Loading...
HomeMy WebLinkAboutPlanning 05/13/1986PLANNING BOARD L P-'ri AGENDA 0j P, MAY 13, 1986 Present: Chairperson Flynn, Clerk Quinn Planners: Annino, Boldrighini, Genatossio, Madan Planning Director Callinan Town Engineer Campo Applicants & Engineers: Mike Trowbridge, RIM Engineering Ronald Bonvie and Paul Folkman Meeting called to order at 7:00 P.M. 16 "Massapoag Estates" Discussion on Drainage System: Joseph Campo, Town Engineer, recommended that the drainage be directed to flow only in Mansfield for the purpose of maintenance. Paul Folkman then asked the Board whether a combination of both leaching pits and retention basins would be more desirable than using leaching pits only, The Board discussed the proximity of wetlands to the site and the elimi- nation of many structures if the combination system was used. sed. Mr. Campo preferred the use of retention basins for a development this size. The Board agreed. Paul Folkman proceeded to discuss the cut of the road in order to direct flow to Mansfield. Mr. Campo explained that it was not necessary to allow further cutting of the road since additional drainage mains and their location would essentially perform all that would be necessary to direct the drainage solely into Mansfield. Motion: Not to allow any further cutting of the road in order to allow drainage into Mansfield. (Boldrighini - Madan - All in favor) Maple Street: Paul Folkman continued by raising the question of the traffic impact that this development will have on Maple Street (a concern raised earlier by some Board members). Mr. Folkman also asked the Board for their comments regarding Chief Earls memorandum of May 6, 1986 stating that his position has not changed, that he is still opposed to any subdivision off Maple Street, due to the condition of the road. Mr. Folkman outlined to the Board the following proposed improvements to the flow of traffic: 1. To improve sight distance to the west, willing to 0 level off a portion of Maple Street, under the direction of D. P. W. Planning Board Public Hearing May 13, 1986 Page -2- 20 Realign entranc pavement to 18 3. Cutting back me 4. To erect approp signs, ets. Discussion among the Board n to see Maple Street improve'� require in this regard. Ple Management Study wasrecentl priority for improving Maple of this development.' Phasir Mr. Ronald Bonvife "greed to satisfaction of himself, the that fifty (50) homes would year, but he was willing to to four years. The Board ra could be made a condition of agreement could be made betty The Board requested that a 1 It Director requesting his opin The Planning Director, Richa- was ,made to partially releasi cons ' tructed. Mr. Bonvie pre - he did state that the base c( installed before any homes w( *Joseph Campo left the meetin i Paul Folkmasigned extensioi At 8:15 P.M. the Board and al 2. ."Elmwood Park Development'-' Erick Road At this time, the'Bo'ard met wi Street pertaining to Elmwood I The Board was addressed by Mrs expressed concern over the fit septic systems - specifically spoke of a pre-existing pond w Lot #3. Mrs. Pietrafetta st thehousesare experiencing a their cellars. Mrs. Pietrafet septic systems to be installed e to more ofta 90' at Eeet (with painted ye lian so as to improve -iate signes, e.e. st embers was, generall but realized there - nner'Genatossio stat y completed and was Street should not b, g the development wa� the concept providin,1 other applicants an( have to be construct( discuss phasing for i iQOA -LJ- U U L. - V Ich was .ted that 'ery dif f a expres; on Lot 31 lot shown the resi( LCUlt prol "3ed a'con( 3, Erick I gle I widening 1low line) . access to Lot #4, op signs, directional r. that the'y would like Tas little they could .d that *the Roadway ,.oncerned that the changed as a result then discussed, it was to the the Board. He stated d within the first he subsequent three to whether phasing roval or a contractual I and the applicants. Counsel by the Planning at some discussion road was being a bond. However, d, at least, be :t on May 21, 19860 �s Avenue and East Ronald Buck, who d installation of Mrs. Pietrafetta the plot plan for s now living in with water in regarding the Planning Board Public Hearing May 13,-1986, Page -3- Chairperson Flynn asked the Planning Director whether he has reviewed the file in regard to -this subdivision. Mr. Callinan responded that the performance bond apparently has lapsed and, given the sixteen (16) years since the date of the original approval of Erick Road, it may be worth considering to proceed under Section 81W, Chapter 41, Motion: To proceed to rescind, modify or amend under Section. 81W, Erick Road. (Quinn - Genatossio - All in favor) Passes CLERK DATE