HomeMy WebLinkAboutPlanning 05/08/1985PLANNING BOARD'S
MINUTES
MAY 8, 1985
Present: Chairman Brugliera, Acting Clerk Genatossio
Planners: Flynn, Bachman, Boldrighini, and Fiore*
Planning Director Mannarino
1. Meeting called to order at 7:30 P.M.
2. Motion: To have Planner Genatossio be Acting Clerk.
(Boldrighini - Flynn - All in favor)
3. Site Plan - Office Building - Copeland Drive
*Chairman Brugliera left the meeting before this discussion began.
*Acting Clerk Genatossio to be Temporary Acting Chairman.
*Planner Flynn to be Temporary Acting Clerk.
Temporary Acting Clerk Flynn read the correspondence pertaining to this
Site Plan. Planning Director Mannarino stated that he was concerned with
the fence because he believes that it should be placed so that it blocks
the residential area of this plan from the remainder of this land which
is General Business. He also stated that in order to distinguish the
parking area of this plan from the turn around area, a berm should be
placed here and it should be landscaped, instead of just having the vert-
ical white lines that are proposed as this would be very difficult to
enforce. James Perkoski, Attorney for the applicants of this plan, stated
that any requirements that the Board would like to see on the plan can be
incorporated onto the plan if not already present. Mr. Perkoski submitted
the drainage plans of this site to the Planning Board and stated that the
sewer connection has not yet been applied for, but the water and sewer
lines will be bought in from Creeden Street to this property. There was
concern from the Board as to the number of employees which would occupy
this building and the parking for these employees being included in the
parking requirements needed for customers. Mr. Perkoski stated that the
exact number of employees would be unknown until the building is occupied,
but that it would not be a large number of employees because this is a
two-story building, 3600 square feet and there would only be four offices
at the maximum. The Planning Board members felt that the applicant must
devise a solution to this parking problem in order for this to be approved.
Planning Director Mannarino stated that he believes this plan needs to be
redesigned.and resubmitted to the Planning Board.
Motion: To send a letter to the Building Inspector concerning this Site
Plan on Copeland Drive stating that the concerns of the Planning
Board deal with the employee parking, the redesign of the
entrance ways, concerns about where the fenced area should be,
concern over whether the dumpster is required, the DPW Director's
comments on the drainage especially if the plan is to be revised,
the concerns of the Fire Chief on the hydrant and the concerns of
the Planning Director on landscaping, traffic circulation and
fencing.
(Flynn - Boldrighini - Genatossio) (Bachman abstained) PASSES
Planning Board's Minutes
May 8, 1985
Page 2
*Chairman Brugliera re-entered the room after this discussion was over.
*Acting Chairman Genatossio to return to Acting Clerk's position.
*Acting Clerk Flynn to return to Planner's position.
4. 8:00 P.M. - Public Hearing - "Chambers Court" definitive subdivision plan
The public hearing for "Chambers Court" definitive subdivision plan, a
seven (7) lot subdivision off West Street, began at 8:00 P.M. The
hearing was closed at 8:45 P.M. A copy of the transcript is available
in the Planning Department office.
5. 8:45 P.M. - Public Hearing - "Mansfield Manor Estates" definitive subdivision
The public hearing for "Mansfield Manor Estates" definitive subdivision plan,
a 58 lots subdivision off Fruit Street, began at 8:45 P.M. The hearing
was closed at 9:50 P.M. A copy of the transcript is available in the
Planning Department office.
6. Review "Westview Woods" definitive subdivision plan - 11 lots off West Street
Edward Broderick, applicant of this plan, approached the Board and stated
that he had a meeting with Joseph Zeneski, DPW Director; Joseph Mannarino,
Planning Director: and Ralph Maloon, Engineer of this plan; to discuss an
alternative plan which he believes has solved the problem with the bulb at
the end of the roadway that the Planning Board was concerned with. This
plan contains three grease traps and an additional four more lots; the
retention area would be placed on an island in the middle of the roadway
with a chainlink fence and platings surrounding it. Planning Director
Mannarino stated that there is such a substantial change from the original
plan to this plan, that the Planning Board cannot act on it; if the
applicant wants the Board to act on this plan than it must be resubmitted
and readvertised so that the abutters have a chance to voice their concerns.
Chairman Brugliera stated that the road for the proposed alternative plan
is considerably longer than the 650 foot regulation for a dead end roadway
under the Mansfield Subdivision Regulations and that the Board has never
waived this requirement; and there is also going to be a problem with having
the island with the retention area in the middle of the roadway because of
the two-way traffic. The Board showed concern at the last discussion of
this proposed subdivision regarding the cut of the roadway; Mr. Broderick
stated that the cut of the road is still going to remain the same, it has
not been changed because the main concern of the Board was with the reten-
tion basin and he has tried to amend that problem. The Board asked Mr.
Broderick if he could obtain an easement to the brook. Mr, Broderick re-
plied that he does not believe that it is possible. Acting Clerk
Genatossio stated that she would rather have the retention area than to
have the water go to the brook because it is going to be the best way to
recharge the area because of the proximity of the well, and that if the
water goes directly to the brook it will not be cleansed the way it will
if the water goes into the retention area first, then back into the ground,
but she also stated that she would rather have the retention basin where
it was placed before. Planning Director Mannarino stated that he, too,
would rather see a retention area, but he was hoping to see a much smaller
retention area because it would be less of a maintenance problem for the
Town. Chairman Brugliera informed Mr. Broderick that the Board is not
pleased with this plan and it should not even be discussed because it is
Planning Board's Minutes
May 8, 1985
Page 3
a totally different plan that was originally submitted and reviewed. Mr.
Broderick stated that he would like some guidelines from the Board so he
will know what direction to go with the plan. Planning Director Mannarino
stated that the diameter of the cul-de-sac is 120 feet and there should be
a 50 -foot layout for the roadway around the island. He also stated that
the applicant did test boorings and went to an elevation of 144 feet and
there was no evidence of water, the cross section area was not done on the
plan as the Board requested, an access road has not been found, there is
the problem with the issue of the pavement up to the lot line instead of
the grassy section which Mr. Broderick proposed - this grassy section would
become the responsibility of the Town, there is a problem with the two-way
traffic around the retention area, and it was also stated that the Fire
Chief requested that the pavement of the road be more than 35 feet for the
cul-de-sac area. Planner Fiore stated that he believes the Board is going
to need an extension because they have not been able to discuss this plan
amongst the Board and he does not believe they are ready to make a decision
on it. Mr. Broderick presented the Board with a request for an extension
until May 31, 1985.
Motion: To accept the extension request until May 31, 1985.
(Boldrighini - Genatossio - All in favor)
7. Correspondence
A letter from Mr. Edward Broderick, applicant of "Westview Woods" definitive
subdivision plan, to the Mansfield Planning Board requesting an extension
of time to review this subdivision plan from May 10, 1985, until May 31, 1985.
A memorandum from Joseph Mannarino, Planning Director, to the Mansfield
PLanning Board, concerning the partial release of performance guarantee for
Morrow Street in the amount of $500.00 for the wire and trench which has
been inspected by Mr. John Larch, Mansfield Light Department Manager.
A copy of the Building Construction for the month of April, 1985.
A copy of the Planning Board's Pending Business list.
A copy of the Planning Board's Agenda for May 8, 1985.
A copy of a notice of hearing from the Town of Mansfield Zoning Board of
Appeals. A hearing will be held on May 21, 1985, at 8:00 P.M. on the
application of Donald H. Ploof to construct additions to an existing
structure at 360 Otis Street, said additions being an expansion of an
existing non -conforming use.
A letter from the Law Offices of Beard & McNicholas to Joseph Mannarino,
Planning Director, concerning the release of Planning Board Covenant for
10 Pinto Way.
A copy of a letter from Gerald E. St. Hilaire, Assistant Secretary Division
of Municipal Development, to Mr. W. Chadwick Maurer, Jr., Town Manager,
stating that the Executive Office of Communities and Development has com-
pleted its review of the master plan update applications and they were
unable to honor the Planning Board's request in this year's funding.
A copy of a letter from the Conservation Commission concerning the notice
of surplus properties on South Main Street and Route 140 in Mansfield.
Planning Board's Minutes
May 8, 1985
Page 4
A letter to the Mansfield Planning Board from Mr. Edward Broderick, The
Broderick Corporation, stating that The Broderick Corporation will be
developing the Camelot at Mansfield subdivision on Williams and Tremont
Streets and would like the Planning Board to review the plans and recommend
what changes are needed to be made in order to comply with current sub-
division standards or zoning regulations.
A copy of a letter from Joseph D. brugliera, Chairman of the Mansfield
Planning Board, to Mr. Bertram M. Cook, Inspector of Buildings, concerning
the adequacy of First Street to handle two (2) additional house lots.
A letter from Paul J. Folkman, President of The Folkman Company, to the
Mansfield Planning Board, concerning Highland Avenue Extension Preliminary
Subdivision plan.
A copy of a letter from Bertram M. Cook, Inspector of Buildings, to Mr.
and Mrs. Alain Meyer, 160 Franklin Street, stating that their application
for a building permit at 160 Franklin Street has been denied.
A letter from Joseph D. Brugliera, Chairman of the Mansfield Planning
Board, to Mr. Bertram M. Cook, Inspector of Buildings, stating that the
Planning Board reviewed building plans for an addition to a single family
dwelling at 160 Franklin Street and voted to support the Building
Inspector's decision to deny this permit application.
A copy of a notice of public hearing from the Town of Mansfield Zoning
Board of Appeals stating that a public hearing will be held on May 21,
1985, at 7:45 P.M. on the application of Robert Collins for a variance
for a lot at 1112 School Street, saic lot having a front yard set back
of less than 40 feet which is non -conforming in an Agricultural Zone.
A legal notice from the Town of Foxboro Board of Appeals.
A legal notice from the City of Attleboro Zoning Board of Appeals.
A legal notice from the Town of Sharon Board of Appeals.
A legal notice form the Town of Foxboro Board of Appeals.
A copy of the Staement of Facts from the Mansfield Zoning Board of Appeals.
On April 2, 1985, the Board of Appeals voted to grant a variance on the
application of David P. Williams/Textron Inc. (Gorham Division) to convert
an existing structure at 26 Edgewood Street from manufacturing to office
use, said use being non -conforming in a Residence A Zone.
A copy of the Statement of Facts from the Mansfield Zoning Board of Appeals.
On March 19, 1985, the Board of Appeals voted to deny a variance on the
application of Kendall Square Associates to construct a building and parking
lot on land on Forbes Boulevard, said land located in Industrial, Agri-
cultural and Residence A Zones, said use being non -conforming in Agricul-
tural and Residence A Zones.
A copy of the Statement of Facts from the Mansfield Zoning Board of Appeals.
On April 2, 1985, the Board of Appeals voted to grant a variance on the
application of Kevin and linda King to construct an addition to an ex-
isting single family dwelling at 159 Lawndale Road, said addition having
less than 25 -foot sideyard which is non -conforming in an Agricultural Zone.
Planning Board's Minutes
May 8, 1985
Page 5
A copy of the Planning Board's Minutes for April 24, 1985.
8. Minutes of April 24, 1985
Motion: To approve the Minutes of April 24, 1985, as amended.
(Fiore - Flynn - All in favor)
Planner Fiore noted that on Page 4, under the discussion of Westview
Woods definitive subdivision plan - 11 lots off West Street, it should be
noted that all the Board members were not in agreement with the infil-
tration basin being constructed three feet above high water table as is
stated. Chairman Brugliera, Planner Flynn and Planner Fiore were not
comfortable with this concept.
9. "Morrow Street Extension" subdivision - partial release of performance
guarantee
Acting Clerk Genatossio read the memorandum from Planning Director
Mannarino to the Mansfield Planning Board concerning the partial release
of the performance guarantee for Morrow Street. This release is for the
installation of electrical wiring at the Morrow Street Extension sub-
division. Mr. John Larch, Manager of the Mansfield Light Department,
has inspected the work and the Planning Director recommends that $500.00
be released for the completion of the Wire and Trench, 250 linear feet.
Motion: To approve the partial release of the performance guarantee
in the amount of $500.00 for "Morrow Street Extension" subdivi-
sion.
(Fiore - Flynn - All in favor)
10. Wind Chime Drive
Planning Director Mannarino stated that there is a problem with the pond.
The lots that abut the pond will not be released until there is a per-
formance guarantee for the pond. He also stated that the Board needs to
sign an amended release form and Town Counsel will have it recorded so
that the amended form will take precedence over the old bond. Ronald
Bonvie, applicant of "Wind Chime Estates", will not build on these
lots and will start work on the pond.
Motion: To sign the amended release form for Wind Chime Drive.
(Genatossio - Fiore - All in favor)
11. Public Discussion
No comment at this time.
12. Around the Table
No comment at this time.
13. Date of Next Meeting is May 15, 1985, at 7:30 P.M.
14. Meeting adjourned at 11:00 P.M.
I'LL` �— DATE zz -IFS