HomeMy WebLinkAboutPlanning 03/06/1985PLANNING BOARD'S
AGENDA
MARCH 6, 1985
1. Meeting called to order at 7:30 P.M.
2. Clerk's Report
a. Correspondence
b. Minutes of February 23, 1985, and February 27, 1985
3. Review of Subdivision Plans:
o Maplewood Estates preliminary subdivision plan - 9 lots -
Maple Street - deadline 3/23/85
o Vankoert Farms preliminary subdivision plan - modified to 39 lots -
Franklin Street - deadline 3/13/85
o Highland Avenue Extension preliminary subdivision plan - 12 lots -
Highland Avenue - deadline 4/1/85
o Austin Farms definitive subdivision plan - 56 lots -
Winter Street - deadline 4/26/85
4. Discussion of Environmental Impact Statement
"Form A" plans
6. Around the Table
7, Public Discussion
8. Date of Next Meeting
9. Adjournment
PLANNING BOARD'S
MINUTES
MARCH 6, 1985
Present: Acting Chairman Brugliera, Acting Clerk Doucette
Planners: Genatossio, Bachman*, Flynn* and Boldrighini
Planning Director Mannarino
1. Meeting called to order at 7:30 P.M.
2. Motion: To have Planner Ronald Doucette be Acting Clerk.
(Genatossio - Boldrighini - All in favor)
3. Correspondence
A copy of a letter from Anthony N. Fiore, Jr., Chairman of the Mansfield
Planning Board, to Mr. Leon J. Bunk, Chairman of the Bristol Conservation
District, thanking the Bristol Conservation District for awarding the
Town of Mansfield with a $1,000.00 open space planning grant.
A copy of a letter from Anthony N. Fiore, Jr., Chairman of the Mansfield
Planning Board, to Mr. David White of 88 Tremont Street, stating that
the Board discussed Mr. White's request that they determine that certain
land be considered surplus material and they do not believe they can
approve such a request.
A letter from J. Ronald Pike, Senior Vice President of the Attleborough
Savings Bank, to'the Mansfield Planning Board stating that the Attleborough
Savings Bank is holding $127,436.10 in a construction loan, accounts
No. 52-055884-09 and No. 52-056088-6 for The Folkman Company, Inc. for the
purpose of a construction and completing Shannon Drive as shown on the
subdivision plan of Shannon Drive.
A -copy of a memorandum from Joseph Mannarino, Planning Director, to the
Mansfield Planning Board concerning the estimate, based on the 1985
Means Construction Cost Data, for Eastland Estates Subdivision performance
guarantee.
A copy of the Articles for the 1985 Annual Town Meeting to be held on
Monday, April 1, 1985, at 7:30 P.M.
An article concerning plannning, entitled "Planning Reconsidered - What is
the real purpose of planning? What should local planning agencies do?"
A letter from Alan E. Brown to the Mansfield Planning Board requesting to
readvertise for a public hearing to rezone the property owned by Emerson
P. Grant located on Copeland Drive, Mansfield, MA (Route 140). A copy of
the meets and bounds for said property was enclosed.
Planning Board's Minutes
March 6, 1985
Page 2
A copy of a legal notice of hearing from the Town of Foxboro Board of
Appeals, stating that a hearing will be held on March 20, 1985, for a
variance to allow construction of an inground swimming pool with less
than the required minimum street setback on property of Douglas B. Ritter
at 17 Spruce Street.
A copy of a legal notice of hearing from the Town of Sharon Board of
Appeals, stating that a public hearing will be held on March 14, 1985,
on the petition for a variance to the zoning by-law regarding lot area
in a water resource protection district and regarding minimum allowable
sewerage disposed on a lot in the water resource protection district
for two lots to be created from three existing lots near the intersection
of Morse Street and Massapoag Avenue.
A copy of a legal notice of hearing from the Town of North Attleboro
Planing Board to the Town of Mansfield Planning Board. The following
hearings will be held on Thursday, March 14, 1985:
William Boucher - to abandon Willard Street, an unaccepted paper street
which runs northerly from Fisher Street approximately 320 feet, located
between Regent Street and Oakhurst Street.
Fred Bottomley and Allen G. Riley - for approval of a residential cluster
plan referred to as The Ledges containing 54 dwelling units located
easterly of the intersection of Mt. Hope Street and Fisher Street.
Old Farm Realty - for approval as a subdivision Colonial Estates con-
taining 17 lots. Property is located easterly of Old Post Road.
A statement of facts from the Town of Mansfield Zoning Board of Appeals
to the Mansfield Planning Board concerning the application of the Mercury
International Trading Corporation to place a temporary trailer at 75 Forbes
Boulevard, said use being non -conforming in an Industrial Zone. This
variance application was denied on a three in favor and one against vote.
A letter from Edward C. Marcheselli, Treasurer of the Walmark Corporation
to the Mansfield Planning Board requesting an extesnion on the preliminary
plan of Vankoert Farms until March 29, 1985.
A copy of the building construction for the month of February, 1985.
A copy of the Planning Board's minutes for February 13, 1985.
A copy of the Planning Board's minutes for February 23, 1985.
A copy of the Planning Board's minutes for February 27, 1985.
A copy of a legal notice of hearing from the Planning Board of the Town
of Mansfield. The following hearings will be held on Wednesday, March 20,
1985:
8:00 P.M. - regarding the petition of ten (10) registered voters to revise
the Zoning Bylaw under Section V (Special Requirements) Subsection 1-2
(Wetland Protection).
Planning Board's Minutes
March 6, 1985
Page 3
8:45 P.M. - regarding the petition of ten (10) registered voters to amend
the Zoning Bylaws by adding to Section I General, Subsection E, Definitions,
language concerning an Adult Bookstore and Adult Motion Picture Theatre.
A copy of a notice of hearing from the Town of Mansfield Zoning Board of
Appeals. The following hearings will be held on March 19, 1985:
CTI - Cryongenics/Helix Technical Corporation - 7:45 P.M. - for a variance
for the installation of a second free standing sign at 375 Forbes Boulevard,
said sign being more than allowed in an Industrial Zone.
David P. Williams - 8:00 P.M. - for a variance to convert an existing struc-
ture at 26 Edgewood Street, owned by Textron, Inc., from manufacturing to
office use, said use being non -conforming in a Residence A Zone.
A notice of the Southeast Area Spring Meeting to be held on Thursday, April
11, 1985, at 6:00 P.M. at the Carleton House on Routes 24 and 123. A
reservation blank was enclosed.
A copy of a letter from Joseph D. Brugliera, Clerk of the Mansfield
Planning Board, to the Zoning Board of Appeals of the Town of Mansfield
stating that the Planning Board voted on February 27, 1985, to send a
negative recommendation on the variance request of Kendall Square Asso-
ciation for a variance to use a portion of land in the Agricultural and
Residence A District for an industrial parking lot.
A copy of a letter from Joseph D. Brugliera, Clerk of the Mansfield
Planning Board, to the Zoning Board of Appeals of the Town of Masfield
stating that the Planning Board voted on February 27, 1985, to send a
positive recommendation on the variance request of Carol and John Hurley
for a variance to change a non -conforming use in an Agricultural District.
A copy of the Planning Board's Agenda for March 6, 1985.
A copy of the Planning Board's Pending Business list.
A letter to the Planning Board concerning Chad Maurer's, Tow- Manager,
send-off party to be held on Thursday, March 28, 1985, at the Sheraton
Mansfield, at 6:30 P.M., tickets are $18.00 per person.
A copy of Memorandum of Law of Amicus Curiae, Massachusetts Department
of Food and Agriculture. Plaintiff is Bertram M. Cook, Inspector of
Buildings and Zoning Bylaw Enforcement Officer for the Town of Mansfield,
versus defendant Christopher Curvin.
4. Minutes of February 23, 1985.
Motion: To approve the Minutes of February 23, 1985.
(Genatossio - Boldrighini - All in favor)
5. Minutes of February 27, 1985.
Motion: To approve the Minutes of February 27, 1985.
(Doucette - Genatossio - All in favor)
Planning Board's Minutes
March 6, 1985
Page 4
6. Maplewood Estates preliminary subdivision plan - 9 lots - Maple Street
'Planner Flynn entered the meeting during this discussion.
Don Baker and John T. Mahoney approached the Board to present the proposed
subdivision plan which consists of 9 lots owned by the applicants, located
across the street from the recently approved Maplewood Estates subdivision.
The proposed subdivision would be located behind eight lots on Maple Street
Mr. Baker also stated that all the lots conform in size and that most of
the lots exceed the zoning requirements in area. Planner Genatossio asked
the applicants if the retention area that is proposed on this plan would be
maintained by the Town; the applicants replied that the retention area is
within an easement and that it is currently part of their property. Planner
Genatossio pointed out to the applicants that the drainge easement is on
Lot 29, which is a buildable lot, therefore, the Town will have to maintain
it. In general, the Board was concerned about the drainage and where it
would go after it ran off the lots; and that further clarification is needed
from the engineer that designed the plan. Planning Director Mannarino
voiced his concerns over the length of the roadway, which by regulation is
only supposed to be 650 feet, but well exceeds this amount; he also stated
that the engineer should come in with an overlay of the poorly and very
poorly drained soils and the wetlands, all of these factors would affect the
roadway and lot sizes. It was also pointed out by Mr. Zeneski, DPW Director,
that an oil/water separator must be added to the plan in the drainage area
because it is within the water protection district. John Mahoney asked the
Planning Board members how this subdivision would be affected by the Environ-
mental Impact Statement that the different developers are being asked to
participate in; the Planning Board member informed him that a letter was
sent to him regarding this and they would like him to attend the meeting on
Tuesday, March 12, 1985, to discuss the matter.
7. Vankoert Farms preliminary subdivision plan - 39 lots - Franklin Street
Acting Clerk Doucette read the DPW Director's memorandum regarding this
subdivision plan. Mr. Edward Marcheselli and Mr. Walter Mallet approached
the Board to discuss the proposed subdivision plan. The Planning Board
was concerned because of the water that is going to be, according to the
plan, dumped onto land owned by the Town of Mansfield and the Holmberg's;
and it was stated that this cannot be done without an easement from both
parties involved. An alternative drainage was discussed between Lots 7
and 8, so that the water would go from that point directly to the Canoe
River and there would really be no need to obtain an easement over abutting
properties. The Planning Board prefers this option over having a detention
basin on the plan and if the plan is redesigned in this manner only one oil/
water separator would be needed instead of two; the drain pipe would go
right to the Canoe River and there would be less of a maintenance factor.
Mr. Marcheselli and Mr. Mallet stated that they have spoken with the Butler's
concerning their driveway being so close to the entrance of the subdivision
and that the Butler's were very receptive to the idea of moving their drive-
way to correct the problem and that another meeting has been arranged to
finalyze plans.
.Planning Board's Minutes
March 6, 1985
,Page 5
F The Board received a letter from Mr. Edward Marcheselli, Treasurer of the
Walmark Corporation, request an extension on the preliminary plan of
Vankoert Farms until March 29, 1985, in order to allow the applicant to
incorporate the above mentioned points onto the plan.
Motion: To accept the request for an extesnion on the preliminary plan
of Vankoert Farms until March 29, 1985.
(Flynn - Doucette - All in favor)
8. Highland Avenue Extension preliminary subdivision plan - 12 lots -
Highland Avenue
*Planner Bachman entered the meeting during this discussion.
Paul Folkman approached the Board to discuss this preliminary subdivision
plan. The Planning Director, Planner Genatossio, Planner Flynn and Acting
Clerk Doucette walked the site on Monday, March 4, 1985. Mr. Folkman
stated that his attorney, Jim Kelley, is double checking to make sure that
there is no roadway layout for this parcel of land; and he also stated that
the only easement which is on the property is the power easement and he is
absolving any problems which may occur with this easement through discussion
with Massachusetts Electric. Planning Director Mannarino asked Mr. Folkman
if he had the easement right-of-way from Massachusetts Electric to
see what type of restrictions are on the property and the current and pro-
posed location of the light poles. Mr. Folkman replied that he is going
to send the Planning Director a copy of the easement right-of-way and the
field work that was done on this parcel of land. The Planning Board members
were concerned about the roadway and how it would blend in witht the roadway
that is already constructed in that area, especially the two corner lots
that were to be at the entrance to this proposed subdivision. Mr. Folkman
stated that he can grade down the road so that the width is the same as
the presently constructed roadway and that he will have the angles modified
in relationship to the corner lots. He will also submit a survey of the
existing abutters' buildings.
9. "Form A" plans
Madan - Winthrop Street - 3 lots
This "Form A" plan consists of a parcel of land in Mansfield situated on the
easterly side of Winthrop Street at the southeasterly intersection of Winthrop
Street and Warren Avenue. The reason this plan does not constitute a sub-
division is because the parcel is on a public way with no new roads proposed.
This "Form A" is to move the lot lines. The checklist is complete.
Motion: To sign the "Form A" plan.
(Doucette - Boldrighini - All in favor)
Madan - Winthrop Street - 1 lot
This "Form A" plan consists of a parcel of land in Mansfield sitated on the
eastelry side of Winthrop Street at the southeasterly intersection of
Winthrop Street and Warren Avenue. The reason this plan does not constitute
a subdivision is because the parcel is on a public way with no new road
proposed. The checklist is complete.
Motion: To sign the "Form A" plan.
(Flynn - Doucette - All in favor)
P,lanning Board's Minutes
March 6, 1985
Page 6
10. Austin Farms definitive subdivision plan - 56 lots - Winter Street
Planning Director Mannarino stated that the Planning Board should send the
applicant of this definitive subdivision plan a letter addressing the concerns
and comments regarding the plan.
Motion: To send the applicant of Austin Farms definitive subdivision plan
the comments and concerns regarding the plan.
(Boldrighini - Doucette All in favor)
11. Discussion of Environmental Impact Statement
Planning Director Mannarino presented a map to the Board that showed the
flow of water to the Whiteville Pond and the Canoe River, and outlined the
wetland and water bodies. The Planning Director requested that the Board
look over this map, get their ideas together about what they want accom-
plished from this study, and use the map as a basis for the meeting next
Tuesday; the objectives of the study must be outlined - the Board should
be looking at effects of traffic, water quality and drainage. Planner
Boldrighini stated that one of the biggest concerns is the peak flow of
drainage attributed to these subdivisions and how they will affect Whiteville
Pond and the Canoe River. The DPW Director stated that there are some as-
pects that the Board must consider for this study, such as; length of time to
complete the study, detail that the Board would like to get from the study,
and the amount of money to be spent for the study. Planning Director
Mannarino asked the Planning Board members if they would want to select a
few consultants to invite to the meeting that will be held with the developers
on Tuesday, March 12, 1985. The Board decided to contact the following people
and invite them to the meeting: Lycote; I.E.P.; F, S & T; and a traffic
engineer. How the consultant is going to be paid will be worked out at the
meeting. Paul Folkman, President of The Folkman Company, Inc., stated that
the only concern the devlopers have in participating in this study is that
they.have input into what is being studied and who is hired for the project.
Ther Board assured Mr. Folkman that this would be an unbiased study.
12. Performance Guarantee for Shannon Drive
The Planning Board received a letter from the Attleborough Savings Bank
stating that they are holding $127,436.10 in a construction loan, accounts
No. 52-055884-09 and No. 52-056088-6 for The Folkman Company, Inc., for
the purpose of construction and completing Shannon Drive. This amount
which the bank is holding coincides with the amount that the Planning
Director had estimated from the 1985 Means Construction Cost Data.
Motion: To accept the Performance Guarantee which was received from the
Attleborough Savings Bank.
(Doucette - Boldrighini - All in favor)
planning Board's Minutes
March 6, 1985
Page 7
12. Around the Table
Planner Flynn stated that the article which was for the rezoning article
on Fruit Street was advertised incorrectly in the paper. The article was
supposed to read to rezone from Industrial to Residence C, but it read to
rezone from Industrial to Residence A. She stated that this error should
be corrected and should be placed in the paper for another hearing to be
held on March 27, 1985. This notice would be placed in the Sun Chronicle
and a press release would be placed in the Mansfield News. All the
Planning Board members were in agreement.
*Planner Flynn left the meeting at this point.
Planning Director Mannarino informed the Board that Mr. Alan Brown has re-
quested another public hearing from the Planning Board regarding his rezoning
article for Copeland Drive (Route 140). The Planning Director stated that
the only way that he can bring his article to the Annual Town Meeting is to
obtain a favorable recommendation from the Planning Board because the article
was defeated at the Special Town Meeting; and the law states that an article
cannot be acted upon for two years if defeated at Town Meeting without ob-
taining a positive recommendation from the Planning Board; and also that if
the Board feels that this article will not get another positive recommendation
from the Planning Board than it should not be given another public hearing
because it will just be wasting everybody's time.
Motion: To readvertise and hold a public hearing for Alan Brown's rezoning
petition in order that this article may go to the Annual Town
Meeting. The public hearing will be held on March 27, 1985.
(Doucette - Boldrighini - Brugliera)
(Genatossio - Bachman opposed)
Planning Director Mannarino presented a definitive subdivision which was
submitted by Margot Jellinek for 11 lots off of West Street. The applicant
of this subdivision is The Broderick Corporation. The Planning Director
stated that a public hearing must be advertised for this subdivision, it
should be held sometime in April, either the first or the second week.
14. Public Discussion
No comment at this time.
15. Date of Next Meeting is March 12, 1985, at 7:30 P.M.
16
DATE
PENDING BUSINESS
March 6, 1985
o Fuller Estates definitive subdivision plan - 9 lots - Winter Street -
deadline 3/30/85
o Westhaver Farms definitive subdivision plan - 36 lots - Franklin Street -
deadline 3/30/85
o Austin Farms definitive subdivision plan - 56 lots - Winter Street -
deadline 4/26/85
o Maplewood Estates preliminary subdivision plan - 9 lots - Maple Street -
deadline 3/23/85
March 13, 1985
o Review various subdivision plans
o Public Hearing - abandonment of Billings Street
March 20, 1985
o Review various subdivision plans
o Public Hearing on various Annual Town Meeting zoning variances