HomeMy WebLinkAboutPlanning 09/17/2017MANSFIRLD PLANNING BOARD AGENDA
SEPTEMBER 1�, 1980
call to order 700 pm
clerk's teport
correspondence
minutes of September 1p and 11
warrant
visitor's agenda
81oopm Paul Boyden site plan Chauney and Central Streets.
8115 Mr. Slowick , Bellavists Ave.
8130 J. Kelly, Renlew Trust,F,xeess MAterial Removal
Old Business
Richard Morse Gravel Removal Elm St. lo/22/80
Charles Ash Gravel Removal Elm St. 9/25/80
Beeohwood Estates (finish Rond)
Status of Plans
New Business, 9(a`lox
Corres omdence
Public Discussion
Date next meeting NB1111
Around the tab3e Please read the resumes -
Adjournment Decision on the 22 thruR6
MANSFIELD PLANNING BOARD
MINUTES
September 17, 1980
Present: Chairman Flynn, Clerk Kaufman
Planners: Genatossio, Seifert, Parsons, White, Brugliera
1) Chairman Flynn opened the meeting.
2) Correspondence was read by Clerk Kaufman from the following:
Letter from the Massachusetts Executive Office of Communities and
Development informing the Board that Mansfield has not been selected
for the grant they applied for to prepare a water quality management
plan for the protection of the Town's ground water resources.
Legal notice from Sharon Board of Appeals on a hearing on September 25,
1980 at 7:30 P. M. on the application of Enid D. and Alan M. Rutstein
for a variance to operate a day care center at 46 Longmeadow Lane.
The Beacon publication from the Massachusetts Municipal Association.
Letter from Cabot, Cabot and Forbes submitting three copies of an
application for site plan approval for Spec 1115.
Planning and Zoning Newsletter from the Massachusetts Federation of
Planning Boards on Annual meeting to be held at Framingham.
Copy of the Board's letter to Konstantinos Boutas of Home Developers,
Inc. on the release of Securities in the Magna Vista II Subdivision.
Letter from RIM Engineering Company resubmitting the Paul Boyden
site plan application for land on Chauncy and Central Streets.
Letter from Charles P. and Hazel F. Ash requesting a two week extension
on their gravel permit application.
Copy of a letter from Cecil L. and Edna E. Morse of Branch St. to Mrs.
Oma M. White and Mrs. Nancy C. Eames directing them to spread the
material stockpiled along the banks of the Back Bay Brook by their
property to a depth of not greater than 18" above the present elevation.
Letter from SRPEDD announcing a program called "Economic Development in
the 80's to be on November 8, 1980 at the Southeastern Massachusetts
University in Dartmouth.
Minutes
September 17, 1980
Page 2
3) The Board met with Paul Boyden to discuss his site plan application for
land on Central and Chauncy Streets. Chairman Flynn told the Board that
Mr. Slowick of Bella Vista Avenue is interested in this application and
she told him to come in and look and the plans. Chairman Flynn read
the letter from RIM Engineering on this application. Mr. Boyden told
the Board that as far as parking is concerned on the plan it is the
same as it was. There is a large area that could be used for parking
that the Building Inspector said was alright. Mr. Maloon told the Board
that they added the bituminous curbing to the plan and put the loading
areas on, the signs are on it, the shrubbry ,has been removed and the
existing trees that are staying have been put on,.the outside benches
have been removed. Mr. Boyden told the Board that there would be three
or four separate establishments in the area. Mr. Maloon told the Board
the lot coverage would be around 19%. Mr. Boyden told the Board the
buildings would complement each other and would be solid block concrete
with split brick in the front. Planner Parsons noted that he felt they
were under the requirements of the by-law for parking. He is required
to have three square feet of parking for every square foot of retail.
I think it comes out to about 83 spaces.
Motion: To have the requirements in the By-law for parking clarified
by Town Counsel.
(Seifert - no second)
Motion: That the Building Inspector be instructed that the Planning
Board reviewed this site plan and finds it not in conformance
with the Zoning By-law because it is lacking in the required
number of parking spaces for the retail sales area.
(Parsons - White; Parsons, Genatossio, White, Flynn, Brugliera
in favor; Seifert, Kaufman opposed) VOTED
4) Planner White left the meeting while the Board met with Attorney James
Kelly.; to discuss the Woodland Pat Subdivision owned by Rewlew Trust.
Mr. Kelly introduce Attorney Ronald Bray from North Attleboro representing
the contractor working for the developers. Attorney Kelly told the Board
he wanted to bring them up to date of what has been happening. The
relocation and lowering of the Back Bay Brook has been done from the end
of the development down to property of Nancy Eames, New England Realty
Trust.He noted that there are materials stockpiled along the bank of
the Brook as a result of the digging. Mr. and Mrs. Cecil Morse who own
about 1,000 feet along the brook informed us that they own the stockpiled
material and they requested that the material be spread over their land.
We have written authorization from Mr. and Mrs. Morse to do this. We
wanted to make sure the Planning Board approved of our doing this. He
noted that the Morse property is not particularly low but he didn't have
any elevations.
Minutes
September 17, 1980
Page 3
Motion: That the. Board has been advised by representatives of Rewlew
.Trust of their intention to spread material on the Morse
property and find no objections to the proposal.
(Parsons - Seifert, all in.favor) VOTED
5) It was noted that there is nothing new on the Morse gravel removal
application for land on Elm Street.
6) The Board discussed the application for gravel removal submitted by Mr.
and Mrs. Charles P. Ash off Elm Street. Whitman and Howard have
started the test according to the Town Manager.for the well. Chairman
Flynn read a letter from Mr. and Mrs. Ash agreeing to give the Board
a two week extension on their application.
Motion: To accept the two week extension offered by Mr. and Mrs.
Charles P. Ash for their gravel removal application.
(Seifert — Parsons, all in favor) VOTED
7) Chairman Flynn told the Board that there have been complaints about
the top coat not being applied on Heather Lane and Paula Lane in
Beachwood Estates. Planner Brugliera told the Board that there are
just steel plates over the catch basins, no grates; the granite curbing
is falling and has to be reset. There is a substantial amount of work
to be completed. Planner Brugliera told the Board he had talked to
Peter Fontanini and Franklyn Allen, Jr. and they told him they would
be working in there within two weeks. It was noted that other members
of the Board felt that Planner Brugliera was in conflict because he
lived in the development and planned to build two more homes there.
Chairman Flynn read the section on conflict from the Planning Board
rules and regulations.
8) The meeting adjourned.