August 1, 1984
Present: Chairman Fiore, Acting Clerk Genatossio
Planners: Flvnn, Doucette, Boldrighini, and Bachman
Y j01kCuuuI P1Q1111Q 11V
ting called to order at 7:30 P.M.
ion: To have Grace Genatossio be Acting (Clerk
(Flynn - Doucette, all in favor) VOTED
respondence
phlet from the Department of Agriculture entitled,
sources and Environmental Management Choices".
Copy of a
advising that the Flanning boara VOLeu w u1LuuL Lute aLuicl—
Savings Bank to transfer his performance guarantee'ot $20,000
to the Town of Mansfield`.
Copy of a letter from Chairman Fiore to Allen Willis advising
that the Board voted to 'direct the Mansfield Co -Operative
Bank to transfer his performance guarantee of $10,200 to the
Town of Mansfield.'
Copy of a letter from Chairman Fiore to Karen McNally, South
Shore Bank,,; advising that the 'Board voted to release John P.
Smith's $20,000 letter of credit for Cabot Pond.
Planning Board's minutes
Page 2
August 1, 1984
Copy of 'a letter from Chairman Fiore to Ronald Pike advising
that the Planning Board directs the Attleboro Savings, Bank
to transfer Mr. Chavaree's performance guarantee of $20,000`
to the Town for the completion of Cabot's Pond."
Memorandum from Joseph Mannarino to the Planning Board regarding
a performance guarantee in the amount of $6,820 for the Gloria
Estates Subdivision.
Letter from John G. Walsh, Walsh Contracting Corp., certifying
that the drain extension within Gloria Drive was done in accord-
ance with the construction specification of the Mansfield Sub-
division Regulations.
Letter from Joseph Zeneksi, DPW Director, to the Planning Board
regarding Gloria Estates drainage modifications.
Copy of the Downtown Advisory Committee's July 30, 1984 minutes.
Copy of a legal' notice from the Foxboro Board of Appeals. A
hearing will be held on August 15, 1984, at 7:30 P.M. on the
application of Paul Dillon for a variance to construct a single
family dwelling at 81 Willow Street.
Copy of hearing notices from the Foxboro' Planning Board. Hear-
ings will be held on 'August '9, 1984 as follows:
7:00 - John Case - renewal of gravel permit for land off Depot
Street.
7:30 - Delphis Soullier - renewal of gravel permit off Hunts
Bridge Road.
8:00 - Town of N. Attleboro'- renewal of gravel removal permit
off Plain Street.
4. Form A -`East Street - George Dustin
This Form A consists of a piece of land designated Lot A on the
southwesterly side of East Street; and a;piece 'of land designated
Lot B & Lot C on the southwesterly, side of East Street. Lots
have sufficient frontage on an existing "street. This is a land
court plan, and they ;are determining the boundaries.
Motion: To sign
(Genatossio - Flynn, all in favor) VOTED
5. Form A - Park Realty Trust Maple/Francis Streets
t This Form A consists of a parcel of land containing 10,716 sq. ft.'
located on the southerly side of Maple Street and the easterly side
of Francis Avenue, known as Lot No. 61. 'Condyne, Inc. is going
to acquire this piece of land. This is also a land court plan.
Motion: To sign
(Doucette-<Flynn, all in favor) VOTED
Planning Board's minutes
Page 3
( August 1, 1984
6. At 8 P.M., the public hearing began for "Wedgewood Estates"
definitive subdivision plan. The hearing was closed at
approximately 9 P.M. A copy of the transcript is available
at the Planning Department.
7.; At 9:15 P.M., the public hearing began for the "Morrow Street"'
definitive subdivision plan. A copy of the transcript is
available at the Planning Departments
B. Gloria Estates
The Board reviewed the letter of July 3, 1984, which itemized
additional information necessary. The Board has received a
letter from Walsh' Contracting,': as per Item No. 2.' Item No. 3,`
the drain pipe at the back of the cul-de-sac has to be verified
that it has been capped. This has not been done yet, but
Joseph Zeneski said this will be done on Thursday. A notation
has been added to the plan stating that the new drain line was
rnnc+rlt n i-Pli wii-hnllfF inRnPoi-inn- Tn rnfere_nce to the check
` Mr. Zeneski, the applicants would like to install the check
valves in the manholes. The Town Engineer feels this will be
a suitable<device/method. (Modification No. 1) In reference to
the unauthorized drain line constructed along the boundary of
Lot No. 6, the Board received a letter from Joseph Zeneski.
This states that he has reviewed the drainage system modifica-
tions, and he found Mr.-Maloon's narrative helpful. However,
the following are the remaining unanswered questions:
(1) How does the discharge of Lot No. 6 (pond) affect the
drainage system? i(2) How will the submerged condition at the
culvert from the'swale affect the inflow? (3) How will the
peak flow, occurring 15 'minutes sooner and for a longer period
of time, affect the flow through the drainage system? Ralph
Maloon did call Joseph Zeneski today jto discuss this, but Joseph
Zeneski has not had the opportunity to discuss this with him
in detail. i The catch basins at Station 3 + 4.N have the proper
manhole cover. The six :copies`. of the changes were submitted.
Joseph Mannarino has prepared a preliminary; bond estimate.
Basically, ;the following still rneeds :to be addressed:
(1) Bond
(2) Pipe has to be inspected to assure it capped.
(3) Check 'valves ;have to be installed
(4) ,Positive recommendation from Joseph Zeneski on drainage
r
system of Lot NO. 6.
Gary,Bresnick added that an additional catch basin will be
installed. As per discussions with the Town Engineer, this
catch basin is proposed to be a shallow catch basin so that
Planning Board's minutes
Page 4
August 1, 1984
the installation of this catch basin will not interfere with the
other utilities in the ground. The Board will receive alletter
from Joseph'Zeneski regarding this. The capped pipe will be
inspected tomorrow, and Joseph Zeneski will :be meeting with Ralph
Maloon on Thursday; morning. The Board requested that Ralph
Maloon put is responses in writing, after discussion.
Motion: As per the Town Engineer's recommendation, to allow
the check: valves to be moved from the property :line
to the catch basins. This work shall be bonded and
added to the preliminary estimate.', (Item'B (1) of the
July 3, 1984 letter.)'
(Doucette - Boldrighini, all in favor) VOTED
Motion: The Board will approve this plan contingent upon the
changes as follows:
1) The check valves will be moved to the catch`
basins.
2) The Board receives verification from the Town
Engineer that the drain pipe in the back of the
f cul-de-sac has been capped.
(t, 3)The Board receives a positive recommendation
from the Town Engineer on the drainage system
on Lot No. 6.
4) The drainage calculations being accepted.
(Genatossio - Doucette, all in favor) VOTED
Motion: To vote to adopt the Gloria Estates Subdivision' plan
dated July 26, 1984, including the recommendations
in the letter dated July 3, 1984, as amended on
August 1,-1984„ as follows:
(1) The check valves will be moved to the
catch basin.
(2) The Board receives verification from the
Town Engineer that the drain pipe in the
back of the cul-de-sac has been capped.
(3) The Board receives a positiverrecommenda-
tion from the Town Engineer on the drainage
system on Lot No, 6, and the drainage
calculations have been accepted.
(4) The 'Bond estimate is approved.
(Doucette - Boldrighini, all in favor) VOTED
t
9. Surplus Material Elm Street
The applicant of this is Stephen Benoit. The proposal is to
construct four greenhouses and ,make a nursery out of the remain
ing land. It is not indicated 'how much material will be removed.
Planning Board's minutes
Page 5
August 1, 1984
The property is 60 feet from :the wetlands.It was noted if
all he wanted to do was construct four greenhouses and create
a nursery, this 'could be accomplished by grading the area,
and no material :would have to be removed.l
Motion: To send'a letter to the Inspector of Buildings
stating that the Board does not feel this is a
surplus' material operation. The Board feels
this is a gravel removal operation and requires a
special permit. There are certain items that;
need to be addressed—such as, the amount of
material to be removed, the access roads, and
groundwater location'. The Board feels that this
is circumventing the gravel removal By-law of
the Town; and if he were really building a
nursery, there would be no need to remove this
material. The property could be properly graded
without' removing material
(Genatossio - Doucette, all in favor) VOTED
10. Around the Table`
RE:' Performing Arts Center
Motion: To send`a letter to DEQE stating that Mr. Drew
has been very cooperative with the Board, and
he has done more than what site plan approval'
requires in the site plan review.' Also to note
the Board's concern on the drainage and traffic
in this particular area.
(Genatossio -'Doucette, all in favor) VOTED I
Acting Clerk Genatossio informed the Board that she attended
the Witch Pond Estates hearing which was held in Foxboro las �
week. The ENA statement addressed the Foxboro wells, not now
this will affect Mansfield's wells. There are four lots in
the back of the plan which will extend into Mansfield.
Mr.'Zoppo'still has plans form Mansfield site, and ne'will
be before the Board in `r the future. The engineer said he would
contact Mr. Zeneski regarding installing an oil ;spill control'
device. A copy of the subdivision plan was to be sent to the
Planning Department; however, this has not been received.
Planner Flynn will obtain a copy of the plan from Foxboro.
11. Public Discussion
Margot Jellinek informed the Board that she also attended this
meeting. She asked for calculations on the amount of water
run-off from roofs, ect. which will be drained into the Wading
River. The Chairman of the Foxboro Planning Board requested'
Mr.;Zoppo to provide these calculations. Mrs. Jellinek was
suppose to receive a copy. However, she has not as of ,yet.
She requested that the Board obtain these calculations from
Foxboro.
Planning Board's minutes
Page 6
August 1, 1984
12. Date of Next Meeting is Wednesday, August 8, 1984, at 7:30 P.M.
13. Adjournment 11 P.M.