HomeMy WebLinkAboutPlanning 09/11/1976PLANNING BOARD FIELD TRIP
Saturday, September 11, 1976
7:00 A.M.
7:00 A.M. Breakfast at Old Colony Diner
7:45 A.M. Meeting at Town Hall to review plans and subdivision control
procedure
8:15 A.M. Field Trip to review subdivisions that have been approved by
the Planning Board and are in various stages of development.
Listed below are the developments as they will be seen in the
order of the trip.
1. Peters Park - Park St. - Gene Ceccerelli - 5 single family lots -
complete through binder. Board holding securities
for balance of work - all lots released.
2. Bicentennial Court - Pratt Street - Housing Authority - 60 Multi-
family units - complete
3. Mansfield Industrial Park - Maple and Oakland Streets - Mansfield
Industrial Park Realty Trust - Francis Avenue complete
and accepted - Conners Avenue construction not
initiated.
4. Green Acres - Franklin and Maple Streets - Home Developers, Inc.
6 single family lots - no construction initiated.
5. Magna Vista II - Lawndale Road - Home Developers, Inc. -?33 single
family lots - water and drainage completed on all
roads. Board holding securities to guarantee
completion of the first 650 feet of roadway on
Lawndale Road - 6 lots have been released.
6. Elmwood Park (Bristol Arms Apartments) - Stearns Avenue -
Edward Stivaletta - 549 multi -family units: -
Bonney Lane has been completed and accepted -
water and drainage have been installed on Eric
Road - Board is holding securities for the balance
of improvements in Eric Road - all lots have been
released.
7. Canoe River Acres - Ware Street - Douglas King - 19 lots for
either single family or duplex units - roadways
have been completed through base coat - Board
is holding securities for completion of the
balance of improvements Lo all lots have been
released.
8. Gloria Estates - Ware Street - Allan Willis - 6 single family
lots - a portion of the drain line has been
installed.
-2-
9. Spruce Acres - Fruit/Hall Streets - Allan Willis - 15 single
family lots.- roadway completed through base
coat - Board is holding securities for the
completion of improvements on Hemlock Lane -
All lots on Hemlock Lane have been released.
10. Woodland Park - Fruit/South Main Streets - Rewlew Trust - 47
single family lots - no construction has been
initiated.
11. Riverside Park - Riverside Drive/Union Street Extension -
Robert Chavaree - roadway brought to subgrade,
water line installed and sewer partially installed -
no lots have been released.
12. Brookside Estates - Elm Street - Alfred Turinese and Conley Eagan -
42 single family lots - Brookside Drive has been
completed and accepted - all remainin g streets are
completed through base course - Board is holding
securities guaranteeing the balance of construction-
al] lots have been released.
13. Village Estates - Elm Street - Christian and Schromm - 59 'single
family lots - Section I is complete and the Board
is holding the contingency, which will be eligible
for release in December - Section II is complete
through finish coat of bituminous concrete and the
Board is holding securities to guarantee the balance
of construction - all lots have been released.
Section III is complete and the Board is holding
the contingency, which"iwill be eligible for release
in December.
14. Robert L. Rizzo - Otis Street - Robert L. Rizzo - 8 single family
®�mI ots - roadway has been graded to subgrade - no lots
have been released.
15. Wayside Estates - West/Gilbert Streets = Robert L. Rizzo
development has a capability of a maximum of 210
units including duplex and single family units -
a portion of Wayside Drive and Saddleridge Road
and all of Old Farm Road and Black Pond Road have
been completed and accepted - the water line has
been installed in the remaining portion of Wayside
Drive and Saddleridge and Carriage Lane - the
drainage has also been installed on these three
streets as well as a portion of Cranberry Road -
development is presently at a standstill due to
problems with percolation tests - no additional
lots have been released.
16. Circle C Estates - West Street - Sidney Covich (Millhaus Realty
rust) - 33 single family lots - Morgan Road and a
portion of Maverick Drive have been completed: Pinto
Way and the remaining portion of Maverick Drive have
been completed through base course - Board is holding
securities for the completion of the drainage system
and Pinto Way - 12 lots on Maverick Drive and Morgan
Road have been released and 11 lots on Pinto Way
have been released.
-3-
17. Camelot -at -Mansfield - Tremont/Williams Streets - Sidney Covich
and James Antosca (Camelot Trust) - 6 single family
lots - construction has not been initiated.
18. Interstate 95 Industrial Center at 495 - Cabot, Cabot, and Forbes
Industria Park - .more t an 4 miles of roadway
have been completed within this development through
the binder coat of butiminous concrete - Board is
holding securities to guarantee the completion of
all of the remaining required improvements on
roads where construction has initiated - there are
approximately 2 miles of roadway on the westerly
side of Route 495 where construction has not been
initiated - all land within the development has been
released for building purposes.
19. Walnut Park - Walnut Street - Casa Realty - 22 single family
lots - the roadway system has been completed and
accepted - Board is still holding securities for
the completion of the drainage system.
20. Foxfield Estates - Fox Street - Val Scarpellini - 4 single
family lots - improvements are complete through
base coat of bituminous concrete - Board is holding
securities for the completion of improvements for
the first two lots, which have been released.