HomeMy WebLinkAboutPlanning 07/17/1974MANSFIELD PLANNING BOARD
AGENDA
WORKSHOP MEETING
July 17, 1974
1. 7:00 P.m. meet at Owens-Illinois to see liftstation
2. Meeting with Bill Cahoon re, Specifications for lift station and sewer
for Great Woods Development'
3. Clerk's Report
a. Correspondence
b. Minutes of July 10, 1974
4. Warrant
1
5. Status of Plans
ti
-zl Ilvllmt R^1!.1p V l , I s: , wU, . a„ vu.
MANSFIELD PLANNING BOARD
MINUTES
July 17, 1974
Present: Chairman Zaffini
Planners: Dunn, Latham, Wellington, Parsons
planning Director Maurer
1. Board met at Owens-Illinois on Francis Avenue at 7:00 p.m, to review the
sewer lift station which is being installed.
2. Motion: To appoints Planner: Dunn Acting Clerk.
_ _„ ._ a ., VOTED
apartments. Mr. Cahoon presented pictures -or the wenn-i11111u
ation.
ion then reviewed the Planning Boards letter of July 3, 1974
id 2 1/2 inches.
Mr. Cahoon noted that on item k, regarding stanaarizea eiecLriudi Luny u,
panels that he was ;partial lto Cutler & Hammer and further noted that they
are having problems getting control panels. Chairman Zaffini noted that
the electrical control panels are basically the same that it is the availability'
that will have to be considered.
Mr. Cahoon stated that he would like the see the specifications go to the
engineers in Boston. Planner Wellington, questioned what Mr. Cahoon thought
about the system at Owens-11linoiF,. Mr. Cahoon stated that he would rather
see'a frame manhole. Planner Wellington noted that the specifications should
specify two manholes over the pumps. He further noted that instead of
5 x 10 it should have a 50 foot specification to open it up to circular systems
and that circular systems only require one manhole. Planner Wellington
stated that he felt you could get ;more people into the circular system than
in the system they; reviewed at Owens-Illinois and that there is more working
4 room in the circular systems, Mr. Cahoon 'stated that he ,is only trying to
standardize the system for the Town.
2
Minutes
July 17,, 1974
Chairman Zaffini noted that the exhaust fan on the; system at Owens-Illinois
is on a timer;and questioned if there could be a switch or automatic device
the 'cost would be outrageous. Mr. Cahoon aha point out tnat most
motors are explosion proof. Planner Latham questioned if the swi
explosion proof and Mr. Cahoon noted that this isnot necessary a
is in the bottom of the chambers.
Mr. Cahoon noted that there Is one safety 'item that should be kep
and, this is'a mine safety lamp. After opening the hatch you turn
on; if the lamp goes out then there is gas and no one should ente
Mr. Cahoon stated that he agreed whole-heartedly with the Plannin
_.__ c_i,. 'e. "--- _:_k+k- t+o +ha+ thav are Plinth foroettina
year was $245,000, on December 31st., compared'
1961 of $81,000. Mr. Cahoon noted that some of
had disc meters and the Town would be loosing m
in compound meters. Mr. Cahoon further noted t
Factory is out being repaired and the water bil
the replacement of the mains on So. Main Street to Fruitcbtreet. Mr. Lanoon
t noted that the price of pipe is high, $8.65 a foot, and hydrants are running
$418 each. r Chairman Zaffini questioned how they could find the tops of the
fire hydrants in the snow with the color they are, presently painted. Mr.
3
Minutes:'
July 17, 1974
f Cahoon noted that he places flags on the tope of the hydrants during the
winter and all the hydrants are shovelled out. Planner Wellington questioned
why they did not paint the hydrant tops different colors to determin the gize
of the mains. Mr. Cahoon noted that they used to ;paint the gate valves different
colors for this purpose, however the paint would wear off. Mr. Cahoon stated
that he could tell the size of the :main by the number of turns of the gate
valve and also that once the gate valve is removed there is a tag to tell what
size the main is. Mr. Cahoon noted that the majority of the •mains in Town
are 6 or 8 inch lines.
Mr. Cahoon pointed out to the Board that there are no sewer regulations in
the Town of 'Mansfield.
4. Letters were read from the following:
Board of Health to Planning Board regarding subdivision of Woodland Park.
Board of Health to Planning Board regarding Definitive Subdivision Plan
for Mansfield Industrial Park Realty Trust.
Board of Health to Planning Board regarding Wading; River Park Subdivision`.
Margot Jellinek to Board of Health regarding property of Mr. Russell Taylor
for land on 'Brown Ave.
Building Inspector to Board of Appeals regarding the application of
Murphy's Service Station.
Prescott, Bullard & Mcleod Counsellors at Law to Planning Board regarding;
release form for Elmwood Park. ® held aside
Morley & Morley, Attorneys at Law, to Planning Board regarding release
of lot 10 on Bonney Lane. -'held aside
Planning Board to Building Inspector regarding site plan approval for
Karl:'Clemmey.
Planning Board to White & Kelly regarding preliminary plan for Woodland Park.
Planning Board to Home Developers regarding Drainage Plans for Green Acres
Subdivision South of Maple Street.
f
4
Minutes
July 17, 1974
Planning Board to Board of Appeals regarding Varianceand Special Permit
App 1'' t'
Pla
Sta
Pla
Pla
Pla
aca lona
fining Board to Board of Appe
Aon
s+regarding application of Murphy's Seri
sjregarding application of Ralph '1. Mal(
3oard to Town Treasurer regarding New Mansfield Estates - Bond Relei
3oard to Town Manager regarding interuption of Planning Board meetim
I to Ryan, Elliott and Company regarding Approval not req
s Avenue.
and Company to Town Clerk regarding approvalnot require
venue.
rIJwU-ri(JU./
:d the minutes of July 10, 1974 and nopd the following:
18: to read (Wellington -Parsons, Zaffini, Latham, Dunn, in fa'
Grant abstained, MacFarlane present but not voting) VOTED
accept the Minutes of July 10,;'1974 as amended:
-sons-Wellington, all in favor) VOTED l
the Form A Plan for Fred J. Findlen as voted at the meeting 1
1974.
the Form A Plan for Eleo J. Zaffini as voted at the meeting
1974.
;d the Form A Plan for Michael J. & Carol G. Cook, for two lots
a. Planner Wellington noted that lot A had the frontage
the land of Margot Jellinek and questioned if the lot was
stage since the frontage was not continuous. A letter to
We111ngLU11 pUlMLCU UUL
L ldl.': SUlllUVlle:. UUUIU lld Ve iG
1=1. UI IlUJILUIJU ill
10 different areas on a
street and that would give
'him 120 foot frontage
if It does not have to
be continuous.
i
9. Board reviewed the Form
A Plan for Fireside Realty;
for land on the East
side of Branch Street,
Planning Director Maurer informed
the Board that this
plan was submitted last
March and withdrawn becuase of the question oflocat;idn. i
of the easement. Planner Wellington stated that he
would like to check the
5
Minutes
July 17,`1974
layout of this plan with respect to, the subdivision plan which was submitted
t
back on December 4,;1973 as it appears that he has changed the entrances to
the proposed roads. It was noted that the ;plan would have to be stamped
"approval of this plan does not imply approval of any future road for any
future subdivision." It was noted that lot 3 is not a buildable lot as
it does not have enough frontage. Planner'Wellington suggested having them`
square the lots off iso that lot 3 would be buildable. Form A Plan for
Fireside Realty Trust to be reviewed at the next meeting along with the
preliminary plan for Pine Terrace Estates submitted in 1973. Planner
Street between lots i6
of the Board not to-fc
is reviewed further at
10. Board reviewed the For
Planning Director Maur
is no Form IA Applicat
was not tied down to 'e
there was no Zoning cl
to the lot lines were
ownership and does not
on July 24, ;1974 tc
reviewed by Mr. CaF
with the following;,
1) Drop inlet shoe,
2) Pea Stone to bE
3) Lateral connect
4) one section ofl
Planning Director t
lift stations. Pie
permission from the
on Town property be
does not own. Plar
easement on Town prop
that a note be placed
being granted to thef
Planner Wellington no
go before Town Meetin
a
change. It
even if the
they could
land they c
to try to k
new routing
the G
tha t
ns fu
ent o
he wa
belov
applicant u
f
reat Woods'Developm
Mr. Uazza would be`---
rther and that the
the Sewer and Wat
was noted that the funds are not even completely available and
impact statement were complete and they could start a'll that
io for now is from Route 495 to School 'Street as that is the only
Vn. However, the DPW stated that it is up to the Planning Board
hep lots from being developed in the proposed Oath of the Route 140/25
6
Minutes
July 17,; 1974
R___a___.._ .:„a 01....h1, nirarYnr MAIWAr infnrmPd the
Board that PHouse 8! 11 !>ob4 it An HCL 10 KeV:l Se Me zUw111y n'L "+e
been; passed ;by the Nouse of Representatives and is now in the Senate so that
changes should not be made until action isPtaken on this bill.
14. Board discussed the Subdivision Regulations and Planning Director Maurer
noted that there were several items that were brought up in the past as
follows:
a) Temperature for paving 320 and rising
b) Fee to he changed
c) Requirement to show trees on all subdivision either be better designed
or eliminated
d) Under the new zoning for wetland protection the plane ;will need more
information on brooks and streams both on Form A plans and subdivisions.
It was noted again that there are no sewer; by-laws and question has been raised
regarding the minimum pitch.
Planning Director Maurer to have a list of items to be considered for amending)
to be presented to the Planning Board.
take -an easement -in Norton to pipe the interceptor. If hk?nsfi.el;,,d' goes with this
proposal then Mansfield can expand, and improve the existing plant. If Norton
wants to join the Regional System at a later time then they will be required
to 'pump the untreated affluent to the Mansfield plant and have to pay for
the; expansion of the Mansfield plant to facilitate them. The same is true
with Foxboro. When the interceptor is constructed it would have to be
7
Minutes
July 17,`1974
constructed for the capacity of the three towns. Mansfield would have to ;pay
the whole 10% and then when 'Norton and Foxboro join, they will have to
reimburse Mansfield,
20. Board reviewed the letter received from Aetna Life and Casualty regarding
the release of the bonds for the final pavement and setting of the bounds,
for the Mansfield Turst Subdivision.
Motion: To 'send.a letter to Aetna Life and Casualty stating that the work
as 'outlined in the Planning Board's letter of October 15, 1973
is still not complete and the bonds will be held until this work
is complete.
(Wellington Latham, all in favor) VOTED
21. Boa _
at
Plai
It}
22. Boa
req
inf
Motion:
23. It was nc
Improveme
also regi
Y),,_
e 1
e 12, 1974 be notarized. Chairman Zattini
wn Clerk.
EO
fors
have
,
firer
r released.