1. Meeting called to order at 7:30 P.M.
2. 1 Site Plan-;Performinq Arts Center
Clerk;Brugliera read the comments from department
Joseph Zeneski's comment was that he has reviewec
ing arts center plans with the design engineer ar
design satisfactory. His only concern is over tl
the groundwater and whether the retention basins"
gads.
ie perform-
_inds the
iepth':of
regards to where the water table is, it it were to be higheri
to drain. We can dig pits to determine where that is. We are
at the edge of a fairly steep, down grading to the river, and
I suspect that we are well above the water table. In this case,
we have a wetland very chose to us. I am right at the ground
level in this case and relying ;on a berm to create the basin.
I am relying on the containment to cause the-detension
characteristics we are seeking. In both of "these instances,
1 am not digging out anything. '.Edward Sliney, Fire Chief's,
comments were as follows: (1) Gravel access road around
perimeter of facility for emergency vehicles' only.; (2) Access`
yc Y -;y avee ;-i tau. \�/ vase uivtc
hydrant by V. I. P. parking area. This has been added. ;(4)
Master fire alarm box on building (with internal system to be i
determined at later date). This will come in the architectural
drawings. (5) Two man detail at each event in main amphi-
theater (EMT's and fire truck). C The applicants have not had
a chance to talk to him about this. The applicants were 'going
to provide their own people, but Edward Sliney would like to
see his own men there. Electric Light Director's comment is
three ;phase power available at entrance. No apparent problems.'
Conservation Commission's comment is a notice of intent is to
be submitted for the approval. There is a hearing scheduled
for the 13th: Police Chief's comment is that he
Planning Board's minutes
Page 2
July 25, 1984
Performing Arts CenterContinued
forsees no insurmountable problems with the facility. However,
I would suggest that the following items be addressed:' (1)
Access roads, closed to the public, down both sides of the
facility leading` towards the rear for unimpeded access by
emergency vehicles. (2) Possibility of the developer absorb-
ing the
bsorb-ing,the costs of signs; that will be required on S. Main St.
and all adjoining roads, i.e., "No parking during performing
arts center events - Tow away zone." They seem to meet all
the criteria on the site plate checklist. The proposed pond
will be changed to basin so it will hold water year round. All
of the Planning Director's comments have been addressed. He
has been working with the applicants for the past couple of
weeks, and they have revised the plan according to the criteria
and comments which were made at their meetings. He finds every-
thing on the plan to meet the zoning regulations. The applicants
do not have an exact number of trees to be cut. The, tree cutting
ILL C L11G :. C11C1
involved in.
acoustical cc
sently lookir
also doing es
entering and
and prepare a
must meet; j he
They want to
the facility'
to put up anc
�s on the noise from the `site, 'Ion vehicles
ng the site. They will scale this all off`
There are certain regulations that they;
they did not know exactly what the 'level is.
ure that they are not sending noise out of
ghboring homes. It has been suggested to them
affln fancy to rni- nff (i -ha nnica frnm renin,
across. There will also be a`noise <fence all across the back
of the hill. The pump station will ;be the; developer's responsi-
bility. They will have town water coming, in for drinking water,
bathrooms, and fire protection. They would also dike to have
wells on the site in the event that there was a water problem
at some point down the road.
PlanningBoard's minutes
at Page 3
July 25, 1984
Performing Arts Center Continued
There was discussion reqarding not allowing the creation of
ponds on site.
Motion: To approve the revised site plan for the
Performing Arts Center incorporating all
the comments that were read this evening.
An original plan shall be submitted to
the Building Inspector.
(Brugliera - Doucette, all in favor) VOTED
At this point, the applicants thanked the staff for all their
time. They also noted that they are lin the process of contact-
ing Norton.`
3.' Margot Jellinek -'Wedgewood Estates Subdivision
Mrs. Jellinek advised the Board that for many years, she used
to accompanv the Planning Board on site walks. She also said
than in the by-law is states tnat uie rsami�aiy n�a,
obtain all the imput possible on a plan. She reviewed the
Wedgewood Estates, Subdivision plan and feels this is a very
sensative area. She said that this is the area that Chadwick`
Maurer wants to create a new well. The Planning Director said
that this plan is not located in the flood plain. It is
in :the C zone. Margot Jellinek said that this is not in the
flow. It is in the basin, and it is within the Water Supply
Protection District. She again noted that she feels this is
a very sensitive area and requested that the Planning Board
request a soil determination from Raynham. She feels very
strongly about obtaining an environmental impact study on
this. She also said that the Town has no civil engineer and
no hydroligist.
4, Gravel Removal -'Tree Farm - Franklin Street
The Planning Director presented the Board with the map which
was presented to him. Mr. Unger shows the ,area where he would like
to remove the material to build the roadway. He came before
the Board in 1983, and he presented the sane plan only he
showed another area that he was going to excavate. The
Planning Director did not receive any deep holes to determine`
where the water table is, and he does not have a'topographic
plan. The Planning Director said this seems not just to be
an excavation of .'gravel, but he thinks since this is in the
Water Protection District and close to the wells, that he
should provide the Board with'a little more detail on the plans.
Motion: To request Mr.` Unger to provide the Board with
topographical map and test wells to be put in
as specified by the Planning Director because
of our concern of the Water Protection District
and his proximity to the town well.
1CPnatnccin - Flvnn. all in favor) VOTED
Planning Board's ,minutes ;I
Page 4
July 25, 1984
5. ]Riverside Drive - Performance Guarantee
The Planning Board went on a site walk to Riverside; Drive.
The Planning Director said that every thing is built in the
subdivision except to the portion adjacent to the pond.
Mr. Broderick is now purchasing this from Mr. Smith, and
it is approximately; 380 feet of roadway that he would like ;
to construct. What is in the subdivision is bituminous
upright berm through the whole subdivision; and in the cul-
de-sacs, he has upright granite. What he would like to do,
he is asking for a waiver, is to continue the bituminous
concrete to about 8'feet from the radious and then use sloped ;f
granite curbing, rather than the upright. This is mainly ±
because of cost. The Planning Board went out and looked at
it. You have to vote now whether to grant a waiver or not.
This is just a cost, for him. The other parts of the subdivision
are done the way the by-law reads, and don't think this is
really a hardship. It is not a'hardship on the land. This
would not blend in with the area.
Motion: Not to grant the waiver on the extension
of the subdivision and to have it conform
to the existing subdivision with the upright
bituminous and also upright granite on the
radious.
incl:
Cat
Mot:
r Man'
Letter from the Town Engineer regarding the negot
upgrading the culvert under Maple Street. This 1
that his 20 acre subdivision represents 11.76, per
total 170 acre drainage area. The cost to the to
replace the drain would be $1,700; therefore, Mr.
be $200, which Donald A. Baker has agreed to 'cont
The applicant will extend" the fir
from Maple/Winter to the entrance of Langley'Driv
lights will be constructed in the subdivision, in
with the locations designated by the Light Depart
applicant has complied with the DPW Director's re
drainage system improvements. He has put the not
about the lack of 100 year flood plain. The¢proF
within the 100 year flood plain. The width of Ma
shown. Granite curbing shall be required accordi
subdivision regulations. The profile detail of t
headwall is shown. A note has been placed noting
poorly and very poorly drained soils. 'There has
"appeal after the 20 day appeal period. At this F
Board sianed the olan.
1a�,
ans
of
.-ibute.
a alarm system I
Four street
accordance
lent. The `!
luirement for
on the 'plan
:rty is not
)le Street is
ig to the
ie proposed
the amount ofl
)een no
)int, the
i
Planning Board's minutes
Page 5
July 25, 1984
7. Cabot Pond Town 'Counsel's Recommendation
Letter from 'Town Counsel to Chairman Fiore. Town 'Counsel
reviewed the file as requested by the: Board." He noted that
numerous extension have been granted on the Special Permit.
The last of 'which 'expired on June 1, 1984. His recommendation
is to recall the performance securities to be used by the Town
to complete this project. He also recommended releasing ;the
security posted by John P. Smith, who was to assume Robert
Chavaree's responsibilities on the pond. Town Counsel also
referenced the lack of cooperation from the applicants. The
Planning Director has only heard from Mr. Willis. The
Planning Direbtor`noted 'that there really aren't any alterna-
tives left. The Board has tried to negotiate with all the
parties, and this has dragged along too far.Positive action
must be taken. Planner Flynn noted that this project goes
back to when Chadwick Maurer was the Planning Director. The
Planning Director noted that there will be alot of work when
the bond is 'recall. The Board will have to meet with a number
of department heads. The Planning Director will have to meet
with the DPW Director and the Town Manager to find out what action
to take next. There are alot of piles of loam. Clerk Brugliera
said he thinks the: Board should get the points of process going;.
(
There is not much :that can be done this year. We could start
gearing to be ready for next spring and put out bids. Planner
Boldrighini said it is the Board's obligation now to get the
X30,000 to the Town. However, he does not feel itis the Board's
obligation to do any of the work or get involved in it. This is
between the 'Town Manager, the Planner., and the Director of Public
Works:. The 'Planning Director noted that he feels the Planning
Board will have to oversee it as it is under a special permit to
make sure that the plan is being complied with. It was noted
that the town may not be doing the work. It may be an outside
developer. it was noted that the Board tried very hard to
coordinate this project.,
Motion: To start :the procedures necessary to pull the bond
and obtain the ;$30,000.
(Genatossio - Doucette, all in favor) VOTED
The method of starting this procedure will be a letter to
Robert Chavaree and Allen Willis and John Smith, as well as the
banks to be written by the Planning Director, signed by the
Planning Board.
8• Form A - Fireside Realty Trust - Old Elm/School Street
This Form A'is located on the westerly side of the intersection
? of Old Elm and School Street. Lots shown have frontage on an
existing street, and they conform to zoning. All items on them
Form A checklist have been complied with.
Motion: To sign
(Doucette - Boldrighini, all in favor) VOTED
I
Planning Board's minutes
Page 6
i July 25,1984
9. Form A - Dustin - 'East Street
This Form A`consists of a piece of land designated Lot A on
the southwesterly side of East Street; and a piece of land
designated Lot B and Lot C, on the southwesterly side of ,East
Street. The Planning Director would like to do some research
on the land 'regarding what is existing out there whether they
nave given the town a right-of-way by changing something. If
this is the case, this is not a buildable lot because there
would not be enough frontage. The Board still has another
week to act on this. It was the concensus of the Board to
wait until next week on this plan.
10. Correspondence
Copy of a legal notice from the Foxboro Town Hall. A hearing
will be held on July J1, 1984, at 7 P.M. in the office of the
Building Commissioner before the Site Plan Review Board on the
application of Bird Street Realty Trust to construct a motel on
property located on the corner of Fisher Street and Rt. 140.
The above will also be reviewed by the Board of Selectmen on
August 7, 1984, at, 7:45 P.M.
Letter from 'Town Counsel to the Chairman regarding his recom-
mendation for Cabot's Pond.
Memorandum to distribution from Jacquoline Wilkins regarding
the Performing Arts Center - Environmental Notification Form.
Letter from the DPW Director to the Board regarding his
negotiations with Donald Baker on Maplewood Estates.
Copy of a notice from the Zoning Board of Appeals in Attleboro
on applications they have coming up August 2, 1984.
Copy of the 'Board's letter to Allen Willis regarding Gloria
Estates Subdivision.
Copy ;of the Planning Board's minutes of July 18, 1984.
Minutes of 'July 18, 1984
Motion: To approve
(Genatossio - Doucette, all in favor) VOTED
11. Around the 'Table
Planner Flynn noted that the hearing notices from Attleboro,
none of them abut Mansfield. Planner Doucette said he feels
that a member or members from the Mansfield Planning Board
should attend the hearing in Foxboro regarding the motel as
Fisher Lane is very close to Mansfield. The Planning Director
informed the Board that Witch Pond Estates public hearing is
also being held in Foxboro tomorrow night. He checked the
files and the Board never received a legal notice on this.
4
Planning Board's minutes
Page 7
{ July 25, 1984
12. Public Discussion j
Margot Jellinek said that she was in Foxboro and reviewed this
subdivision. This is a'definitive plan, and the plan states,
"Division of land in Mansfield at the rear of Lots Nos. 8, 9,
10, 11, 12, 13, 14, and 15" which will be shown on a plan sub-
mitted to the Planning Board of Mansfield. The building, on
these lots will be located along the rear lot line. Shelsug-
gested that a representative from the Mansfield Planning; Board
attend the meeting. She said the plan is much more substantial
than the preliminary plan the Board has seen. The Board has
not received a copy of the definitive plan yet. She also sug-
gested requesting buffer zone behind the above lots. She
noted that it does not indicate the amount of surface water
run-off on the plan. She again requested that a member of
the Board attend this meeting.'
13.Date of Next Meeting is Wednesday, August 1 1984, at 7:30 P.M.
14.' Adjournment
1
� a') !<d
L} K
i
DATE
a