HomeMy WebLinkAboutPlanning 04/23/1986MINUTES
APRIL 23, 1986
Present: Chairperson Flynn, Clerk Quinn
Planners: Madan, Boldrighini, Genatossio, Annino and Fiore*
Planning Director Callinan
1. Meeting called to order at 7:30 P.M.
2. Clerk's Report
Minutes of March 19, 1986
Motion: To approve the Minutes of March 19, 1986, as amended.
(Genatossio - Madan - All in favor)
Chairperson Flynn stated that on Page 8 of these minutes, under the dis-
cussion of the Growth Management Council, it was stated that the grant
application was signed by the Chairman of the Planning Board and the
Chairman of the Board of Selectmen. Chairperson Flynn would like this
amended to read that it was the former Chairman of the Planning Board
that signed the grant application. This will be amended.
Chairperson Flynn stated that on Page 9 of these minutes, under the dis-
cussion of the Growth Management Council., it was stated that Acting
Chairperson Flynn stated that he would like all information sent out to
all the members. Chairperson Flynn stated that it should read that it
was Acting Chairperson Quinn, not Acting Chairperson Flynn. This will
be amended.
Minutes of March 24, 1986
Motion: To approve the.Minutes of March 24, 1986.
(Genatossio - Annino - All in favor)
Minutes of March 26, 1986
Motion: To approve the Minutes of March 26, 1986, as amended.
(Genatossio - Annino - All in favor)
Chairperson Flynn stated that on Page 5 of these minutes, under the dis-
cussion of the Appeal from the Decision of the Inspector of Buildings,
she was not noted as being in favor of the motion to send a letter to the
Inspector of Buildings with a copy to the Board of Selectmen and the Town
Manager regarding determination of site plans; she would like this so noted.
Planning Board's Minutes
April 23, 1986`
Page 2.
Chairperson Flynn stated that she would like to know if this letter was
sent to the Inspector of Buildings. Planning Director Callinan stated
that it has not been sent, but he has spoken directly to the Inspector
of Buildings about this matter. However, he will have a letter sent to
him in order that it can be documented,
Planner Genatossio stated that on Page 6 of these minutes, under the dis-
cussion of Foxboro Terminals, the Planning Director was supposed to check
on the matter of Attorney Gelerman contacting Whitman and Howard to arrange
for expert testimony with regard to the proposed use on the drinking supply
as well .4s the noise impact of the project. She stated - that she had thought
the Board wanted to contact Lycott on this matter. Planning Director
Callinan stated that Lycott was eventually chosen, but then the matter was
put in a pending status and, therefore, it was not pursued any further.
Minutes of March 31, 1986
Motion: To approve the Minutes of March 31, 1986.
(Genatossio - Annino - All in favor)
Planner Genatossio had a question as to who signs the Board's letters.
Planning Director Callinan stated that the Chairperson signs all decisions
of the Board, but as far as the other letters are concerned, it is really
up to the Board members.
*Planner Fiore entered the meeting at this point.
Minutes of April 2, 1986
Motion: To approve the Minutes of April 2, 1986.
(Genatossio - Quinn - All in favor)
Minutes of April 9, 1986
Motion: To approve the Minutes of April 9, 1986, as amended.
(Genatossio - Annino - All in favor)
Planner Annino stated that on Page 6 of these minutes, under the dis-
cussion of the buffer article, it should read that the plan shall be
stamped by a registered landscape architect, not just a registered ar-
chitect. There was discussion about how this would be worked into the
regulations because although the Board felt that this was a good idea,
they did not know how exactly it should be worded. Therefore, the Board
decided that the section within the Bylaw dealing with the site plans
should be revised. This item will be placed on the work list for the
Planning Board.
Chairperson Flynn stated that on Page 5 of these minutes, under the dis-
cussion of the buffer article, it should be stated that Planning Director
Callinan has no problem with the 25 foot buffer requirement because a
buffer is definitely needed; it should not read that Planning Director
Callinan has no requirement with the 25 foot buffer requirement because
a buffer is definitely needed. Chairperson Flynn would also like to know
if the Planning Director has received a letter from Town Counsel regarding
Planning Board's Minutes
April 23, 1986
Page 3
the definition of a bedroom and if a rough list of requirements and con-
cerns of the Board regarding the Planned Residential Developments was
drafted by the Planning Director. Planning Director Callinan stated that
he has not received a response from Town Counsel and that the rough list
has not been drafted as yet. The Board discussed the amendment which
they are making to this plan regarding the regulation only being valid for
a period of 12 months and how this could be enforced. After considerable
discussion, Chairperson Flynn stated that she would like a written re-
sponse from Town Counsel on the time period of which the regulation would
be effective, the definition of a bedroom and the rough list of require-
ments regarding the Planned Residential Developments for the Board in
order that* it can be reviewed for the Town Meeting.
Minutes of April 16, 1986
Motion: To approve the Minutes of April 16, 1986.
(Genatossio - Annino - All in favor)
Planner Genatossio stated that the Planning Board has hired Attorney
Gelerman for the matter of Foxboro Terminals. She stated that the Board
of Selectmen have now obtained Attorney Gelerman's services in dealing
with the matter of Tighe Trucking. She would like to know where the money
to pay Attorney Gelerman is coming from to pay this expense. Planning
Director Callinan stated that the money is coming from the allocation for
Town Counsel.
Planner Annino would like to know what action was taken on the site plan
which the Planning Board reviewed last week. Planning Director Callinan
stated that the Building Inspector spoke to the applicant and the plan
has become inactive.
Planner Genatossio would like to know if the "Form A" (ANR) plan which
the Planning Board approved last week for the Twin Oaks Associates ran
into the wetlands that are near this property. Planning Director Callinan
stated that the plan did not show the wetlands and the only reason that
the Planning Board is notifying the Zoning Board of Appeals and the Build-
ing Inspector is because this land was issued a Special Permit and the
intensity of the site was reviewed at the time of the granting of this
Special Permit. Planner Genatossio stated that she would also like to
notify the Conservation Commission about this matter in case there should
be any problems on this site. Planning Director Callinan stated that he
will notify the Conservation Commission.
3, .8:05 P.M. - Public Hearing - "Massapoag states" - 99 lots off Maple Street
The public hearing for the "Massapoag Estates" definitive subdivision plan
began at 8:05 P.M. At 9:10 P.M., this hearing was continued until Wednes-
day, April 30, 1986, at 8:00 P.M. A copy of the transcript is available in
the Planning Department office.
The following people spoke at this public hearing:
Paul Folkman - The Folkman Company - applicant
Ralph Maloon - RIM Engineering Co. - engineer
Ernest Cohen - 1046 Maple Street, Mansfield
Edward Rebello - 218 Massapoag Avenue, Easton
Gary Ellis - Easton
John Cuddy - Bird Road., Mansfield
Planning Board's Minutes
April 23, 1986
Page 4
4. .9:10 P.M. Meeting with the Board of Selectmen regarding the Growth
Management Council
I
Before speaking with the Board of Selectmen, the Planning Board briefly
discussed the matter of the Growth Management Council. The general con -
census of the Board was that a Master Plan Committee would be set up and
there would be a Growth Management Council which would be a subcommittee
of the Master Plan Committee. The concern which Planning Director Calli-
nan had was that the Council itself should decide how to break up in to
different subcommittees because it does not matter how it is broken up as
long as the job get done,
Upon entering the Board of Selectmen's meeting, Chairperson Flynn informed
the Selectmen that the Planning Board just resolved this matter. She stated
that since the Master Plan Committee is the more important of the two (2)
committees, this committee will be set up by the Planning Board. There will
be subcommittee of this committee to be set up as the Growth Management
Council which will deal with the affordable housing aspect of this plan.
Planning Director Callinan stated that the comprehensive plan project will
have to be completed within the next couple of months and the other project
is to be conducted along with the Town of Norton and the City of Taunton
dealing with the affordable housing. Therefore, he stated, this is really
two (2) separate projects. The first project 'dealing with the comprehensive
plan will be funded by the money which was appropriated at Town Meeting last
year. The second project will be funded by the grant money which was awarded.
He stated that the Growth Management Study and the Comprehensive Plan are one
and the same; the funding which was received is for a joint project which is
to address housing issues within the community and addressing articles that
will affect the housing issues within the community. He stated that this is
necessary since the housing issue is part of the Comprehensive Plan. He
stated that between the two (2) projects, everything will be addressed such
as housing, transportation, environment and Downtown development* it will
address the various issues of the Master Plan. Clerk Quinn stated that the
Master Plan Committee and the Growth Management Council will be separate be-
cause the Master Plan is the more important of the two (2) matters. Richard
D'Onofrio stated that he does not feel that the Master Plan is the overall
plan, he feels that the Comprehensive Plan is the overall plan because it
gives the Town an actual working plan. Planner Genatossio pointed out to
Mr. D'Onofrio that the Comprehensive Plan and the Master Plan are one and the
same. Chairperson Flynn stated that the Planning Board is very concerned that
the $25,000 which was appropriated at Town Meeting is being used in order to
get the grant money and they feel this is not appropriate because the Master
Plan addresses more issues than just affordable housing. The Selectmen had
a question as to how much money is needed in order to correctly finish the
plan. Planning Director Callinan stated that in terms of the project that
he proposed, between $20,000 and $38,000 will be needed. However, Planner
Boldrighini pointed out that in order to properly complete the Master Plan
or update it more money is needed. Selectman Harrington stated that the plan
should not just look at affordable housing, it must also look at the ramifi-
cations growth will have on the services within the Town. He would like to
know how much additional funding would be needed to do this project correctly.
Planning Director Callinan stated that $25,000 at the most would be needed
additionally to finish the plan. There was a question as to how long this
plan would take to be complete. Planning Director Callinan stated that it
would take at least 18 months to complete the plan because you are talking
Planning Board's Minutes
April 23, 1986
Page 5
bout a larger scope of services. Clerk Quinn stated that the Master
Plan Committee should be properly funded by Town Meeting vote and then
the Growth Management Council will be a subcommittee of the Master Plan
Committee and the Council will work with the money which was received
from the grant. Selectman Harrington stated that under this proposal,
the consultant will be working directly with the Planning Director; he
does not feel that this is the best way to approach the situation be-
cause he feels that the people within the Town should get actively in-
volved in updating this plan because they are more'familiar with the
Town than a consultant would be. Planning Director Callinan stated that
the consultant and himself would be speaking and interacting directly
with the public regarding this plan in order that they can obtain public
input. After further disucssion on this matter, it was decided that
there was not sufficient funding or sufficient detail as to what a Com-
prehensive Plan needs in order to go forward and as much as a Master
Plan is needed, the components have to be known beforehand; more details
are needed on this matter. The Board of Selectmen would like more de-
tails from the Planning Director as to what he wants to address and how
this fits into the Comprehensive Plan because further information is
needed in order to have the plan properly completed. It was discussed
that if this information is available before the end of the Town Meeting,
the additional funding may be able to be appropriated for this year and,
in that manner, will avoid any further delay. Both the Planning Board
and the Board of Selectmen felt that the Finance Committee should be noti-
fied of this matter,
5. Discuss "Wind Chime Acres" Subdivision
I
Chairperson Flynn stated that a few weeks ago, the Planning Board received
a letter from the residents at the "Wind Chime Acres" Subdivision regarding
the completion of the roadway work. The Board decided to have the appli-
cant of this subdivision come in and speak with the Board on this matter,
Paul Folkman approached the Board and stated that approximately one month
ago, he purchased the remaining lots in this subdivision from Ronald Bonvie.
At this time, he agreed to finish the work on the roadway; he hired'Peter
DeGirolamo to finish the roadway. Mr. Folkman outlined the work that needs
to be completed and stated that he hopes to have this portion of the work
done in May of this year. He also stated that an easement has been granted
to Cablevision in order that all the houses which are already built will
have an opportunity to install cable in their homes. Planner Genatossio
had a question regarding the pond which is on this site. Mr. Folkman stated
that they will be pumping down the pond and that they have not started ex-
cavating it yet, but they hope to have in done in conjunction with the sub-
division; Mr. Brunnelle will continue to do the work on this pond as he had
started the work when Mr. Bonvie was the owner of the subdivision. Planner
Genatossio had a question as to the stipulations which were placed on the
development of this pond from the Conservation Commission; she feels that
some research should be done on this matter. Chairperson Flynn stated that
the various members of the Board can come in during the week and review the
plan since it is so large and they may have more concerns regarding this
matter. Mr. Folkman stated that some of the light poles are up in this sub-
division, but there are no lights on the poles as yet; he stated that he
believes the fire alarm box has been installed and is in proper working con-
dition. Chairperson Flynn thanked Mr. Folkman for coming in and asked him
to keep the Board informed of all matters regarding this subdivision,
Planning Board's Minutes
April 23, 1986
Page 6
6. Review a Site Plan for National Developmerit
Gene Riley, Project Manager, approached the Board and stated that this
site is adjacent to the Sheraton Inn on Hampshire Street in Mansfield.
Mr. Riley outlined the utilities, grading and drainage plan for the
Board. He stated that this particular lot will have a proposed 107,000
square foot research and development building; there will be a shared
entrance with the Sheraton Inn which will have the required easements,
there are four (4) travel lanes - two lanes on each side with an island
in the middle. There is a second access to the property which is direct-
ly across, from the Codex building on Cabot Boulevard, this entrance will
basically be used for truck traffic. The total lot coverage is 73% on a
5.3 acre lot. He stated that perc tests have been performed in this area
and the material is very sandy; they dug through 22 feet of sand and
gravel before they hit the water table. Mr. Riley briefly outlined the
drainage system for the Board. Planner Genatossio would like the appli-
cants to make sure that all the truck traffic comes in from the second
access off of Cabot Boulevard rather then the access off of Hampshire
Street because she feels that the less trucks that go in through Hampshire
Street, the better off the site will be as far as congestion is concerned.
Mr. Riley stated that signs will be erected in order that the trucks will
be directed to that entrance, he also pointed out that there will not be
much truck traffic to this building, there will only basically be normal
deliveries and the moving in of the people in the building. Mr. Riley
pointed out to the Board that the drainage system was reviewed by the
Conservation Commission and Cabot, Cabot and Forbes and was approved by
both of these bodies. He stated that the pre -development run-off and the
post -development run-off are relatively equal and if there is an overflow
of the drainage, there is an easement that would catch this overflow and
empty out near Route 495. Clerk Quinn read the comments from the various
department heads. Mr. Riley stated that in response to the Town Engineer's
comment regarding the drainage detail and drainage easement - a 42" drainage
easement has been shown on the plan and they have received their sewer
connection permit and the detail was shown on the sewer connection plan.
Clerk Quinn asked if the Police Chief had been contacted regarding this
site. The lanscape architect of this site stated that she has spoken to
the Police Chief and he informed her that he feels this is the best use of
the site. The Board would like this in writing from the Police Chief.
Planning Director Callinan stated that in the Planning Board's recommenda-
tion to the Inspector of Buildings, a statement must be made regarding the
Planning Board's specific recommendation on the amount of compact car
spaces which they are allowing. The Board had no problem with allowing
35% of the spaces for compact cars as is stated on the site plan.
Motion: To send a positive recommendation to the Inspector of Buildings
regarding the site plan for National.Development for the site
located on Hampshire Street and Cabot Boulevard with the follow-
ing stipulations: the Planning Director's recommendation re-
garding the parking spaces, the recommendation regarding the stop
sign, the letter which must be received from the Police Chief and
the Town Engineer's comments.
(Quinn - Boldrighini - Genatossio - Madan - Annino - Flynn)
(Fiore was opposed to this motion) PASSES
Motion: To allow 35% of the spaces on this site for compact cars.
(Boldrighini - Genatossio - Quinn - Madan - Annino - Flynn)
(Fiore was opposed to this motion) PASSES
Planning Board's Minutes
April 23, 1986
Page 7
7. "Form A" (ANR) Plans - National Development Associates - Hampshire Street
The applicant of this "Form A" (ANR) plan is National Development Associ-
ates. This "Form A" (ANR) plan consists of an unimproved parcel of land
on the west side of,Hampshire Street near Cabot Boulevard. The reason
this plan does not constitute a subdivision is because each parcel shown
on the plan has adequate frontage under the Zoning Bylaw and Subdivision
Rules and Regulations for the Town of Mansfield, Massachusetts, The
checklist is complete.
Motion: To approve the "Form A" (ANR) plan for National Development,
.,.,Associates for Hampshire Street.
(Boldrighini - Madan - All in favor)
8. Discuss "Shiloh Estates" Definitive Subdivision Plan
Planning Director Callinan stated that Lots 11 and 12 currently have ex-
isting structures on the site and, therefore, there may be a problem with
enforcing the Subdivision Control Law on these particular lots so he is
suggesting that these lots be eliminated from the subdivision and approved
under a "Form A" (ANR) plan. Planning Director Callinan also stated that
Lot 1 should only have access onto the proposed roadway; if access is to
be onto Essex Street, the lot should be approved under a "Form A" (ANR) plan,
not the subdivision approval. Phillip Beatty, applicant, had no problem
with placing access on to the proposed street and, therefore, keeping this
lot within the subdivision approval. Planning Director Callinan stated that
a stop sign should be erected at the proposed intersection of Shiloh Drive
and Essex Street subject to approval by the proper authorities; the appli-
cant had no problem with this matter. Clerk Quinn read the comments from
the Town Engineer and the Board informed Mr. Beatty that they would like
these comments addressed on the plan with the exception of the comment re-
garding the drainage system tying into the existing Essex Street system
which the Board is not requesting because at this point it is not feasible.
Mr. Beatty agreed to incorporating all the comments from the Town Engineer
on the plan with the exception of the tie-in to the existing Essex Street
system. The Board read the letter received by the Soil Conservation Service
and although this letter stated that an easement was needed around the ditch,
after further review of the ditch, the Board found that this easement was not
necessary.
Motion: To approve the subdivision plan for the "Shiloh Estates"
subdivision plan subject to the comments made by the Town
Engineer with the exception of the tie-in to the existing
Essex Street system; access to Lot 1 should only exist
from the proposed street; Lots 11 and 12 should be en-
dorsed under "Form A" (ANR) plans and the stop sign shall
be erected subject to approval of the proper authorities.
(Boldrighini - Annino - Flynn - Fiore - Madan)
(Genatossio and Quinn abstained as they were not present
at the public hearing)
PASSES
9. Discuss "Jason Lane" Definitive Subdivision Plan
Planning Director Callinan stated that he has spoken to the Town Engineer
regarding the covering of the slopes within this subdivision on the reten-
tion area; the Town Engineer stated that the slopes would have to be hydro-
s-eeded in order to stabilize the slopes. Chairperson Flynn stated that the
Planning Board's Minutes
April 23, 1986
Page 8
Fire Chief would like a fire alarm box at Lots 7 and 8 within the sub-
division; the Town Engineer would like a note placed.on the plan that
"All elevations refer to U.S.0 and G. Datum and referenced to the Town
vertical control" and the plan should show the drainage easement area
in profile including the retention area and drain outlet and the plan
should also shown two (2) handicap ramps on.the radii. Planning Direc-
tor Callinan stated that he would like a stop sign placed in the appro-
priate location subject to approval by the proper authorities and the
date of the pertinent rules and regulations should be placed on the plan.
He also stated that access to lot 9 be through the proposed street only.
If not, this plan will have to be endorsed under a "Form A" (ANR) plan.
Motion: To approve the "Jason Lane" definitive subdivision plan
subject to the fire alarm box being installed at the proper
location, the comments from the -Town Engineer are incorpor-
ated on the plan; the stop sign is placed at the appropriate
location subject to approval by the proper authorities; the
date of the pertinent rules and regulations should be placed
on the plan; access to Lot 9 must be through the proposed
street only; the slopes of the retention area must be hydro -
seeded.
(Fiore - Annino - Boldrighini - Flynn - Madan)
(Genatossio and Quinn abstained from voting as they were not
present at the public hearing)
PASSES
*Planner Fiore left the meeting at this point,
10. Correspondence
The Planning Board received a bill from Gelerman and Cashman, Attorneys at
Law, regarding the professional services rendered on behalf of the Mans-
field Planning Board regarding the Foxboro Terminals Company. The total
amount of this bill is $1,072.00.
Motion: To forward this bill to the Board of Selectmen for proper
payment.
(Madan - Boldrighini - All in favor)
The Planning Board received a letter from the Easton Planning and Zoning
Board regarding a scheduled workshop meeting regarding water resources,
grounwater and groundwater protection to be held on Thursday, May 15, 1986,
at 7:30 P.M., in the town office building. The Easton Planning and Zoning
Board would like the Mansfield Board of Helath, Conservation Commission,
Wat6er Department and Planning Board to attend this meeting. Chairperson
Flynn stated that she would like memoranda sent to the applicable people
regarding this workshop meeting. This will be done.
The Planning Board received a letter from Ralph I. Maloon, RIM Engineering,
regarding the "Camelot at Mansfield" Subdivision, He is requesting a surplus
removal permit for 9,200 cubic yards to be removed from this site. After
considerable discussion, the Board decided to state that the hours of opera-
tion should be from 9:00 A.M. until 2:00 P.M., Monday through Friday. There
was a question as to whether the specific route should be stated or not. The
Board decided not to specify the route.
Motion: To send a positive recommendation to the Inspector of Buildings
on this surplus removal application. It shall be stated in the
letter that the hours of operation are from 9:00 A.M. to 2:00 P.M.
(Boldrihgini - Madan - All in favor)
Planning Board's Minutes
April 23, 1986
Page 9
11. Around the Table
Planner Genatossio stated that at Town Meeting it was brought up that
there is surplus material being removed from the fish and game area.
When she questioned this, she was told that there was no permit needed
for the Town to conduct this operation. She was informed by the Town
Manager that the Town is exempt from the regulations governing surplus
removal. She feels that the proper procedure should be followed for
the removal of this material.
Motion: To send a letter to the Town Manager with a copy to the
Building Inspector and the Board of Selectmen stating
that if, in fact, there is surplus material that is being
removed from this site, then the process listed in the
Zoning Bylaw must be followed for the removal of this
material.
(Genatossio - Quinn - Flynn - Madan - Annino)
(Planner Boldrighini was opposed to this motion)
PASSES
Planner Genatossio would like to know if the Special Permit for Fair-
field Park is complete because there were a lot of loose ends the last
time that the Board reviewed this project. She would like Planning
Director Callinan to check into this matter and report back to the Board.
She stated that this is one of the concerns that the Board has had in
the past with granting Special Permits and now, if the Planned Residen-
tial Development article passes at Town Meeting, Special Permits will
have to be granted for that also. She stated that in the Fairfield Park
matter, the Planning Board felt that their hands were tied and they had
no other alternative but to grant the Special Permit. She does not want
to get into the same type of situation with Planned Residential Develop-
ments. Planning Director Callinan stated that the Board had the discretion
at the time of the granting of the Special Permit to not allow this project
directly up to the lot line because even though this is within the Downtown
district and there is no requirement for setbacks, since this fell under
the Special Permit provision so additional items can be required. He also
stated that the enforcement of these, Special Permits has to be followed
through by the Building Inspector in order to get the best results from
these Special Permits because it takes constant monitoring of the develop-
ment from the Building Inspector,
Planner Genatossio stated that she would like the Planning Director to
work on a list of subdivisions that have been approved in the past, how
they are progressing, what work has been completed and general informa-
tion dealing with the subdivision. Planning Director Callinan stated that
he will get this list to the Board.
12. Discussion of "Cabot Pond"
Planning Director Callinan stated that Mainline Construction is in the pro-
cess of buying a portion of this pond and Mr. Allen Willis has spoken to
the Building Inspector regarding his portion of the pond. The Building
Inspector informed the parties involved that they must submit a work schedule
to him for the pond. The Building Inspector informed the Planning Department
that the pond should be completed by the end of August and Planning Director
Planning Board's Minutes
April 23, 1986
Page 10
Callinan informed the Building Inspector that the Planning Board would
like this project started as soon as possible. The.Building Inspector
stated that.if this project is not started soon, he will take the
applicants to court. Chairperson Flynn had a question regarding the
bond on this pond, Planning Director Callinan stated that the bond which
is being held is not of a large enough amount to complete the pond and
he feels that the Board should try to get the applicants to finish the
project. If the applicants do not finish the pond, they should be taken
to court to be made to complete the project,
Motion: To send the Inspector of Buildings a letter stating that
the Board appreciates the work which he is conducting on
this matter and they would like to be kept informed of
the issues regarding this matter.
(Madan - Quinn - All in favor)
13. Around the Table
Planning Director Callinan stated that he will be drafting an article for
the Town Meeting to withdraw the Planning Board's original article for the
60% lot coverage as the Planning Board had voted at an earlier meeting.
Chairperson Flynn stated that she would like the Board to reconsider their
vote on this article because she is trying to work on information regarding
this article. Planner Madan stated that the Board drafted this original
article and now they still do not know what direction they would like to
go; he feels that this issue needs more study. Chairperson Flynn stated
that she would like this item placed on the Planning Board's work list for
further study.
Planner Genatossio stated that she would like the Planning Director to send
each of the members a copy of the buffer article in order that they can re-
view it for the next session of the Town Meeting. Planning Director Calli-
nan stated that he will send the members each a copy of this article, but
that the first paragraph in this article may have to be amended because of
the manner in which it would affect residential property. Chairperson Flynn
stated that the Board should list the concerns of the Board on this matter
and address them to Town Meeting because she feels that this will give the
article a better chance of being passed. The Board decided to meet at the
High School on Monday, April 28, 1986, at 7:00 P.M., immediately before the
Town Meeting to discuss this article.
Chairperson Flynn stated that she does not know if she can address the
Board's positive recommendation on the Planned Residential Development
to the Town Meeting because she was opposed to this recommendation.
Planner Madan stated that Chairperson Flynn should just state the facts
when presenting the recommendation to Town Meeting. After that, she can
address the Town Meeting as a private citizen with her concerns. Planning
Director Callinan stated that he would like the Board to be aware that he
has expressed his own personal comments on Planned Residential Developments
to the Mansfield News (which are basically positive), so there may be an
article in the paper this week. Planner Genatossio asked him what other
articles he gave an opinion on to the Mansfield News. Planning Director
Callinan stated that he only gave his comments on Planned Residential
Developments,
Planning Board's Minutes
April 21, 1986
Page 11
14. Public Discussion
Nelia Phillips, 285 Hope Street., approached the Board and presented them
with pictures that she has taken regarding the trucks which are coming
from the Tighe Trucking site down Hope Street, She stated that she has
a concern with this because they are not following the stipulations which
the Planning Board has set down as far as the hours of operation and the
route which these trucks must travel. The Planning Board pointed out to
Ms. Phillips that the Inspector of Buildings makes the final decision on
these matters and that the Planning Board can only make a recommendation
as to what they see is correct in these operations. Planning Director
Callinan stated that he has spoken to the Building Inspector and he is of
the opinion that in the Zoning Bylaw, it is stated that earth removal is
between the hours of 7:00 A.M. and 3:00 P.M. which is the reason that he
issues the permit for these hours. After considerable discussion, the
Board decided that the issue of the surplus material permits has to be
reviewed and, therefore, this item will be put on the Planning Board's
work list,
15. Date of Next Meeting is Monday, April 28, 1986, at 7:00 P.M. in the High
School,
16. Meeting adjourned at 12:05 P.M.
IV1f
301e(o
DATE