
Sun on February 22 and February 26, 1973.
Minutes
February 27, 1973
17. Town Planner Maurer pointed out that he had attended a meeting the previous, week
and there were only about 6 people present to discuss the Cluster Developmentand
that he felt many people were loosing interest.
18. Planner Zaffini`questioned where the drainage for the Stivelleta apartments was
going. -Town Planner Maurer pointed out that it was going to the Back Bay Brook.
Planner Zaffini;questioned why iHppe Street had been dug up right into the project.
Clerk Grant stated they were _going 20 or 30 feet on Hope Street with the drainage.
Planner Zaffini'stated that it had been dug up about 300 feet and a 18 inch cement
pipe was being laid. Town Planner Maurer stated that the water was supposed to be
going into the Back Bay Brook. After reviewhng the plans it was noted that there is
a stream off of Hope Street that would carry the drainage into the Back Bay Brook.
19. Chairman Mendes asked if any member of the Board would like to go to Taunton on
Wednesday, February 28, 1973 to the SRPEDD Meeting. There was no response.
20. Meet i�g adjourned at 10:10 P.M.
Clerk f
6/ �l
Date